HomeMy WebLinkAboutEngineer Plan - 2021c
cc
N 42D 44' 40" E \
124 TEST HOLE #1
r ` ( ELEV.= 99.00
NEW
1500 GALLON 2 99200
bSEPTIC TANK D—B 5
0 EXISTING B' O
"'YYY V V
W I o C 2 DEDROOM 99x25 O
3
O00
W C HOUSE O
O e full foundation DECK FAILED' o
r— #48 CESSPOOL
P9.5=
99x00 s
Fr... _.....,1 t>>
00 v�
— .. u"auw,errun99x25
ti
¢ ` CESSPOOL
" `------------------,
GRAVEL I \ 99x00
DRIVEWAY PROJECT BENCH MARK
—----------------�
TOP OF FOUNDATION \A11
O / ELEV. = 100.00 (ASSU ltd)
LOT 15
18,350 Square Feet +/—
M 143 +/—
lyl aPh
I S 42D 44' 40" W
i
Permit valid for REPAIR OIF� SEPTIC SYSTEM
c QNLY, due to State and Loral septic variances.
m o' Board of Health review and approval is required for.
Bedroom m v ,,,y future additions/renovations/alterations to.
x S sewage facilities and/or structuresidwelling.
Yarmouth Health Department
Bedroom Living Room APPROVED
2 RR HOUSE FLOOR SCHEMATIC
(Description Provided By Owner)
c� li wxsi I4 Zv'z
Nance Date
0 20 40 50
SCALE: 1"=20'
1. Contractor is responsible for Digsafe notification, Verification of Utilities
and protection of all underground utilities and pipes.
2. The septic"tank amyl distri ution box shall be set
level on 61%2" stone.
3. Backfill should be clean sand or gravel with no
stones over 3" in size.
4. This system Is subject to inspection during installation
by Carmen E. Shay — Environmental Services, Inc.
5. The contractor shall install this system in accordance
with Title V of the Massachusetts state code, the approved pion
and Local Regulations.
6. If, during installation the contractor encounters any
soil conditions or site conditions that are different
from those shown on the soil log or in our design
installation must halt & immediate notification be
made to Carmen E. Shay — Environmental Services, Inc.
7. No vehicle or heavy machinery shall drive over the
septic system unless noted as H-20 septic components.
8. Install Tuf—Tite gas baffles or equals on all outlet tee ends.
9. All Distribution Lines shall be 4" diameter Schedule 40 NSF PVC pipes.
10. All solid piping, tees & fittings shall be 4" diameter
Schedule 40 NSF PVC pipes with water tight joints.
11. Municipal Water is Connected to ALL OF The Residence and Abutting
Properties Within 150 Feet.
THE PROPERTY LINES ARE APPROXIMATE AND
COMPILED FROM THE PLAN BY JOHN P DOYLE, RLS
ENTITLE "SITE PLAN OF LAND -48 BROWNING AVE., YARMOUTH, MA"
DATED JULY 24, 2021
AND IS NOT INTENDED TO BE A SURVEY PLOT PLAN
IT SHOULD BE USED FOR NO PURPOSE OTHER THAN
THE SEPTIC SYSTEM INSTALLATION.
EXISTING CESSPOOLS TO BE PUMPED OUT AND FILLED IN PLACE
NOTE: ANY STRIPPED OUT SOIL CONTAINING LEACHATE
FROM THE EXISTING CESSPOOLS TO BE DISPOSED
OF AS PER BOARD OF HEALTH SPECIFICATIONS.
REV: 8/24/21—Per BOH Email I
PLOT PLAN
OF PROPOSED SEPTIC SYSTEM UPGRADE
PREPARED FOR
EM JAY GEE TRUST
AT
48 BROWNING AVENUE
ASSESSORS MAP 88 PARCEL 133
YARMOUTH,..MA
PREPARED BY:
CARMEN E. SHAY
ENVIRONMENTAL SERVICES
P.O. Box 1576
MASHPEE, MA 02649
TEL/FAX : 508-294-7498
SCALE: 1 "=20' DRAWN BY: CES DATE: AUGUST 3, 2021
PROJECT#48 BROWNING
BROWNING.DJNG SHEET 1 OF 2
10' min. from *NOTE: ALL PIPES ARE TO BE 4' SCHEDULE 40 P.V.C.
EXISTING Foundation house to septic tank D -BOX rover must be
Septic tank covers must be within r of GRACE
within a In. of finished grads
FULL
S - 0.02
le'
SYSTEM PROFILE
Not to Scale
3-24' DIAM.
