Loading...
HomeMy WebLinkAboutJ5951-15 Dennis Yarmouth Middle School WE 2021-09-10Summary Report #15 September 13, 2021 Job No: 5951 Job Name:Dennis Yarmouth Middle School 296 Station Ave South Yarmouth, MA 02664 TESTINGINSPECTIONENGINEERING SW 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas Application No.: September 7, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) obtained: (5) per set, (1) set(s), (5) total. See attached. Arsene Ntwali performed soils compaction testing. No Samples Taken. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. September 8, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached. Peter Wilson picked up (10) concrete cylinders from the jobsite. The work observed was, to the best of Arsene's, Peter's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. September 9, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) obtained: (5) per set, (1) set(s), (5) total. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. Enea Mushi reported to Mitch Miller with PMA Consulting at the 296 Station Ave. Performed site visit inspection. See attached. The work observed was, to the best of Arsene's, Enea's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. September 10, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) TESTING INSPECTION ENGINEERING SW 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York obtained: (5) per set, (1) set(s), (5) total. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Reviewed by: Joe Francisco Field Supervisor 09-17-2021 Date Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com) Administrative Contact: Gina Salerno (gsalerno@fenaghengineering.com) TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 September 7, 2021 Time In: 07:00 Time Out: 09:00 Weather: Sunny Temperature: 75°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-07-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Level 1, footings at L/b15-20, M.5/b17-21 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 44 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from Pump truck. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 5.25 69 75 6.0 144.3 58 L/b15 5 7:22 AM 7:55 AM Marguerite 2175 6 5 Total Additional Notes: Spread footings: L/b15-20, M.5/b17-21 Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali September 7, 2021 Time In: 09:00 Time Out: 15:00 Weather: Sunny Temperature: 75°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-07-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof roller , Dozer. No samples taken. Density Std (DS): 2530 Moisture Std (MS): 485 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Import: General Location of Fill: Roadwa west of Lot 2 Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Proof roller Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture Crushed concrete 1 S794 126.4 7.7 Test# Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 Roadway 4 20 1 120.1 4.5 95 Pass 2 Roadway 4 20 1 121.2 5.0 96 Pass TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali September 8, 2021 Time In: 07:00 Time Out: 15:00 Weather: Temperature: 78°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-08-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s foot, Dozer. No samples taken. Density Std (DS): 2530 Moisture Std (MS): 486 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: Building C exterior Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Sheep’s foot Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture Loose glacial 1 S774 115.8 10 Test# Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 E/c20 6 -3 TOW 1 111.8 4.3 97 Pass 2 E/c22 6 -2 TOW 1 110.0 4.9 95 Pass 3 F/c22 6 -1 TOW 1 110.6 4.0 96 Pass TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Reinforcing Steel Placement Pg. 1 of 1 September 8, 2021 Time In: 11:00 Time Out: 12:00 Weather: Temperature: 78°F Permit No. : Plans Dated: 06/18/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-08-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 footings at L/b15-20, M.5/b17-21,N.5/a23-30. Work complete. Reference detail R012. Piers: L/b15-20, M.5/b17-21 Footings: N.5/a23-30. Reinforcing Steel and Anchor Bolts YN YN Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓ Rebar The Proper Size ✓Rebar The Proper Type/grade ✓ Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓ Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓ Rebar Testing Complete And Passed If Required ✓ 'DLO\3LFN8S5HSRUW -RE1XPEHU3URMHFW1DPH )HQDJK 5HSUHVHQWDWLYH'DWH &\OLQGHUV 6KRWFUHWH *URXW 0RUWDU *URXW&XEHV 3ULVPV 37&DEOHV )LUHSURRILQJ6DPSOHV 6RLO6DPSOHV 5HEDU6DPSOHV 6WHHO3ODWHV 2WKHU $GGLWLRQDO&RPPHQWV -RE6LWH6KRS %DWFK 3ODQW4XDUU\2WKHUBBBBBBBB &XUH%R[7HPSBBBBBB+LJK/RZ7HPSBBBBBBBB2XWVLGH7HPSBBBBBB ĞŶŶŝƐzĂƌŵŽƵƚŚ :ϱϵϱϭ WĞƚĞƌtŝůƐŽŶ ϬϵͬϬϴͬϮϬϮϭ ■ ϭϬ TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 September 9, 2021 Time In: 07:00 Time Out: 15:00 Weather: Sunny Temperature: 74°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-09-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Level 1, footings at L/b15-20, M.5/b17-21, N.5/a23-30 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 33 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from Pump truck. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 5.75 68 74 5.7 144.9 58 M.5/b17 5 7:04 AM 7:43 AM Marguerite 2177 5 5 Total Additional Notes: Pier: L/b15-20, M.5/b17-21rnFootings: N.5/a23-30 Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali September 9, 2021 Time In: 07:00 Time Out: 15:00 Weather: Sunny Temperature: 74°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-09-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s foot, excavator , Dozer. No samples taken. Density Std (DS): 2514 Moisture Std (MS): 480 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: Import: General Location of Fill: Building D west roadway Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Sheep’s foot Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture Loose glacial 1 S774 115.8 10 RBO Crushed concrete 2 S794 126.4 7.7 Test# Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 Roadway 6 19 1 110.6 4.4 96 Pass 2 Roadway 4 28 2 121.3 5.2 96 Pass TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi Inspection Type: Site Visit Pg. 1 of 1 September 9, 2021 Time In: 13:00 Time Out: 14:00 Weather: Rain Temperature: 60°F Permit No. : Plans Dated: N/A Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Enea Mushi Inspector 09-09-2021 Date Joe Francisco Field Supervisor 09-16-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Enea Mushi reported to Mitch Miller with PMA Consulting at the 296 Station Ave. Conducted a site visit to see project advancement, meet up with contractor and project management team. Meet with Ryan DiRico, Paul Genereux, Mitch Miller, Nick Hull. Discussed project, Fenagh's performance and staffing with the team. All parties where satisfied with the quality of work and staffing provided by Fenagh so far. I was notified by Mitch that the steel operations will start in roughly two week time. TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Enea Mushi September 9, 2021 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 September 10, 2021 Time In: 07:00 Time Out: 10:00 Weather: Cloudy Temperature: 77°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-10-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Level 1, wall(s) at a2/T-K, b2/M.9,L.9,K.8 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 40 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from Pump truck. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 6.0 71 74 6.1 144.5 72 L.9/b2 5 6:57 AM 7:21 AM Marguerite 3169 2 5 Total Additional Notes: Footings: b2/M.9,L.9,K.8rnWall: a2/T-K Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali September 10, 2021 Time In: 09:00 Time Out: 15:00 Weather: Cloudy Temperature: 77°F Permit No. : Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 09-10-2021 Date Enea Mushi Project Manager 09-14-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s foot, Dozer. No samples taken. Density Std (DS): 2520 Moisture Std (MS): 477 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Import: General Location of Fill: Building D/C courtyard Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 02/2022 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Sheep’s foot Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture RBO Crushed concrete 1 S794 126.4 7.7 Test# Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 Courtyard 4 26 1 120.2 5.5 95 Pass 2 Courtyard 4 26 1 120.8 4.8 96 Pass NCR ID#Date Location Inspector Issue RFI/ Submittal No.Resolved? (Y/N) Sub/ Contractor Date Resolved Comment 1 7/21/2021 Wall : C /d3 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% N Marguerite EOR to Advise 7 day break 08/10/2021 Set 1 = 1,860 psi 28 day break 08/31/2021 Set 1 = 2,800 psi Set 1 = 2,900 psi Set 1 = 3,480 psi No Samples Remaining 2 7/28/2021 