Loading...
2021 Sign Off Transmittal - New Constructioni LEGEND — 99— EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. —[991— PROPOSED CONTOUR [98.4] PROPOSED SPOT EL. TH1 SIDE SETBACK 0 TEST HOLE 2T—SLOPE OF GROUND 2" PEASTONE DR GEOTEXTILEF2% UTILITY POLE TOP FOUND. EL. 100.0 FIRE HYDRANT NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRAWING *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM DICE ## 19-014 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED EXISTING 4 BEDROOM DWELLING DESIGN FLOW: 4 BEDROOMS @ 110 GPD = 440 GPD USE A 440 GPD DESIGN FLOW SEPTIC TANK: 440 GPD (2) = 880 USE A 1500 GAL. SEPTIC TANK LEACHING: SIDES: 2(33.5 + 12.83) 2 (.74) = 137 GPD BOTTOM 33.5 x 12.83 (,74) = 318 GPD TOTAL: 615 S.F. 455 GPD USE (3) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 4' STONE ALL AROUND , MA APPROVED DATE BOARD OF HEALTH (2=5% SLOPE) (10 % SLOPE) (-!--% SLOPE)75.0' BOTTOM TH-2 NO GROUNDWATER FOUND FOUNDATION— 12' SEPTIC TANK 16' D' BOX 12' FACILITYING NOTES 1. DATUM IS NAVD 88 2. MUNICIPAL WATER IS PROPOSED 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H -LQ 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED BENEATH AND 5' AROUND THE PROPOSED LEACHING FACILITY. 12. POOL FENCE SHALL HAVE SELF-CLOSING SELF -LATCHING GATES, SIZE AND MATERIALS TO MEET LOCAL AND STATE BUILDING CODE, ALL DWELLING DOORS OPENING TO POOL SHALL BE ALARMED TO CODE. ZONING SUMMARY ZONING DISTRICT: R-40 DISTRICT MIN. SYSTEM PROFILEALL SHALL BE 40,000 S.F. MIN. MARK DSTEM WITH MAGNETICTTAPE R 150' MIN. TO SCALE) COMPARABLE MEANS FOR FUTURE LOCATION. 30' PROVIDE MIN. 20" DIAM. WATERTIGHT (NOT SIDE SETBACK ACCESS COVERS TO WITHIN 6" OF FIN. GRADE CONCRETE COVERS TO WITHIN 3" GRADE REAR SETBACK 20' 2" PEASTONE DR GEOTEXTILEF2% BUILDING COVERAGE TOP FOUND. EL. 100.0 FILTER FABRIC OVER STONE BUILDING HEIGHT \ 98.0' MINIMUM .75' OF COVER OVER PRECAST SLOPE REQUIRED OVER SYSTEM • NOTE: 2" MIN. WALL � STT H-10 ' RISERS (TVP.) RISERS THICKNESS REQUIRED BLOCKS OR o 2'm 4"OSCH40 PVC PRECAST RISERS MORTAR ALL Dennis .. s" MIN. SUMP PIPES LEVEL 1ST 2 COMPONENTS H-10 MS Pond 1z" Mm. INr. DIN. - NDS (TYP.) INV'S EL 92.70 4' SIDES 10" 14" 000 0 00 E n°=v w s..°s° . - -... . o 1500 GAL H-10 MIN. 94.85' TEE SEPTIC TANK TEE 4' UQ. LEVELo°ono°000°o0 94.60. 