Loading...
HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2021-09-03Summary Report #14 September 6, 2021 Job No: 5951 Job Name:Dennis Yarmouth Middle School 296 Station Ave South Yarmouth, MA 02664 Application No.: TESTING INSPECTION ENGINEERING EM 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York August 30, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. James Descoteaux picked up (10) concrete cylinders from the jobsite. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. August 31, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Soil samples obtained: (1) total. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. September 1, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) obtained: (5) per set, (2) set(s), (10) total. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. September 2, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. James Descoteaux picked up (10) concrete cylinders and (1) soil sample from the jobsite. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of TESTING INSPECTION ENGINEERING EM 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York workmanship. September 3, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) obtained: (5) per set, (1) set(s), (5) total. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Reviewed by: Enea Mushi Project Manager 09-08-2021 Date Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com) Administrative Contact: Gina Salerno (gsalerno@fenaghengineering.com) TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali August 30, 2021 Time In: 07:00 Time Out: 15:00 Weather: Sunny Temperature: 77°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 08-30-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate compactor, sheep’s foot, excavator , Dozer. No samples taken. Density Std (DS): 2541 Moisture Std (MS): 476 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: Building C exterior Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Plate compactor, sheep’s foot Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 E/c2 6 -3 TOW 1 109.8 4.8 95 Pass 2 F/c2 6 -2 TOW 1 110.5 3.6 95 Pass 3 G/c1 6 -1 TOW 1 110.9 4.2 96 Pass 4 H/c3 6 -1 TOW 1 111.1 4.0 96 Pass 'DLO\3LFN8S5HSRUW Job NumberProject Name Fenagh RepresentativeDate Cylinders Shotcrete Grout 0RUWDU *URXW&XEHV Prisms 37&DEOHV )LUHSURRILQJ6DPSOHV 6RLO6DPSOHV 5HEDU6DPSOHV 6WHHO3ODWHV 2WKHU $GGLWLRQDO&RPPHQWV Job6ite6hop Batch Plant/Quarry OtherBB______ &XUH%R[7HPSBBBBBB+LJK/RZ7HPSBBBBBBBB2XWVLGH7HPSBBBBBB Dennis-Yarmouth MS 5951 James Descoteaux 08/30/2021 ■ 71 79 10 NA TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali August 31, 2021 Time In: 07:00 Time Out: 15:00 Weather: Temperature: 73°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 08-31-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate compactor, sheep’s foot, excavator , Dozer. Obtained (1) sample(s). RBO Crushed Concrete from Jobsite Test required: ASTM D1557 Moisture-Density Relations of Soil Using Modified Effort (Modified Proctor). Density Std (DS): 2534 Moisture Std (MS): 473 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: Building D exterior Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Plate compactor, sheep’s foot Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 D.1/d22 6 -4 TOW 1 111.0 4.4 96 Pass 2 A/d25 6 -3 TOW 1 110.2 4.3 95 Pass 3 C/d24 6 -2 TOW 1 110.6 4.8 96 Pass 4 C/d24 6 -1 TOW 1 109.9 4.9 95 Pass TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Reinforcing Steel Placement Pg. 1 of 1 August 31, 2021 Time In: 11:00 Time Out: 12:00 Weather: Temperature: 73°F Permit No. : Plans Dated: 06/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 08-31-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Additional Notes: Wall: b3-12.3/K, H-K/b15rnFootings: a6/U, auditorium seats Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 wall(s) at b3-12.3/K, H-K/b15. Work complete. Reference detail