EW 1.500 GA
SEPTIC TANK
H-10
Bwi
over Septia Tank - 99.00
I NOTE: ALL COMPONENTSIMUST HAVE RISERS TO WITHIN 6' BELOW GRADE I
MANHOLES
6 in.0f'3/4'-1 1/2'
Compacted stone
�
(H9 p) DIST. BOX
8 in.of 3/4'-1 1/r
compacted stone
TYPICAL 1500 GALLON SEPTIC TANK
INLET
INIE
5'
STEEL REINFORCED PRECAST CONCRETE
PLAN VIEW
3-24• REMOVABLE COVERS
CROSS SECTION
V
EB-- OuW
ave D -Box - 99.00
Test HOI;e7
SECTION A -A
3 rain. tlnmonee
cover must be
1 6' of GRADE S aver SAS - 99.00
PROFILE VIEW OF LEACHING
-rT1?,Gr 12* min. Inlet to Wild r rah
I* ' ►aWd 4Yudud,--a'
ndn. T� uwi 'TewA Ca'
-r
w
INSPECTION o0vm leha g
within s in. of fli Iiehed grade
\
�'S
Y
Qe BONG
0 0
10 YR 5/e
0= oq 0 0
Be
"Ka
Med.
a 0 00 0 0 0
CROSS SECTION
V
EB-- OuW
ave D -Box - 99.00
PERCOLATION TEST
Date of Percolation Test: JULY 7. 2021
NOT TO SCALE Test Performed By. CARMEN E. SHAY, R.S., C.S.E.
Results Witnessed By. PHIL RENAUD - YARMOUTH BOH
(H-10 LOADING) EXCAVATOR: SHAY ENVIRONMENTAL SERVICES
Percolation Rate: Less Than 2 MPI 0 30"
THE ACCESS COVERS FOR THE SEPTIC TANK,
DISTRIBUTION BOX AND LEACHING COMPONENT
SHALL BE RAISED TO WITHIN S' OF
FINISHED GRADE.
INSTALL TUF-nTE GAS BAFFLES OR EQUALS
ON ALL OUTLET TEE ENDS
•:
s -r
mTn.
depth
END—SECTION
Design Calculations Number of Bedrooms: 2 Equivalent to 220 Gal./Day
Garbage Grinder: No
Leaching Capacity Proposed: 220 Gol./Doy Minimum (Min. Per Title V)
Septic Tank : - 2 x220 Gal./Doy = 440 USE EXIST. 1000 GAL. Septic Tank.
SOIL ABSORPTION AREA: Using percolation rate of Q min./inch
Bottom Area: 0.74 gal/day/sq. ft. x 250 sq. ft. 185 gallons/day
Sidewall Area: 0.74 gal./day/sq. ft. x 140 sq. ft. 103.6 gallon/day
Providing: = 288.60 gallons/day
Use: (2) 500 H-10 CONCRETE CHAMBERS, HAVING A 2' EFFECTIVE DEPTH,
(5' W x 8.5' L) TO BE USED WITH 2.5' OF WASHED STONE ON THE SIDES AND
4' OF WASHED STONE ON THE ENDS.
Test HOI;e7
SECTION A -A
DEPTH SOILS ELEV.!
cover must be
1 6' of GRADE S aver SAS - 99.00
PROFILE VIEW OF LEACHING
SYSTEM
I* ' ►aWd 4Yudud,--a'
N f/!• - 1/l' V eIwd P�mfalr
TOP OF SAS -
98.50
INSPECTION o0vm leha g
within s in. of fli Iiehed grade
\
o
/
Sandy Loom
0 0
10 YR 5/e
0= oq 0 0
Be
96.50
Med.
a 0 00 0 0 0
A
o0 0 0
30•_132,
57. Grave
C,
88.00
2 UMts B 8.5' = 29.5'
I
4'
_f0•
�
S' F4
OVIDED
Effective Width
PERCOLATION TEST
Date of Percolation Test: JULY 7. 2021
NOT TO SCALE Test Performed By. CARMEN E. SHAY, R.S., C.S.E.
Results Witnessed By. PHIL RENAUD - YARMOUTH BOH
(H-10 LOADING) EXCAVATOR: SHAY ENVIRONMENTAL SERVICES
Percolation Rate: Less Than 2 MPI 0 30"
THE ACCESS COVERS FOR THE SEPTIC TANK,
DISTRIBUTION BOX AND LEACHING COMPONENT
SHALL BE RAISED TO WITHIN S' OF
FINISHED GRADE.