0 0®®®®®���®®®® ®®®® WATERTEST D'BOX o ®®°® ®®®®® I��7JJ®®®®®®®®® 0 000 GAS BAFFLE:. ACNE OR EgUAL °o on00000?. 000°0 00 ' n+^-^ ^ FOR LEVELNESS 00$0$0$0 I�®® ®®HERS® �JHER ME B " 92.97' 2.80' o°o o LS `" xit 7 YDOnOnO"O"Ono"nnOnOnO"O"O"O"O"O"D"n"O"n"O"O�l 0 0 0 0 0 0 •onononononononononon000 m 85.5'1OYR 48" 00ononono o^o^o.r_n_n_n,n n o 0 o n r,r_nononononono, H-10 500 GAL. LEACHING CHAMBER BY ACME PRECAST OR EQUAL. 3/4"-1-1/2" DOUBLE WASHED STONE 4' :MIN. � (3} UNITS REQUIRED - ALL AROUND PRECAST STRUCTURES 6" CRUSHED STONE OR MECHANICAL OVERALL DIMENSIONS TO OUTSIDE OF STONE: 33.50' X 12.83' COMPACTION. (15.221 [2]) (2=5% SLOPE) (10 % SLOPE) (-!--% SLOPE)75.0' BOTTOM TH-2 NO GROUNDWATER FOUND FOUNDATION— 12' SEPTIC TANK 16' D' BOX 12' FACILITYING NOTES 1. DATUM IS NAVD 88 2. MUNICIPAL WATER IS PROPOSED 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H -LQ 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED BENEATH AND 5' AROUND THE PROPOSED LEACHING FACILITY. 12. POOL FENCE SHALL HAVE SELF-CLOSING SELF -LATCHING GATES, SIZE AND MATERIALS TO MEET LOCAL AND STATE BUILDING CODE, ALL DWELLING DOORS OPENING TO POOL SHALL BE ALARMED TO CODE. ZONING SUMMARY ZONING DISTRICT: R-40 DISTRICT MIN. LOT SIZE 40,000 S.F. MIN. LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 20' MIN. REAR SETBACK 20' MAX. BUILDING COVERAGE 25% MAX. BUILDING HEIGHT 35' PROP. BUILDING COVERAGE 7.5% LOCUS MAP SCALE 1"=2000'± ASSESSORS MAP 93 PARCEL 4-15 TEST HOLE LOGS ENGINEER: DANIEL E. GONSALVES, SE #13587 WITNESS: PHIL RENAUD DATE: 2/14/2019 PERC. RATE _ < 2 MIN/INCH CLASS 1 SOILS 4 ELEV, Rt 6q 0.. 88' 0" — 86' — o� A — LS LS 1OYR 4/2 1OYR 4/2 5 � 3" o � Dennis o MS Pond MS o 1OYR 5/2 1OYR 5/2 7 a Oakmont Or B B LS Locus xit 7 Yarmouth m 85.5'1OYR 48" Route 6 Campground � C z Q LOCUS MAP SCALE 1"=2000'± ASSESSORS MAP 93 PARCEL 4-15 TEST HOLE LOGS ENGINEER: DANIEL E. GONSALVES, SE #13587 WITNESS: PHIL RENAUD DATE: 2/14/2019 PERC. RATE _ < 2 MIN/INCH CLASS 1 SOILS PERC MS I I MS 150" 2.5Y 7/4 2.5Y 7/4 75_5 132' 75' NO GROUNDWATER ENCOUNTERED TITLE 5 SITE PLAN OF #42 SISTERS CIRCLE YARMOUTHPORT, MA PREPARED FOR ELIE BASSIL DATE: DECEMBER 8, 2020 REV.: DECEMBER 30, 2020 (POOLHOUSE) s4� Sccle:1 "= 20' y` AN Of Mqm. OF Iv15 Zr CA NEL Gm\ ,!', qn�� agcy ! 