Sheet R015. Reinforcing Steel and Anchor Bolts Y N Y N Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓ Rebar The Proper Size ✓Rebar The Proper Type/grade ✓ Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓ Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓ Rebar Testing Complete And Passed If Required ✓ TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 September 1, 2021 Time In: 07:00 Time Out: 11:30 Weather: Sunny Temperature: 73°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-01-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Level 1, wall(s) at Wall: b3-12.3/K, H-K/b15 Footings: a6/U, auditorium seatings (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 77 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from Pump truck. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 5.5 70 73 6.2 144.1 52 K/b3 5 9:33 AM 10:12 AM Marguerite 1698 41 2 5.75 70 73 5.9 144.6 55 U/a6 5 10:26 AM 11:10 AM Marguerite 2173 0 10 Total Additional Notes: Wall: b3-12.3/K, H-K/b15.rnFootings: a6/U, auditorium seatings. Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali September 1, 2021 Time In: 07:00 Time Out: 15:00 Weather: Sunny Temperature: 73°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-01-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate compactor, sheep’s foot, excavator , Dozer. No samples taken. Density Std (DS): 2528 Moisture Std (MS): 477 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: Building C/D exterior Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Plate compactor, sheep’s foot Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 D.5/c4 6 -2 TOW 1 111.3 4.0 96 Pass 2 d5/D.5 6 -1 TOW 1 109.9 4.5 95 Pass TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali September 2, 2021 Time In: 07:00 Time Out: 15:00 Weather: Temperature: 80°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-02-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s foot, excavator , Dozer. No samples taken. Density Std (DS): 2525 Moisture Std (MS): 476 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: Drainagesystem by lot 1 and 3 Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Sheep’s foot Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 Lot 1 6 23 1 110.0 4.3 95 Pass 2 Lot 3 6 21 1 110.5 4.1 95 Pass 3 Lot 3 6 22 1 110.8 4.6 96 Pass 'DLO\3LFN8S5HSRUW Job NumberProject Name Fenagh RepresentativeDate Cylinders Shotcrete Grout 0RUWDU *URXW&XEHV Prisms 37&DEOHV )LUHSURRILQJ6DPSOHV 6RLO6DPSOHV 5HEDU6DPSOHV 6WHHO3ODWHV 2WKHU $GGLWLRQDO&RPPHQWV Job6ite6hop Batch Plant/Quarry OtherBB______ &XUH%R[7HPSBBBBBB+LJK/RZ7HPSBBBBBBBB2XWVLGH7HPSBBBBBB Dennis-Yarmouth MS 5951 James Descoteaux 09/02/2021 ■ 70 64 10 1 TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 September 3, 2021 Time In: 07:00 Time Out: 08:30 Weather: Temperature: 82°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-03-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Level 1, wall(s) at Wall: T-W/a1, a1-8/W Spread footings: V/a4, U/a5, a6/V, a5/V.5, V and V.5/a8 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 33 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from Pump truck. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 5.75 70 82 6.1 144.7 62 U/a5 5 7:07 AM 7:47 AM Marguerite 2174 7 5 Total Additional Notes: Wall: T-W/a1, a1-8/W Spread footings: V/a4, U/a5, a6/V, a5/V.5, V and V.5/a8. Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali September 3, 2021 Time In: 07:00 Time Out: 15:00 Weather: Temperature: 82°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-03-2021 Date Enea Mushi Project Manager 09-07-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof roller , Dozer. No samples taken. Density Std (DS): 2524 Moisture Std (MS): 489 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: Roadwa west of Lot 2 Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Proof roller Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 Roadway 6 22 1 110.6 3.7 96 Pass 2 Roadway 6 22 1 110.8 3.6 96 Pass NCR ID#Date Location Inspector Issue RFI/ Submittal No.Resolved? (Y/N)Sub/ Contractor Date Resolved Comment 1 7/30/2021 Set # 1 :Column line/Row: D.3/c116 Set # 2 Columm line / Row c5/H Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y EOR to Advise 7 day break 08/06/2021 Set 1 = 2,330 psi Set 2 = 2,330 psi 28 day break 08/27/2021 Set 1 = 3,070 psi Set 1 = 3,330 psi Set 1 = 3,430 psi Set 2 = 3,330 psi Set 2 = 3,520 psi Set 2 = 3,580 psi 2 8/3/2021 Elevator pit foundation Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y EOR to Advise 7 day break 08/10/2021 Set 1 = 2,610 psi 28 day break 08/31/2021 Set 1 = 3,170 psi Legend: Status: Closed Status: Open TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/13/2021 Lab Log No.: 15237 (2571C) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 53 Design Strength (psi): 3,500 @28 days Ticket#: 30975 Sample Material/Shape: 4x8 Cylinders Type of Structure: Footings Location: Onsite Location for overall pour: Foundation Footings at B/d4-d23, d17-d25/A Location when sampled: B/d4 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):73 50-90 Slump or Spread (in.):5.25 4-6 Unit Wt (#cu ft):144.3 140-150 Air Temperature (ºF):66 >40 Air Content (%):4.5 4.5-7.5 Time Sampled:8:25 AM Aggregate Size (in):3/4 N/A Batch Time:7:35 AM Time in Truck:50 minutes Information supplied by Laboratory Technician Date Received: 07/14/2021 Technician that received: Billy Coughlin Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 07/20/2021 John Lydstone 4.00 8.00 12.57 Lab 41,264 3,280 psi Type 2 B 23 08/05/2021 Charles Martens 4.00 8.00 12.57 Lab 53,270 4,240 psi Type 2 C 28 08/10/2021 CM/ATL 4.00 8.00 12.57 Lab 57,250 4,550 psi Type 3 D 28 08/10/2021 CM/ATL 4.00 8.00 12.57 Lab 57,550 4,580 psi Type 2 E 23 08/05/2021 CM/ATL 4.00 8.00 12.57 Lab 60,260 4,790 psi Type 2 MEETS DESIGN STRENGTH 28 Day Avg.:4,570 psi Remarks: Test B-E sample tested at Allied Testing Laboratories, Inc, CTL #207-018 TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/15/2021 Lab Log No.: 15258 (2592C) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 67 Design Strength (psi): 3,500 @28 days Ticket#: 31023 Sample Material/Shape: 4x8 Cylinders Type of Structure: Footings Location: Onsite Location for overall pour: Foundation, Wal Footings at d2-d17/A, B-C/d25 Location when sampled: d6/A Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):72 50-90 Slump or Spread (in.):5 4-6 Unit Wt (#cu ft):145.2 140-150 Air Temperature (ºF):76 >40 Air Content (%):5.6 4.5-7.5 Time Sampled:12:40 PM Aggregate Size (in):3/4 N/A Batch Time:12:00 PM Time in Truck:40 minutes Information supplied by Laboratory Technician Date Received: 07/19/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 07/22/2021 Evan Mei 4.00 8.00 12.57 Lab 33,270 2,650 psi Type 2 B 21 08/05/2021 Charles Martens 4.00 8.00 12.57 Lab 46,990 3,740 psi Type 3 C 28 08/12/2021 CM/ATL 4.00 8.00 12.57 Lab 47,620 3,790 psi Type 2 D 28 08/12/2021 CM/ATL 4.00 8.00 12.57 Lab 48,500 3,860 psi Type 3 E 28 08/12/2021 CM/ATL 4.00 8.00 12.57 Lab 48,800 3,880 psi Type 3 MEETS DESIGN STRENGTH 28 Day Avg.:3,840 psi Remarks: Test B-E samples tested at Allied Testing Laboratories, Inc, CTL #207-018 TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/16/2021 Lab Log No.: 15268 (2610) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 67 Design Strength (psi): 3,500 @28 days Ticket#: 31035 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Foundation Footings at d3-d22/C, d3-d22/B, d2-d4/A, A-D/d1, d1-d3/D Location when sampled: d15/B Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):4.5 4-6 Unit Wt (#cu ft):144.4 140-150 Air Temperature (ºF):79 >40 Air Content (%):5.3 4.5-7.5 Time Sampled:8:20 AM Aggregate Size (in):3/4 N/A Batch Time:7:42 AM Time in Truck:38 minutes Information supplied by Laboratory Technician Date