INSTALL TUF-nTE GAS BAFFLES OR EQUALS
ON ALL OUTLET TEE ENDS
•:
s -r
mTn.
depth
END—SECTION
Design Calculations Number of Bedrooms: 2 Equivalent to 220 Gal./Day
Garbage Grinder: No
Leaching Capacity Proposed: 220 Gol./Doy Minimum (Min. Per Title V)
Septic Tank : - 2 x220 Gal./Doy = 440 USE EXIST. 1000 GAL. Septic Tank.
SOIL ABSORPTION AREA: Using percolation rate of Q min./inch
Bottom Area: 0.74 gal/day/sq. ft. x 250 sq. ft. 185 gallons/day
Sidewall Area: 0.74 gal./day/sq. ft. x 140 sq. ft. 103.6 gallon/day
Providing: = 288.60 gallons/day
Use: (2) 500 H-10 CONCRETE CHAMBERS, HAVING A 2' EFFECTIVE DEPTH,
(5' W x 8.5' L) TO BE USED WITH 2.5' OF WASHED STONE ON THE SIDES AND
4' OF WASHED STONE ON THE ENDS.
Perc #1
Depth to Pere: 30" to 48"
Perc Rate= c2 MPI
Groundwater Not Observed
No Observed ESHWf
ADJUSTED H2O Elev. = None
Effectfve Length
SOIL ABSORPTION SYSTEM (SAS)
500 - C H-10 LEACHING UNITS / WIGGINS PRECAST
Not to Scale
DISiBM INUn WA anxu os 12" CONCRETE COYER
SET LM FOR AT LEAST 2 FT.
a&5'
3 - 6' 011WuY..w:S...e:+.2
INOa(WTS
OUTLET tY INLET
. 4' - SCH. 40 Te t75'
PLAN SECTION CROSS—SECTION
3 HOLE H-10 DISTRIBUTION BOX
NOT TO SCALE
REE: 8/24/21 -Per BOH Email I
PLOT OMAN
OF PROPOSED SEPTIC SYSTEM UPGRADE
PREPARED FOR
EM JAY GEE TRUST
AT
48 BROWNING AVENUE
ASSESSORS MAP 88 PARCEL 133
YARMOUTH, MA
PREPARED BY:
CARNEW E. ,SAA Y
ENVIRONMENTAL SERVICES
P.O. BOX 1576
MASHPEE, MA 02649
TEL/FAX : 508-294-7498
SCALE: N/A SHEET 2 1 DRAWN BY: CES I DATE: AUGUST 3, 2021
PROJECT#48 BROWNING FILENAME:48 BROWNING.D G SHEET 2 OF 2
Test HOI;e7
No. 1
DEPTH SOILS ELEV.!
0 99.00
Sandy
Lown
10 TR 3/2
A.
98.50
Sandy Loom
10 YR 5/e
Be
96.50
Med.
Sand
25 Y 7/4
30•_132,
57. Grave
C,
88.00
I
Perc #1
Depth to Pere: 30" to 48"
Perc Rate= c2 MPI
Groundwater Not Observed
No Observed ESHWf
ADJUSTED H2O Elev. = None
Effectfve Length
SOIL ABSORPTION SYSTEM (SAS)
500 - C H-10 LEACHING UNITS / WIGGINS PRECAST
Not to Scale
DISiBM INUn WA anxu os 12" CONCRETE COYER
SET LM FOR AT LEAST 2 FT.
a&5'
3 - 6' 011WuY..w:S...e:+.2
INOa(WTS
OUTLET tY INLET
. 4' - SCH. 40 Te t75'
PLAN SECTION CROSS—SECTION
3 HOLE H-10 DISTRIBUTION BOX
NOT TO SCALE
REE: 8/24/21 -Per BOH Email I
PLOT OMAN
OF PROPOSED SEPTIC SYSTEM UPGRADE
PREPARED FOR
EM JAY GEE TRUST
AT
48 BROWNING AVENUE
ASSESSORS MAP 88 PARCEL 133
YARMOUTH, MA
PREPARED BY:
CARNEW E. ,SAA Y
ENVIRONMENTAL SERVICES
P.O. BOX 1576
MASHPEE, MA 02649
TEL/FAX : 508-294-7498
SCALE: N/A SHEET 2 1 DRAWN BY: CES I DATE: AUGUST 3, 2021