0 10 20 30 40 50 FEET -D j N -A h, I cSO ` ) off 508-362-4541 �2 P of fax 508-362-9880 \oFess�° o¢- > SISTER c°��.a� downcope.com p SUR oI,AL E 1:. mown cope engineering, i C civil engineers ?�.' ` land surveyors 939 Main Street ( Rte 6A) ATE DANIEL A. OJALA, P.E., P.L.S. YARMOUTHPORT MA 02675 19-014 4 ELEV, ELEV. 0.. 88' 0" — 86' — A A — LS LS 1OYR 4/2 1OYR 4/2 4" 3" E E MS MS 1OYR 5/2 1OYR 5/2 7 6 B B LS LS 30" 1OYR 4/4 85.5'1OYR 48" 4/4 C 82' FA C PERC MS I I MS 150" 2.5Y 7/4 2.5Y 7/4 75_5 132' 75' NO GROUNDWATER ENCOUNTERED TITLE 5 SITE PLAN OF #42 SISTERS CIRCLE YARMOUTHPORT, MA PREPARED FOR ELIE BASSIL DATE: DECEMBER 8, 2020 REV.: DECEMBER 30, 2020 (POOLHOUSE) s4� Sccle:1 "= 20' y` AN Of Mqm. OF Iv15 Zr CA NEL Gm\ ,!', qn�� agcy ! 0 10 20 30 40 50 FEET -D j N -A h, I cSO ` ) off 508-362-4541 �2 P of fax 508-362-9880 \oFess�° o¢- > SISTER c°��.a� downcope.com p SUR oI,AL E 1:. mown cope engineering, i C civil engineers ?�.' ` land surveyors 939 Main Street ( Rte 6A) ATE DANIEL A. OJALA, P.E., P.L.S. YARMOUTHPORT MA 02675 19-014 * WINDOW C: QTY 3 = Garage TOTAL 290.9 S.F. WINDOW SCHEDULE DOOR SCHEDULE LTR. QTY. ROUGH OPENING REMARKS GLAZING A 2 2'-61/8"X6-07/8" TW24410 DOUBLEHUNG 2X8.28=16.56 SF B 7 2'-47,V'x2'-47N' AW251AWNING 7x3.9=27.3 SF C 316)*. 2'-61/8"x4'-87/8 TW2446 DOUBLEHUNG 13x7.65=99.45 SF D 3 2' -8"X6' -F' 2868 STL.FIREDOOR R-5 MIN. E 12 2'-61/8" x 5'-6 7/8" TW2452 DOUBLEHUNG 12 x 10.2 =122.4 SF F 4P 1 2'4" X 6-8" 2468 6 PANEL INTERIOR POCKET G 3 2'-61/8"X3'-8%" TW2436DOUBLEHUNG 3X5.73=17.19 SF H 1 4' -OV' x3'-5 3/8" C235 DOUBLE CASEMENT 8.0 SF J - 2 2'-O" X 64' 2068 6 PANEL. INTERIOR * WINDOW C: QTY 3 = Garage TOTAL 290.9 S.F. * DOOR 6 Qty=1 GARAGE TOTAL ---1 30.9 SY FIRST FLOOR LIVING AREA = 2048 SF DOOR SCHEDULE # QTY. DOOR SIZE REMARKS GLAZING 1 1 3'-0"X6'-8" 3068 ENTRYw/SIDELIGHTS R-5 MIN. 12.3 SF 2 11 2'-6" X 6'-8" 2668 6 PANEL INTERIOR 2P 1 2'-6" X 64" 2668 6PANEL INTERIOR POCKET 3 2' -8"X6' -F' 2868 STL.FIREDOOR R-5 MIN. q 7 2'4" X 6-8" 2468 6 PANEL INTERIOR 4P 1 2'4" X 6-8" 2468 6 PANEL INTERIOR POCKET 6 2(3)* 1 2'-8" X 6'-8" 2868 NINE LIGHT STL FIREDOOR 2 x 8.3 = 16.6 SF 7 1 6'-0"x6'-8" 6068 SLIDING DOOR 30 SF $ 2 2'-O" X 64' 2068 6 PANEL. INTERIOR 9 2 9'-0" X T-0" 9 FT OVERHEAD GARAGE DOOR 10 1 12'-0" x 6'-8" FWG12068 4 SLIDING GLASS 72 SF 11 - 12 1 5'-0" x 6'-8" 2668 INTERIOR BIFOLD PAIR 13 1 l'-2" x 6'-8" 1268 3 PANEL INTERIOR * DOOR 6 Qty=1 GARAGE