Received: 07/20/2021 Technician that received: Max Nabulsi Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 07/23/2021 Evan Mei 4.00 8.00 12.57 Lab 34,027 2,710 psi Type 2 B 20 08/05/2021 Charles Martens 4.00 8.00 12.57 Lab 46,760 3,720 psi Type 3 C 28 08/13/2021 CM/ATL 4.00 8.00 12.57 Lab 46,820 3,720 psi Type 4 D 28 08/13/2021 CM/ATL 4.00 8.00 12.57 Lab 48,090 3,830 psi Type 3 E 28 08/13/2021 CM/ATL 4.00 8.00 12.57 Lab 52,210 4,150 psi Type 3 MEETS DESIGN STRENGTH 28 Day Avg.:3,900 psi Remarks: Test B-E sample tested at Allied Testing Laboratories, Inc, CTL #207-018 TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/19/2021 Lab Log No.: 15348 (2659) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 67 Design Strength (psi): 3,500 @28 days Ticket#: 31073 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at A/d17-d23, C-D/d24, d24-d20/D, D-C116 Location when sampled: d15/B Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):68 50-90 Slump or Spread (in.):4.5 4-6 Unit Wt (#cu ft):144.0 140-150 Air Temperature (ºF):77 >40 Air Content (%):5.9 4.5-7.5 Time Sampled:12:47 PM Aggregate Size (in):3/4 N/A Batch Time:11:59 AM Time in Truck:48 minutes Information supplied by Laboratory Technician Date Received: 07/21/2021 Technician that received: Max Nabulsi Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 07/26/2021 Evan Mei 4.00 8.00 12.57 Lab 39,092 3,110 psi Type 2 B 17 08/05/2021 Charles Martens 4.00 8.00 12.57 Lab 52,140 4,150 psi Type 5 C 28 08/16/2021 CM/ATL 4.00 8.00 12.57 Lab 55,900 4,450 psi Type 4 D 28 08/16/2021 CM/ATL 4.00 8.00 12.57 Lab 57,500 4,570 psi Type 3 E 28 08/16/2021 CM/ATL 4.00 8.00 12.57 Lab 63,220 5,030 psi Type 4 MEETS DESIGN STRENGTH 28 Day Avg.:4,680 psi Remarks: Test B-E samples tested at Allied Testing Laboratories, Inc, CTL #207-018 TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/21/2021 Lab Log No.: 15386 (2693) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 73 Design Strength (psi): 3,500 @28 days Ticket#: 31097 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at D/d3-d5, C/d3-d22, d23-d25/A, A-D/25 Location when sampled: C/d3 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.8 140-150 Air Temperature (ºF):77 >40 Air Content (%):5.5 4.5-7.5 Time Sampled:8:25 AM Aggregate Size (in):3/4 N/A Batch Time:7:29 AM Time in Truck:56 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 07/26/2021 Technician that received: Billy Coughlin Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 07/28/2021 Evan Mei 4.00 8.00 12.57 Lab 23,363 1,860 psi Type 2 B 15 08/05/2021 Charles Martens 4.00 8.00 12.57 Lab 32,650 2,600 psi Type 5 C 28 08/18/2021 CM/ATL 4.00 8.00 12.57 Lab 35,200 2,800 psi Type 2 D 28 08/18/2021 CM/ATL 4.00 8.00 12.57 Lab 36,440 2,900 psi Type 2 E 28 08/18/2021 CM/ATL 4.00 8.00 12.57 Lab 43,700 3,480 psi Type 2 FAILS TO MEET DESIGN STRENGTH 28 Day Avg.:3,060 psi Remarks: Test B-E samples tested at Allied Testing Laboratories, Inc, CTL #207-018. Low 28-Day Average compressive strength. TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/23/2021 Lab Log No.: 15424 (2706) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 73 Design Strength (psi): 3,500 @28 days Ticket#: 31132 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at d4-d2/A, A-D/d1, d1-d3/D, D/d18, d14-d9/D, D-JJ/d9, c4-c12/F, c4-c12/G Location when sampled: D/d3 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):68 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.5 140-150 Air Temperature (ºF):73 >40 Air Content (%):5.6 4.5-7.5 Time Sampled:7:40 AM Aggregate Size (in):3/4 N/A Batch Time:6:40 AM Time in Truck:60 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 07/27/2021 Technician that received: Max Nabulsi Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 07/30/2021 Evan Mei 4.00 8.00 12.57 Lab 30,884 2,460 psi Type 2 B 13 08/05/2021 CM/ATL 4.00 8.00 12.57 Lab 38,210 3,040 psi Type 3 C 28 08/20/2021 