Loading...
HomeMy WebLinkAboutEngineer Plans - 2010N ACCESS COVERS MUST BE WITHIN 6' OF F' I N I SH GRAD 102.81 FIRST 2" TO -_ BE LEVEL INSPECTION PORT / U T �1.1 99.75 LJ 98. 3 10.--�`� i . GAS �BAFFLE 98.47 � 98.23 - --`- 3 OUTLET 5 HIGH CAPACITY INFILTRATOR D -BOX CHAMBERS W/3.5'= STONE AROUND 1500 .GAL H-20 l0'F x 38`1 x /0-d SEPTIC 1"ANK H-20 6- CRUSHED STONE OR COMPACTED BASE PROF I LE NUT TO SCALE 9- MINIMUM. 3' MAXIMUM COVER MIN 2' OF PEASTONE- OR FILTER FABRIC 374- - 1 1/2- DIA. DOUBLE WASHED STONE LOT L l 9.752+ S.F. BEAR ! �foq I - SEPTIC TANK// 5 HIGH CAPACITY,/ INFILTRATOR .CHAMBERS W13.5" STONF�AROUND LEACH PIT / / / y {so Yy .� Z, H 04'P4 ,INVERT ELE.VATIONS. INVERT AT BUILDING; 100.5 INVERT IN SEPTIC TANK: 100.0 INVERT OUT SEPTIC TANK: 99.75 INVERT IN DIST, BOX: 96.47 INVERT OUT DIST. BOX: 98.3 INVERT IN LEACH CHAMBER: 98.23 BOTTOM OF LEACH CHAMBER: 97.4 ADJUSTED GROUND WATER: NIA OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE •!: 9i.8 I / �4 I \ 1 Spy/\ D -BOX F \ DESIGN CRI TER IA: DESIGN FLOW: 3 BEDROOMS AT 110 G.P.D. PER BEDROOM EQUALS 33O G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 330 G.P.D. X 2002 - 660 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE ( 5 MIN/INCH SOIL i'EXTURAL CLASS - I EFFLUENT LOADING RATE' - 0.74 GPD/SF 330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED PROVIDED: 5 HIGH CAPACITY INFILTRATOR CHAMBERS W/3.5'=STONE AROUND. A-460 S.F. 460 S.F. x 0.74 - 340 GPD SOIL TEST PIT DA TA IND/CA TES 7_ INDICATES PERCOLATION OBSERVED TEST GROUNDWATER TP +! 0' HORIZON TEXTURE COLOR 102.3 FILL I� LOAMY IOYR O SAND 5/6 48 • _........ .. 98.3 C / MEDIUM IOYR SAND 6/6 M 126-�-L- " nn e e n __ 1 91.8 DATE: SEPTEMBER 9. 2010 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PF -RC RATE: ( 2 MIN/INCH 1aiouth Health Department ,APPROVED 4�2 UAW ■ ■ GENERAL NOTES: I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM !S ASSUMED, FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER; TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE". 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. 8. EXISTING LEACH PIT TO BE PUMPED DRY AND BACKFILLED. EXISTING SEPTIC TANK TO BE PUMPED DRY AND REMOVED. r 9G , 'S { �; FRAU♦ `�` S No, zg- 07"T`P_ A. MGwiis. SPP 2 9 2010 HEALTH DEPT_ SEF'T!C SYSTEM D Si`G/V 5B SAL T BOX 80.40 , MAP 8 / PARCEL .54 S®VTH YARMOUTH MA , PREPAREO FOR : SCALL E : ! " - 20 SEP TE_IVBER 27. 200_P EAGL__E SLJFRVEY I NG I NC 923 Route 6A -�' Yarmouthport, MA. 02675 ( 508 ) 362-8132 508 432-5333 DOLS NO: 10-U90 I F1ELI:CFW/EEK I CAL C: SAH/CFW CHECK: CFW I ORN: SAH SM. CBJDH FND \ £L-100.40 L EGEND ■ CB CONCRETE BOUND --W- WATER LINE O HYDRANT --G--- GAS LINE - OHW- OVER HEAD WIRES .# LIGHT POST E---- UNDERGROUND ELECTRIC LINE T- UNDERGROUND TELEPHONE LINE --CTV-- ;UNDERGROUND CABLEVISION LINE +40.4 SPOT ELEVATION __-40--._ I EXISTING CONTOUR I40I (PROPOSED CONTOUR " j DESIGN CRI TER IA: DESIGN FLOW: 3 BEDROOMS AT 110 G.P.D. PER BEDROOM EQUALS 33O G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 330 G.P.D. X 2002 - 660 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE ( 5 MIN/INCH SOIL i'EXTURAL CLASS - I EFFLUENT LOADING RATE' - 0.74 GPD/SF 330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED PROVIDED: 5 HIGH CAPACITY INFILTRATOR CHAMBERS W/3.5'=STONE AROUND. A-460 S.F. 460 S.F. x 0.74 - 340 GPD SOIL TEST PIT DA TA IND/CA TES 7_ INDICATES PERCOLATION OBSERVED TEST GROUNDWATER TP +! 0' HORIZON TEXTURE COLOR 102.3 FILL I� LOAMY IOYR O SAND 5/6 48 • _........ .. 98.3 C / MEDIUM IOYR SAND 6/6 M 126-�-L- " nn e e n __ 1 91.8 DATE: SEPTEMBER 9. 2010 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PF -RC RATE: ( 2 MIN/INCH 1aiouth Health Department ,APPROVED 4�2 UAW ■ ■ GENERAL NOTES: I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM !S ASSUMED, FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER; TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE". 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. 8. EXISTING LEACH PIT TO BE PUMPED DRY AND BACKFILLED. EXISTING SEPTIC TANK TO BE PUMPED DRY AND REMOVED. r 9G , 'S { �; FRAU♦ `�` S No, zg- 07"T`P_ A. MGwiis. SPP 2 9 2010 HEALTH DEPT_ SEF'T!C SYSTEM D Si`G/V 5B SAL T BOX 80.40 , MAP 8 / PARCEL .54 S®VTH YARMOUTH MA , PREPAREO FOR : SCALL E : ! " - 20 SEP TE_IVBER 27. 200_P EAGL__E SLJFRVEY I NG I NC 923 Route 6A -�' Yarmouthport, MA. 02675 ( 508 ) 362-8132 508 432-5333 DOLS NO: 10-U90 I F1ELI:CFW/EEK I CAL C: SAH/CFW CHECK: CFW I ORN: SAH