TOTAL ---1 30.9 SY FIRST FLOOR LIVING AREA = 2048 SF * DOOR 6 Qty --1 GARAGE TOTAL 130.9 S.F SECOND FLOOR LIVING AREA = 1546 SF WINDOW SCHEDULE DOOR SCHEDULE LTR. # QTY. DOOR SIZE REMARKS GLAZING 1 1 T-0" X 6'-8" 3068 ENTRY W/SIDELIGHTS R-5 MIN, 12.3 SF 2 1 2'-6" X 6'-8" 2668 6 PANEL INTERIOR C 2P 1 2'-6" X 6'-8" 2668 6 PANEL INTERIOR POCKET D 3 2'-8" X 6'4" 2868 STL. FIREDOOR R-5 MIN. E 4 7 2'4" X 6'-B" 2468 6 PANEL INTERIOR F 4P 1 2'4" X 6'-8" 2468 6 PANEL INTERIOR POCKET G 6 2(3)` 2'-8" X 6-B". 2868 NINE LIGHT STL FIREDOOR 2 x 8.3 =16.6 SP 7 1 6'-o"X6'-8" 6068 SLIDING DOOR 30 SF 8 2'-0" X 6'-B" 2068 6 PANEL INTERIOR 9 2 9'-0" X T-0" 9 FT OVERHEAD GARAGE DOOR 10 1 12'-0"x 6'-8" FWG120684 SLIDING GLASS 72 SF 11 - 12 1 6-0" x 6'-8" 2668 INTERIOR BIFOLD PAIR 13 1 1'-2" x 6'-6" 1268 3 PANEL INTERIOR * DOOR 6 Qty --1 GARAGE TOTAL 130.9 S.F SECOND FLOOR LIVING AREA = 1546 SF ". WINDOW C: QTY 3 = Garage TOTAL 290.9 S.F. WINDOW SCHEDULE LTR. QTY. ROUGH OPENING REMARKS GLAZING A 2 2'-61/8"X5'-07/8" TW24410 DOUBLEHUNG 2x8.28=.16.56SF B 7 2'-47N'x2'-4 %" AW251 AWNING 7x3.9=27.3 SF C 3(16)" 2'-61/8" x 4'-8 7/8 TW2446 DOUBLEHUNG 13 x 7.65 = 99.45 SF D E 12 2-6 1/8" x 5'-6 7/8" TW2452 DOUBLEHUNG 12 x 10.2 = 122.4 SF F G 3 2'-6 v8" X V -8/B" TW2436 DOUBLEHUNG 3 X 5.73 =17.19 SF H 1 4'-072" x 3'-5 3/8" C235 DOUBLE CASEMENT 8.0 SF. J - ". WINDOW C: QTY 3 = Garage TOTAL 290.9 S.F. WHITE CEDAR SHINGLES @ 51/4" T.W (TYPICAL ALL SIDES) POOLHOUSE REAR ELEVATION MAIN HOUSE POOLHOUSE FRONT ELEVATION e STORAGE P N i I TW2436� 2x6 WAILS BATH SURROUND N BATHROOM FOR INSULATION 2468 F 2" I IP 11"+ v TW3846 I 2-TW3846 F.� 8 HANG VT. 8 FT HANG HT. 'oOST 5 3/8" FWG10080-4 SJ 6-10 5/8" 25'-0" a P.T. 6x6 POST w/2x z FINISH (TYPICAL -4) Q U W N POOLHOUSE FLOOR PLAN 6'-10518" 25.-6,. 2'-10,. T-0" 9,4::9'-10" ------- --------------- I f — -DROP TOFFOR 2--8"DOOR -- ---52"- —_31 L----- -----� r STONE VENEERASPHALT ROOF SHINGLES I P.C. SLAB I I # CRAWLSPACE CHIMNEY FINISH TO MATCH MAIN HOUSE I I 1zo I / FIREPLACE T-11 13/16" I FOOTING \ \ I \ \\ I I _- -.?-_Ir r�-'T P.C. SLAB T rT i L LL L I firIM Tf I I ` POST 6 c? � r r i.