CM/ATL 4.00 8.00 12.57 Lab 43,520 3,460 psi Type 2 D 28 08/20/2021 CM/ATL 4.00 8.00 12.57 Lab 47,250 3,760 psi Type 3 E 28 08/20/2021 CM/ATL 4.00 8.00 12.57 Lab 51,230 4,080 psi Type 3 MEETS DESIGN STRENGTH 28 Day Avg.:3,770 psi Remarks: Test B-E samples tested at Allied Testing Laboratories, Inc, CTL #207-018 TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/28/2021 Lab Log No.: 15519 (2744-2745) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 2 Truck #: 55 Design Strength (psi): 3,500 @28 days Ticket#: 31197 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at C116/D.3, C16/E, c20/G Location when sampled: C16/E Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):5 4-6 Unit Wt (#cu ft):144.2 140-150 Air Temperature (ºF):72 >40 Air Content (%):5.4 4.5-7.5 Time Sampled:7:55 AM Aggregate Size (in):3/4 N/A Batch Time:7:02 AM Time in Truck:53 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 07/30/2021 Technician that received: Max Nabulsi Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/04/2021 Evan Mei 4.00 8.00 12.57 Lab 33,496 2,660 psi Type 2 B 28 08/25/2021 Henry Soares 4.00 8.00 12.57 Lab 42,090 3,350 psi Type 2 C 28 08/25/2021 Henry Soares 4.00 8.00 12.57 Lab 43,953 3,500 psi Type 2 D 28 08/25/2021 Henry Soares 4.00 8.00 12.57 Lab 45,524 3,620 psi Type 6 E H H 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH 28 Day Avg.:3,490 psi Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/28/2021 Lab Log No.: 15519 (2744-2745) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 2 of 2 Truck #: 53 Design Strength (psi): 3,500 @28 days Ticket#: 31199 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at C116/D.3, C16/E, c20/G Location when sampled: c18/F Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):67 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.7 140-150 Air Temperature (ºF):72 >40 Air Content (%):5.7 4.5-7.5 Time Sampled:8:55 AM Aggregate Size (in):3/4 N/A Batch Time:7:51 AM Time in Truck:64 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 07/30/2021 Technician that received: Max Nabulsi Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/04/2021 Evan Mei 4.00 8.00 12.57 Lab 37,601 2,990 psi Type 2 B 28 08/25/2021 Max Nabulsi 4.00 8.00 12.57 Lab 49,335 3,920 psi Type 2 C 28 08/25/2021 Max Nabulsi 4.00 8.00 12.57 Lab 49,598 3,950 psi Type 2 D 28 08/25/2021 Max Nabulsi 4.00 8.00 12.57 Lab 53,275 4,240 psi Type 2 E H H 4.00 8.00 12.57 Lab MEETS DESIGN STRENGTH 28 Day Avg.:4,040 psi Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/30/2021 Lab Log No.: 15564 (2802-2803) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 2 Truck #: 52 Design Strength (psi): 3,500 @28 days Ticket#: 31234 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at Building C Location when sampled: D.3/c116 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.0 140-150 Air Temperature (ºF):72 >40 Air Content (%):6.2 4.5-7.5 Time Sampled:10:45 AM Aggregate Size (in):3/4 N/A Batch Time:9:50 AM Time in Truck:55 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/04/2021 Technician that received: Max Nabulsi Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/06/2021 Charles Martens 4.00 8.00 12.57 Lab 29,320 2,330 psi Type 3 B 28 08/27/2021 James Descoteaux 4.00 8.00 12.57 Lab 38,617 3,070 psi Type 2 C 28 08/27/2021 James Descoteaux 4.00 8.00 12.57 Lab 41,875 3,330 psi Type 2 D 28 08/27/2021 James Descoteaux 4.00 8.00 12.57 Lab 43,066 3,430 psi Type 3 E 56 09/24/2021 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH 28 Day Avg.:3,280 psi Remarks: Test A samples tested at Allied Testing Laboratories, Inc, CTL #207-018. Low 28-Day Average compressive strength. TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 07/30/2021 Lab Log No.: 15564 (2802-2803) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 2 of 2 Truck #: 53 Design Strength (psi): 3,500 @28 days Ticket#: 31238 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at