HomeMy WebLinkAboutTransmittal_RFI - RFI-165 (Sent and Closed)RFI Transmittal
Perkins Eastman | 20 Ashburton Place, Floor 8 Boston MASSACHUSETTS 02108 United States
Page 1 of 2
PROJECT:Mattacheese Middle School: FS-CA
71010.00.0
DATE SENT:8/31/2021
SUBJECT:Corrective Action for Missing Pier
at K-B25
RFI ID:RFI-165
TYPE:RFI TRANSMITTAL ID:01394
PURPOSE:For Construction VIA:Info Exchange
QUESTION:SUGGESTION:
ANSWER:
FROM
NAME COMPANY EMAIL PHONE
Leah Schroeder Perkins Eastman l.schroeder@perkinseast
man.com
+1 617 449
4009
TO
NAME COMPANY EMAIL PHONE
Timeo Sequeira Commodore
Builders
tsequeira@commodoreb
uilders.com 617.614.3500
Jeff Martin Commodore
Builders
jmartin@commodorebui
lders.com (617) 614-3500
Mike Dupuis Commodore
Builders
mdupuis@commodoreb
uilders.com (617) 614-3500
Ricky Sughrue Commodore
Builders
rsughrue@commodoreb
uilders.com 617.614.3500
Ryan DiRico Commodore
Builders
rdirico@commodorebuil
ders.com (617) 614-3500
REMARKS:
DESCRIPTION OF CONTENTS
QTY DATED TITLE NUMBER SCALE SIZE
1 8/23/2021
RFI-165 - Corrective
Action for Missing Pier at
K-B25.pdf
RFI Transmittal
DATE:8/31/2021
ID:01394
Page 2 of 2
COPIES:
Andrew Hazelton (Perkins Eastman)
Leah Schroeder (Perkins Eastman)
Russell Higgins (Perkins Eastman)
Chad Crittendon (PMA Consultants)
Jon Pope (PMA Consultants)
Mark Adrean (PMA Consultants)
Mitch Miller (PMA Consultants)
PMA DY Project Email (PMA Consultants)
Walter Hartley (PMA Consultants)
Sandra Cashen
Ken Anderson (Girard and Company, LLP)
Commodore Builders
404 Wyman St., Suite 400
Waltham, Massachusetts 02451
P: (617) 614-3500
Project: 21-0060 Dennis Yarmouth Intermediate
Middle School
296 Station Ave
South Yarmouth, Massachusetts 02664
RFI #165: Corrective Action for Missing Pier at K/B25
Status Open
To Russell Higgins (Perkins Eastman)
Andrew Hazelton (Perkins Eastman)
Leah Schroeder (Perkins Eastman)
From Timeo Sequeira (Commodore Builders)
404 Wyman St., Suite 400
Waltham, Massachusetts 02451
Date Initiated Aug 23, 2021 Due Date Sep 1, 2021
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section 03 3000 - Cast-In-Place Concrete Cost Code
Drawing Number Reference
Linked Drawings
Received From Jose Maria (Marguerite Concrete Inc.)
Copies To Kenneth Anderson (Girard and Company, LLP), Ryan DiRico (Commodore Builders), Paul Genereux (Commodore Builders),
Russell Higgins (Perkins Eastman), Jeff W. Martin (Commodore Builders), Jeanine Palmieri (Consulting Engineering Services ),
Leah Schroeder (Perkins Eastman), Paul Sekas (Consulting Engineering Services ), Timeo Sequeira (Commodore Builders),
Ricky Sughrue (Commodore Builders), PMA Consultants Team Email (PMA Consultants)
ADDITIONAL FIELDS
Priority HIGH
Activity
Question Question from Timeo Sequeira Commodore Builders on Monday, Aug 23, 2021 at 12:54 PM EDT
Please see the attached RFI and sketch from Marguerite and advise if the proposed solution is acceptable to address the
missing pier at K/B25 line
Attachments
MC-RFI-3 - Missing Pier Repair.pdf
Awaiting an Official Response
Commodore Builders Page 1 of 1 Printed On: Aug 23, 2021 12:54 PM EDT
Refer to attached sketch for field fix to missing pier at K/b24.