Footing : C16/E Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% N Marguerite EOR to Advise 28 day break 08/31/2021 Set 1 = 3,350 psi Set 1 = 3,500 psi Set 1 = 3,620 psi 56 day break 09/22/2021 3 7/30/2021 Footings Set # 1 :Column line/Row: D.3/c116 Set # 2 Columm line / Row c5/H Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% N Marguerite EOR to Advise 28 day break 08/27/2021 Set 1 = 3,070 psi Set 1 = 3,330 psi Set 1 = 3,430 psi Set 2 = 3,330 psi Set 2 = 3,520 psi Set 2 = 3,580 psi 56 day break 09/24/2021 4 8/3/2021 Footings: Elevator pit foundation Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% N Marguerite EOR to Advise 7 day break 08/10/2021 Set 1 = 2,610 psi 28 day break 08/31/2021 Set 1 = 3,170 psi 3 samples remainging to be tested 9/28/2021 5 8/6/2021 Level 1 Wall at Building C and B - E/c2 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% N Marguerite EOR to Advise 7 day break 08/13/2021 Set 1 = 2,980 psi 28 day break 09/3/2021 Set 1 = 3,170 psi 3 samples remainging to be tested 10/1/2021 6 8/6/2021 Level 1 Wall at Building C and B - J.7/b25 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% N Marguerite EOR to Advise 7 day break 08/10/2021 Set 2= 2,390 psi 28 day break 09/3/2021 Set 2 = 3380 psi 3 samples remainging to be tested 10/1/2021 Status: Work-in-Progress Legend: Status: Closed Status: Open TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/09/2021 Client: PMA Date of Sampling: 08/06/2021 Lab Log No.: 15654 Reviewed by: CJ Martens 09/09/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Pg. 1 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 2 Truck #: 56 Design Strength (psi): 3,500 @28 days Ticket#: 31302 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at Building C and B Location when sampled: E/c2 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF): 72 50-90 Slump or Spread (in.): 5.5 4-6 Unit Wt (#cu ft): 144.6 140-150 Air Temperature (ºF): 75 >40 Air Content (%): 5.8 4.5-7.5 Time Sampled: 7:35 AM Aggregate Size (in): 3/4 N/A Batch Time: 6:51 AM Time in Truck: 44 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/10/2021 Technician that received: Test # Age of Test (Days) Date Technician Diameter Length Area (in²) Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/13/2021 4.00 8.00 12.57 Lab 37,510 2,980 psi B 28 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 39,847 3,170 psi Type 2 C 56 10/01/2021 4.00 8.00 12.57 Lab D 56 10/01/2021 4.00 8.00 12.57 Lab E 56 10/01/2021 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH Remarks: All samples tested at Allied Testing Laboratory, Inc, CTL# 207-018; *Low Indication Compressive Strength at 28-Days, Remaining specimens will be held for 56-Days TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/09/2021 Client: PMA Date of Sampling: 08/06/2021 Lab Log No.: 15654 Reviewed by: CJ Martens 09/09/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Pg. 2 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 2 of 2 Truck #: 51 Design Strength (psi): 3,500 @28 days Ticket#: 31527 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at Building C and B Location when sampled: J.7/b25 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF): 72 50-90 Slump or Spread (in.): 6.0 4-6 Unit Wt (#cu ft): 144.1 140-150 Air Temperature (ºF): 75 >40 Air Content (%): 6.3 4.5-7.5 Time Sampled: 9:10 AM Aggregate Size (in): 3/4 N/A Batch Time: 8:21 AM Time in Truck: 49 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/10/2021 Technician that received: Test # Age of Test (Days) Date Technician Diameter Length Area (in²) Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 08/13/2021 CM/ATL 4.00 8.00 12.57 Lab 30,080 2,390 psi B 28 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 42,433 3,380 psi Type 2 C 56 10/01/2021 4.00 8.00 12.57 Lab D 56 10/01/2021 4.00 8.00 12.57 Lab E 56 10/01/2021 4.00 8.00 12.57 Lab FAILS TO MEET DESIGN STRENGTH Remarks: All samples tested at Allied Testing Laboratory, Inc, CTL# 207-018 TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/09/2021 Client: PMA Date of Sampling: 08/27/2021 Lab Log No.: 15922 (3058-3059) Reviewed by: CJ Martens 09/09/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Pg. 1 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite Set: 1 of 2 Truck #: 53 Design Strength (psi): 3,500 @28 days Ticket#: 31557 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at Wall: B23/H.8-K, b15-23/K, H.8-K/b15, b26-33/S.1 Foundation: b.3-b.1/K, K-S/a2, arch