Building C Location when sampled: c5/H Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.5 140-150 Air Temperature (ºF):72 >40 Air Content (%):5.7 4.5-7.5 Time Sampled:1:30 PM Aggregate Size (in):3/4 N/A Batch Time:12:19 PM Time in Truck:71 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/04/2021 Technician that received: Max Nabulsi Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/06/2021 Charles Martens 4.00 8.00 12.57 Lab 31,480 2,500 psi Type 3 B 28 08/27/2021 James Descoteaux 4.00 8.00 12.57 Lab 41,853 3,330 psi Type 2 C 28 08/27/2021 James Descoteaux 4.00 8.00 12.57 Lab 44,200 3,520 psi Type 2 D 28 08/27/2021 James Descoteaux 4.00 8.00 12.57 Lab 45,017 3,580 psi Type 2 E 56 09/24/2021 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH 28 Day Avg.:3,480 psi Remarks: Test A samples tested at Allied Testing Laboratories, Inc, CTL #207-018. Low 28-Day Average compressive strength. TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/03/2021 Lab Log No.: 15623 (2814-2815) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 2 Truck #: 73 Design Strength (psi): 3,500 @28 days Ticket#: 31260 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at Building C and D Location when sampled: Elevator pit foundation Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.3 140-150 Air Temperature (ºF):77 >40 Air Content (%):6.6 4.5-7.5 Time Sampled:7:40 AM Aggregate Size (in):3/4 N/A Batch Time:6:53 AM Time in Truck:47 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/04/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/10/2021 CM/ATL 4.00 8.00 12.57 Lab 32,830 2,610 psi Type 4 B 28 08/31/2021 Henry Soares 4.00 8.00 12.57 Lab 39,850 3,170 psi Type 2 C 56 09/28/2021 4.00 8.00 12.57 Lab D 56 09/28/2021 4.00 8.00 12.57 Lab E 56 09/28/2021 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH Remarks: All samples tested at Allied Testing Laboratory, Inc, CTL# 207-018. Low 28-Day Indication test result, remaining samples held for 56-Days. TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/03/2021 Lab Log No.: 15623 (2814-2815) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 2 of 2 Truck #: 59 Design Strength (psi): 3,500 @28 days Ticket#: 31264 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at Building C and D Location when sampled: c22/H Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):5.75 4-6 Unit Wt (#cu ft):144.7 140-150 Air Temperature (ºF):77 >40 Air Content (%):6.2 4.5-8 Time Sampled:10:30 AM Aggregate Size (in):3/4 N/A Batch Time:9:24 AM Time in Truck:66 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/04/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/10/2021 CM/ATL 4.00 8.00 12.57 Lab 37,310 2,970 psi Type 4 B 28 08/31/2021 Henry Soares 4.00 8.00 12.57 Lab 50,930 4,050 psi Type 5 C 28 08/31/2021 Henry Soares 4.00 8.00 12.57 Lab 50,881 4,050 psi D 28 08/31/2021 Henry Soares 4.00 8.00 12.57 Lab 48,854 3,890 psi E H H 4.00 8.00 12.57 Lab MEETS DESIGN STRENGTH 28 Day Avg.:4,000 psi Remarks: All samples tested at Allied Testing Laboratory, Inc, CTL# 207-018 TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/13/2021 Lab Log No.: 15745 (2945-2946) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 2 Truck #: 68 Design Strength (psi): 3,500 @28 days Ticket#: 31410 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at Building B Location when sampled: P.1/b33 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):72 50-90 Slump or Spread (in.):5.25 4-6 Unit Wt (#cu ft):144.5 140-150 Air Temperature (ºF):80 >40 Air Content (%):5.0 4.5-7.5 Time Sampled:7:38 AM Aggregate Size (in):3/4 N/A Batch Time:7:00 AM Time in Truck:38 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/18/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 17 08/30/2021 Max Nabulsi 4.00 8.00 12.57 Lab 38,847 3,090 psi Type 2 B 28 09/10/2021 4.00 8.00 12.57 Lab C 28 09/10/2021 4.00 8.00 12.57 Lab D 28 