�. I irL + I I P.T. 6X6 I -v4i 7 Trt _ J J r ,T STHD 4 I I ) h STHD \ \ 8" P.C. FOUNDATION \ I FROST WALL ON 20" / \\ \ 19P.C. FOOTING POOLHOUSE LEFT ELEVATION POOLHOUSE RIGHT ELEVATION °p 46 BW \ P.T. 6X6 DROPTOF POST UP FOR SLAB / / 90 w / \ I / 6'-9" 11 5 6'-9" 25}0" P.T. 6x6 w/SIMPSON STHD14 POOLHOUSE FOUNDATION PLAN POOLHOUSE WINDOW SCHEDULE QTY. ROUGHOPENING1 REMARKS 4 3'-101/8"X4'-87/8" TW3846DOUBLE HUNG 1 2'-6 1/8" x T-8'/" TW2436 DOUBLEHUNG POOLHOUSE DOOR Irg'-1 ® r 1 1 QTy-1 DOOR SIZE ISI 10'-0"x8'-0" FWG10080-4 SLIDINGGLASS .-1� -r L7 -11 LrT� 2868 6 -PANEL F.G. ENTRY L4 �'�t11 • _ , ..—.. WHITE CEDAR SHINGLES @ 51/4" T.W (TYPICAL ALL SIDES) POOLHOUSE REAR ELEVATION MAIN HOUSE POOLHOUSE FRONT ELEVATION e STORAGE P N i I TW2436� 2x6 WAILS BATH SURROUND N BATHROOM FOR INSULATION 2468 F 2" I IP 11"+ v TW3846 I 2-TW3846 F.� 8 HANG VT. 8 FT HANG HT. 'oOST 5 3/8" FWG10080-4 SJ 6-10 5/8" 25'-0" a P.T. 6x6 POST w/2x z FINISH (TYPICAL -4) Q U W N POOLHOUSE FLOOR PLAN 6'-10518" 25.-6,. 2'-10,. T-0" 9,4::9'-10" ------- --------------- I f — -DROP TOFFOR 2--8"DOOR -- ---52"- —_31 L----- -----� r STONE VENEERASPHALT ROOF SHINGLES I P.C. SLAB I I # CRAWLSPACE CHIMNEY FINISH TO MATCH MAIN HOUSE I I 1zo I / FIREPLACE T-11 13/16" I FOOTING \ \ I \ \\ I I _- -.?-_Ir r�-'T P.C. SLAB T rT i L LL L I firIM Tf I I ` POST 6 c? � r r i.�. I irL + I I P.T. 6X6 I -v4i 7 Trt _ J J r ,T STHD 4 I I ) h STHD \ \ 8" P.C. FOUNDATION \ I FROST WALL ON 20" / \\ \ 19P.C. FOOTING POOLHOUSE LEFT ELEVATION POOLHOUSE RIGHT ELEVATION °p 46 BW \ P.T. 6X6 DROPTOF POST UP FOR SLAB / / 90 w / \ I / 6'-9" 11 5 6'-9" 25}0" P.T. 6x6 w/SIMPSON STHD14 POOLHOUSE FOUNDATION PLAN POOLHOUSE WINDOW SCHEDULE QTY. ROUGHOPENING1 REMARKS 4 3'-101/8"X4'-87/8" TW3846DOUBLE HUNG 1 2'-6 1/8" x T-8'/" TW2436 DOUBLEHUNG POOLHOUSE DOOR SCHEDULE QTy-1 DOOR SIZE REMARKS 10'-0"x8'-0" FWG10080-4 SLIDINGGLASS T-8" X 6'-8" 2868 6 -PANEL F.G. ENTRY MICHELE CUDILO N0.34774 STRUCTUI !- & ROOF TYPICAL ROOF CONSTRUCTION No. box SHINGLES ASPHALT ROOF SHINGLES OVER nails nails APPROVED SHINGLE BACKING (15# FELT) ROOF FRAME OVER 1/2" EXTERIOR PLYWOOD (FIR) RAFTERS OVER ROOF RAFTERS RAFTERS each end TYPICAL EXTERIOR WALL CONSTRUCTION NOTE: 3-16d e WHITE CEDAR SHINGLES @ 5;' T.W. OVER ALL WOOD BEAMS, JOISTS AND STUDS PROVIDE CHIMNEY TIES. i TYVEW OVER'" EXT. PLYWOOD OVER 2x SHALL BE TRIMMED AWAY FROM CHIMNEY MASONRY CHIMNEYS SHALL BE STUDS @ 16" O.C. w/2 TOP & 1 BOTTOM PLATE • BALLOON FRAME GABLE WALLS A MIN. OF 2 INCHES LINED WITH FIRE -CLAY FLUE • FIREBLOCK