Location when sampled: P.4/b32 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.7 140-150 Air Temperature (ºF): 84 >40 Air Content (%): 5.5 4.5-7.5 Time Sampled: 7:50 AM Aggregate Size (in): 3/4 N/A Batch Time: 6:53 AM Time in Truck: 57 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/30/2021 Technician that received: James Descoteaux Test # Age of Test (Days) Date Technician Diameter Length Area (in²) Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 35,867 2,850 psi Type 2 B 28 09/24/2021 4.00 8.00 12.57 Lab C 28 09/24/2021 4.00 8.00 12.57 Lab D 28 09/24/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Field Number: 10 Laboratory Compression Test (4x8) Project Name: Dennis Yarmouth Middle School Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/09/2021 Client: PMA Date of Sampling: 08/27/2021 Lab Log No.: 15922 (3058-3059) Reviewed by: CJ Martens 09/09/2021 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Pg. 2 of 2 Information provided by Field Technician Mix #: 3500D Supplier: Cape Cod Ready Mix Contractor: Marguerite Set: 2 of 2 Truck #: 53 Design Strength (psi): 3,500 @28 days Ticket#: 31563 Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical Concrete Specimens (4x8)Type of Structure: Wall Location: Onsite Location for overall pour: Level 1 Wall at Wall: B23/H.8-K, b15-23/K, H.8-K/b15, b26-33/S.1 Foundation: b.3-b.1/K, K-S/a2, arch Location when sampled: K/b2 Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment Mix Temperature (ºF): 72 50-90 Slump or Spread (in.): 5.0 4-6 Unit Wt (#cu ft): 144.3 140-150 Air Temperature (ºF): 84 >40 Air Content (%): 5.7 4.5-7.5 Time Sampled: 9:50 AM Aggregate Size (in): 3/4 N/A Batch Time: 9:09 AM Time in Truck: 41 minutes <90 Mins Information supplied by Laboratory Technician Date Received: 08/30/2021 Technician that received: James Descoteaux Test # Age of Test (Days) Date Technician Diameter Length Area (in²) Cure Loc Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture A 7 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 36,878 2,930 psi Type 2 B 28 09/24/2021 4.00 8.00 12.57 Lab C 28 09/24/2021 4.00 8.00 12.57 Lab D 28 09/24/2021 4.00 8.00 12.57 Lab E H H 4.00 8.00 12.57 Lab Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Soils Test Report Project Name: Dennis Yarmouth Middle School Place of Sampling : onsite Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/09/2021 Client: PMA Date of Sampling: 09/01/2021 Lab Log No.: 16047 (S794) Reviewed by: Henry Soares 09/09/2021 Date ASTM Standards Used: Unless otherwise noted ASTM D-1557, C-136, D4318, D2216, D1140,Method-C Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Pg. 1 of 1 Max Density 126.4 pcf @ 7.7% As Received Moisture 10.5% Source RBO Color Brown Description Crushed Concrete Specific Gravity 2.7 Estimated Date Received: 09/01/2021 Date Tested: 09/08/2021 Tested by: Henry Soares Desc of Rammer: Mechanical Material: Crushed Concrete Preparation Method: Moist Oversized Material: Percent of: 9.16 ;Specific Gravity: 2.7;Percent Moisture: 7.82 Remarks: Received Sample Condition: Acceptable and/or Satisfactory TESTING INSPECTION ENGINEERING Sieve Analysis of Combined Fine and Coarse Aggregates (Wash Included) Project Name: Dennis Yarmouth Middle School Place of Sampling : onsite Permit No.: Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/10/2021 Client: PMA Date of Sampling: 09/01/2021 Lab Log No.: 16047 (S794) Material: Crushed Concrete Specific Gravity: Estimated Source: On Site Stockpile Max Particle Size: Test Performed By: Max Nabulsi Date Tested: 09/08/2021 Reviewed by: Henry Soares 09/10/2021 Date ASTM Standards Used: ASTM C-136 or D-422 (if required D-226/11.1) Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Pg. 1 of 1 Sieve Designation Sieve Size Cumulative % Cumulative %Low HiRetained Passing 3 in 3 in 75 mm 0 100 '' '' 2 in 2 in 50 mm 0 100 '' '' 1 1/2 in 1.5 in 37.5 mm 4 96 '' '' 1 in 1 in 25 mm 6 94 '' '' 3/4 in 0.75 in 19 mm 8.8 91.2 '' '' 1/2 in 0.5 in 12.5 mm 13.5 86.5 '' '' 3/8 in 0.375 in 9.5 mm 16.6 83.4 '' '' No. 4 0.187 in 4.75 mm 22.9 77.1 '' '' No. 8 0.0937 in 2.36 mm 26.6 73.5 '' '' No. 10 0.0787 in 2 mm 27.6 72.4 '' '' No. 16 0.0469 in 1.18 mm 32.8 67.2 '' '' No. 30 0.0234 in 600 μm 48.6 51.4 '' '' No. 40 0.0165 in 425 μm 59.7 40.3 '' '' No. 50 0.0117 in 300 μm 70.6 29.4 '' '' No. 100 0.0059 in 150 μm 85.2 14.8 '' '' No. 200 0.0029 in 75 μm 90.7 9.3 '' '' Remarks: Received Sample Condition: Acceptable and/or Satisfactory