09/10/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/13/2021 Lab Log No.: 15745 (2945-2946) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape cod Ready Mix Contractor: Marguerite Set: 2 of 2 Truck #: 68 Design Strength (psi): 3,500 @28 days Ticket#: 31416 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at Building B Location when sampled: J.3/b24 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):69 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.0 140-150 Air Temperature (ºF):80 >40 Air Content (%):5.5 4.5-7.5 Time Sampled:9:50 AM Aggregate Size (in):3/4 N/A Batch Time:9:00 AM Time in Truck:50 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/18/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/20/2021 Max Nabulsi 4.00 8.00 12.57 Lab 29,191 2,320 psi Type 2 B 28 09/10/2021 4.00 8.00 12.57 Lab C 28 09/10/2021 4.00 8.00 12.57 Lab D 28 09/10/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/10/2021 Lab Log No.: 15795 Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 73 Design Strength (psi): 3,500 @28 days Ticket#: 31339 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at Building C and B Location when sampled: C18/E Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):71 50-90 Slump or Spread (in.):5.75 4-6 Unit Wt (#cu ft):144.7 140-150 Air Temperature (ºF):70 >40 Air Content (%):5.7 4.5-7.5 Time Sampled:7:45 AM Aggregate Size (in):3/4 N/A Batch Time:7:00 AM Time in Truck:45 minutes Information supplied by Laboratory Technician Date Received: 08/11/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/17/2021 Max Nabulsi 4.00 8.00 12.57 Lab 37,275 2,970 psi Type 5 B 28 09/07/2021 4.00 8.00 12.57 Lab C 28 09/07/2021 4.00 8.00 12.57 Lab D 28 09/07/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/17/2021 Lab Log No.: 15811 (2947) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 55 Design Strength (psi): 3,500 @28 days Ticket#: 21627 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at b30-b27/S.1, P-S.1/b27 Location when sampled: S.1/b27 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):70 50-90 Slump or Spread (in.):5.5 4-6 Unit Wt (#cu ft):144.8 140-150 Air Temperature (ºF):78 >40 Air Content (%):6.7 4.5-7.5 Time Sampled:10:04 AM Aggregate Size (in):3/4 N/A Batch Time:9:13 AM Time in Truck:51 minutes Information supplied by Laboratory Technician Date Received: 08/18/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/24/2021 Henry Soares 4.00 8.00 12.57 Lab 31,558 2,510 psi Type 3 B 28 09/14/2021 4.00 8.00 12.57 Lab C 28 09/14/2021 4.00 8.00 12.57 Lab D 28 09/14/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/18/2021 Lab Log No.: 15817 (2975) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 72 Design Strength (psi): 3,500 @28 days Ticket#: 31461 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at J.3-J.7/b31, b23-33/J.7, J.7-N/b33, J.3-K.3/b23 Location when sampled: K/b17 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):69 50-90 Slump or Spread (in.):5.0 4-6 Unit Wt (#cu ft):144.3 140-150 Air Temperature (ºF):78 >40 Air Content (%):5.4 4.5-7.5 Time Sampled:7:40 AM Aggregate Size (in):3/4 N/A Batch Time:6:58 AM Time in Truck:42 minutes Information supplied by Laboratory Technician Date Received: 08/19/2021 Technician that received: John Lydstone Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/25/2021 James Descoteaux 4.00 8.00 12.57 Lab 38,125 3,030 psi Type 3 B 28 09/15/2021 4.00 8.00 12.57 Lab C 28 09/15/2021 4.00 8.00 12.57 Lab D 28 09/15/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/20/2021 Lab Log No.: 15860 (3024) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 52 Design Strength (psi): 3,500 @28 days Ticket#: 169676 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Footings Location: Onsite Location for overall pour: Level 1 Footings at Foundation: H-K/b15 Wall: H/c5, c7/H, c15/H-H.8 Location when sampled: H/c5 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):71 