STUDS >8'-O". CONTINUOUS RIDGE DENT _CHIMNEY STACK BEYOND LINING OR EQUIV. NOT LESS / 2x10 RIDGE PLATE 1 HEADER TO HEADER (FACE -NAILED) THAN 5/8" THICK 2x6 C04LAR TIES @; 16" o.c. along edges SITTING ROOM STORAGE ROOM RAFTERS @ 16" O.C. 12 DAMPER 4-1 Od 4 SMOKE SHELF STL. LINTEL 2-1 Od each end 3-2x10a HEADER 3-16d 4-16d �- ASH CHUTE ASH PIT CONC. SLAB CLEANOUT 4N— CHIMNEY CHIMNEY SECTION NOT TO SCALE ROOF FRAME TYPICAL HEADERS r 3-2x6 (1 KING/1JACK) " D OFF STACK OPENING 2-2x10s AROUND (ADJUST FOR CHIMNEY CK SIZE LEAVING 2" MIN FROM CK) I♦IIII■III. U i 2-2X8 TYP. 3-2x10s. WOOD DROP x BEAM POST -TO -POST O N N N 2JACK POCKETS 'ro (TYPICAL) 3-2x10s. WOOD DROP BEAM POST -TO -POST SIMPSON ECC UR SIMPSON ECC UR CUSTOM CAPS CUSTOM CAPS 3-2xl0s. WOOD DROP BEAM POST -TO -POST CEILING FRAME 12 4 ro @ 16" O.C. 2x6 STUD WALLS SURROUND 00 BATHROOM K 'TING ROOM F m T" PLYWOOD GLUED AND NAILED SIMPSON ABOVE 2x6 JOISTS @ 16" O.C. LSCZ @ CRAWLSPACE SECTION AT POOLHOUSE BATHROOM MICHELE CUDIL.O No. 3h774 STRUGTl4t: +pd'' 2/16/'21 STRUCT. NAILING SCHEDULE TYPICAL ROOF CONSTRUCTION No. box Nail spacing ASPHALT ROOF SHINGLES OVER nails nails APPROVED SHINGLE BACKING (15# FELT) ROOF FRAME OVER 1/2" EXTERIOR PLYWOOD (FIR) BLOCKING TO RAFTER (TOE -NAILED) - OVER ROOF RAFTERS 2-10d each end TYPICAL EXTERIOR WALL CONSTRUCTION 2-16d 3-16d e WHITE CEDAR SHINGLES @ 5;' T.W. OVER WALL FRAME. TYVEW OVER'" EXT. PLYWOOD OVER 2x TOP PLATES AT INTERSECTIONS (FACE -NAILED) STUDS @ 16" O.C. w/2 TOP & 1 BOTTOM PLATE • BALLOON FRAME GABLE WALLS 5-164 atjoints • FIREBLOCK STUDS >8'-O". CONTINUOUS RIDGE DENT _CHIMNEY STACK BEYOND 2-t6d / 2x10 RIDGE PLATE 1 HEADER TO HEADER (FACE -NAILED) 16d 2x6 C04LAR TIES @; 16" o.c. along edges 16" O:C.1 2x8 RAFTERS @ 16" O.C. 12 4-8d 4-1 Od 4 BLOCKING TO JOIST (TOE -NAILED) xs 2-1 Od each end 3-2x10a HEADER 3-16d 4-16d _ POST TO POST LEDGER TO BEAM OR GIRDER (FACE -NAILED) 3-16d BEADBOARD FINISH each joist JOIST ON LEDGER TO BEAM (TOE -NAILED) (FIELDSTONE VENEER 3-10d perjoist ON CHIMNEY BREAST) 3-16d 2x4 WALL CENTERED perjoist RIM JOIST TO SILL OR TOP PLATE (TOE -NAILED) ON FOUNDATION AND 0 per foot BELOW POST -TO -POST un s STORAGE HEADER O ROOM z RAFTERS @ 16" O.C. OR LESS 8d = SITTING ROOM 6" edge 6" field GABLE ENDWALL RAKE (NO OVERHANG or w/ STRUCT.OUTLOOKERS) 0 10d 6" edge 6" field