Kevin M. Brown, PE 08/31/2021
Girard and Company, LLP
Project: 21-05-094 Dennis Yarmouth Int/Mid
School
286 Station Avenue
S. Yarmouth, Massachusetts 02664
RFI #MC-RFI-3: Missing Pier Repair
Status Open
To Jose Maria (Marguerite Concrete Inc.) From Jose Maria (Marguerite Concrete Inc.)
Date Initiated Aug 23, 2021 Due Date Aug 26, 2021
Location Project Stage
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From
Copies To
Activity
Question Question from Jose Maria Marguerite Concrete Inc. on Monday, Aug 23, 2021 at 12:20 PM EDT
Marguerite proposes the following procedure to address the pier that was not placed at K and B25 line.
Awaiting an Official Response
Page 1 of 1 Printed On: Aug 23, 2021 12:20 PM EDT
MARGUERITE PROPOSES THE FOLLOWING PROCEDURE TO ADDRESS THE MISSING PIER AT K AND B25 LINE:CHIP THE ORANGE AREA DOWN TO EL. -1'EMBED 9" #4 REBAR 3" INTO THE EXISTING CONTINUOS FOOTING @ 12" USING THE APPROVED PURE 110+EPOXY.EMBED 9" #4 REBAR 3" INTO THE EXISTING CONTINOUS FOOTING @ 6" ALONG THE PIER USING THE APPROVEDPURE 110+ EPOXY.INFILL THE 2' X 5' SECTION OF FOOTING AND INSTALL THE PIER
FIRST FLOOR SLAB
ELEV. = 28' - 2 3/8"
b24
2'-4"6" 6"T/PIER1'-0"EMBEDMENT1'-0"3 1/4"
2" CLR.
CHIP OUT IN-PLACE
CONCRETE WALL AS SHOWN.
B B
A A
3"EMBED VERTICAL PIER REINFORCING
3" IN IN-PLACE CONCRETE WALL
WITH APPROVED EPOXY.
CONCRETE ENCASED STEEL
COLUMN AND BASEPLATE.
FOUR (4) 3/4" DIA.
HEADED ANCHOR RODS.
IN--PLACE CONCRETE WALL AND FOOTING.NEW CONCRETE
FOOTING 1'-6"
3" CLR.2" CLR.1'-0"1'-0"CONCRETE SLAB ON GRADE.
S E C T I O N B - B
3 #5 WITH STANDARD 180° HOOK
AT EACH END IN LONG DIRECTION.
6 #5 WITH STANDARD
180° HOOK DOWELED
INTO IN-PLACE WALL
IN SHORT DIRECTION.
EMBED FOOTING REINFORCING
6" IN IN-PLACE CONCRETE WALL
WITH APPROVED EPOXY.
#6 VERTICAL PIER REINFORCING
WITH STANDARD 90° HOOK IN
FOOTING. TYPICAL OF FIVE (5).
IN-PLACE CONCRETE FOOTING AND
FOUNDATION WALL.
K
OUTLINE OF REINFORCED
CONCRETE PIER ABOVE.3'-0"3'-0"1'-6" 1'-0"
NEW REINFORCED CONCRETE FOOTING.
S E C T I O N A - A 2'-0"1'-0"1'-0"CHIP OUT IN-PLACE CONCRETE
WALL AS SHOWN TO A DEPTH
OF 2'-4" BELOW FINISH FLOOR.
K
b24
1'-6" 6"
6"
8 #6 VERTICAL PIER REINFORCING BARS.
REINFORCED CONCRETE PIER.
#3 TIE AT 12" o.c. MAX.
PROVIDE ADDITIONAL
TIE AT TOP OF PIER.
#3 TIE AT 12" o.c. MAX AT BOTTOM
OF PIER. PROVIDE ADDITIONAL TIE
AT BOTTOM OF PIER.
CONCRETE ENCASED
STEEL COLUMN.
IN-PLACE CONCRETE FOUNDATION WALL.