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.6 140-150 Air Temperature (ºF):80 >40 Air Content (%):6.0 4.5-7.5 Time Sampled:7:25 AM Aggregate Size (in):3/4 N/A Batch Time:6:42 AM Time in Truck:43 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/27/2021 Technician that received: James Descoteaux Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/27/2021 James Descoteaux 4.00 8.00 12.57 Lab 35,350 2,810 psi Type 3 B 28 09/17/2021 4.00 8.00 12.57 Lab C 28 09/17/2021 4.00 8.00 12.57 Lab D 28 09/17/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 5 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/03/2021 Client: PMA Date of Sampling: 08/24/2021 Lab Log No.: 15871 (3016) Reviewed by: CJ Martens 09/03/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 1 Truck #: 53 Design Strength (psi): 3,500 @28 days Ticket#: 31516 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at K-P/b24, b24-33/P, N-P.1/b33 Location when sampled: N.4/b33 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):72 50-90 Slump or Spread (in.):5.5 4-6 Unit Wt (#cu ft):144.1 140-150 Air Temperature (ºF):75 >40 Air Content (%):5.75 4.5-7.5 Time Sampled:7:42 AM Aggregate Size (in):3/4 N/A Batch Time:7:00 AM Time in Truck:42 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/25/2021 Technician that received: James Descoteaux Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/31/2021 Henry Soares 4.00 8.00 12.57 Lab 39,465 3,140 psi Type 5 B 28 09/21/2021 4.00 8.00 12.57 Lab C 28 09/21/2021 4.00 8.00 12.57 Lab D 28 09/21/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/09/2021 Client: PMA Date of Sampling: 08/06/2021 Lab Log No.: 15654 Reviewed by: CJ Martens 09/09/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 2 Truck #: 56 Design Strength (psi): 3,500 @28 days Ticket#: 31302 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at Building C and B Location when sampled: E/c2 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):72 50-90 Slump or Spread (in.):5.5 4-6 Unit Wt (#cu ft):144.6 140-150 Air Temperature (ºF):75 >40 Air Content (%):5.8 4.5-7.5 Time Sampled:7:35 AM Aggregate Size (in):3/4 N/A Batch Time:6:51 AM Time in Truck:44 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/10/2021 Technician that received: Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/13/2021 4.00 8.00 12.57 Lab 37,510 2,980 psi B 28 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 39,847 3,170 psi Type 2 C 56 10/01/2021 4.00 8.00 12.57 Lab D 56 10/01/2021 4.00 8.00 12.57 Lab E 56 10/01/2021 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH Remarks: All samples tested at Allied Testing Laboratory, Inc, CTL# 207-018; *Low Indication Compressive Strength at 28-Days, Remaining specimens will be held for 56-Days TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/09/2021 Client: PMA Date of Sampling: 08/06/2021 Lab Log No.: 15654 Reviewed by: CJ Martens 09/09/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 2 of 2 Truck #: 51 Design Strength (psi): 3,500 @28 days Ticket#: 31527 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at Building C and B Location when sampled: J.7/b25 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF):72 50-90 Slump or Spread (in.):6.0 4-6 Unit Wt (#cu ft):144.1 140-150 Air Temperature (ºF):75 >40 Air Content (%):6.3 4.5-7.5 Time Sampled:9:10 AM Aggregate Size (in):3/4 N/A Batch Time:8:21 AM Time in Truck:49 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/10/2021 Technician that received: Test # Age of Test (Days) Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/13/2021 CM/ATL 4.00 8.00 12.57 Lab 30,080 2,390 psi B 28 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 42,433 3,380 psi Type 2 C 56 10/01/2021 4.00 8.00 12.57 Lab D 56 10/01/2021 4.00 8.00 12.57 Lab E 56 10/01/2021 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH Remarks: All samples tested at Allied Testing Laboratory, Inc, CTL# 207-018