CEILING SHEATHING: METAL FLASHING TO METAL FLASHING TO 1" MIN BELOW TOF 4" P.C. SLAB 1" MIN BELOW TOF TOF DROPPED AT DOORS PLYWOOD OR OSB w/ STUDS @ 24" O.C. OR LESS 8d 10d I-- ----------------- % 8" FOUNDATION 5d coolers - WALL ON FLOOR SHEATHING: 20"x10" 5/8" ANCHOR BOLTS WITH 3 X 3" CONTINUOUS 10d x 1/4" PLATE WASHER @ 38" FOOTING MIN. 4' 10d • O.C. EMBED IN CONC. 7" MIN. BELOW GRADE 21' POOL HOUSE SECTION P TYPICAL HEADERS r 3-2x6 (1 KING/1JACK) " D OFF STACK OPENING 2-2x10s AROUND (ADJUST FOR CHIMNEY CK SIZE LEAVING 2" MIN FROM CK) I♦IIII■III. U i 2-2X8 TYP. 3-2x10s. WOOD DROP x BEAM POST -TO -POST O N N N 2JACK POCKETS 'ro (TYPICAL) 3-2x10s. WOOD DROP BEAM POST -TO -POST SIMPSON ECC UR SIMPSON ECC UR CUSTOM CAPS CUSTOM CAPS 3-2xl0s. WOOD DROP BEAM POST -TO -POST CEILING FRAME 12 4 ro @ 16" O.C. 2x6 STUD WALLS SURROUND 00 BATHROOM K 'TING ROOM F m T" PLYWOOD GLUED AND NAILED SIMPSON ABOVE 2x6 JOISTS @ 16" O.C. LSCZ @ CRAWLSPACE SECTION AT POOLHOUSE BATHROOM MICHELE CUDIL.O No. 3h774 STRUGTl4t: +pd'' 2/16/'21 STRUCT. NAILING SCHEDULE No. common No. box Nail spacing nails nails ROOF FRAME BLOCKING TO RAFTER (TOE -NAILED) - 2-8d 2-10d each end RIM BOARD TO RAFTER (END -NAILED) 2-16d 3-16d each end WALL FRAME. TOP PLATES AT INTERSECTIONS (FACE -NAILED) 4-16d 5-164 atjoints STUD TO STUD (FACE -NAILED) 2-tfid 2-t6d 24" o.c. HEADER TO HEADER (FACE -NAILED) 16d 16d 16" o.c. along edges FLOOR FRAME: JOIST TO SILL, TOP PLATE OR GIRDER (TOE -NAILED) 4-8d 4-1 Od perjoist BLOCKING TO JOIST (TOE -NAILED) 2-8d 2-1 Od each end BLOCKING TO SILL OR TOP PLATE (TOE -NAILED) 3-16d 4-16d each block LEDGER TO BEAM OR GIRDER (FACE -NAILED) 3-16d 4-16d each joist JOIST ON LEDGER TO BEAM (TOE -NAILED) 3-8d 3-10d perjoist RIM JOIST TO JOIST (END -NAILED) 3-16d 4-16d perjoist RIM JOIST TO SILL OR TOP PLATE (TOE -NAILED) 2-16d 3-16d per foot ROOF SHEATHING 112"PLYWOOD OR 7116"OSB RAFTERS @ 16" O.C. OR LESS 8d 10d 6" edge 6" field GABLE ENDWALL RAKE (NO OVERHANG or w/ STRUCT.OUTLOOKERS) 8d 10d 6" edge 6" field CEILING SHEATHING: GYPSUM WALLBOARD 5d coolers - 7" edge 10" field WALL SHEATHING: PLYWOOD OR OSB w/ STUDS @ 24" O.C. OR LESS 8d 10d 6" edge 12" field 112" GYPSUM WALLBOARD 5d coolers - 7" edge 10" field FLOOR SHEATHING: PLYWOOD OR OSB 1" OR LESS 8d 10d Wedge 12" field GREATER THAN 1" 10d 16d 6" edge 6" field