HomeMy WebLinkAboutCorrespondence 8.23.2021
Grant, Kelly
From:Mark Burgess <shorefrontconsulting@gmail.com>
Sent:Monday, August 23, 2021 12:03 PM
To:Grant, Kelly
Cc:paul butler; David McCarthy; David McCarthy
Subject:Estimated start date and proposed field change for Mr. McCarthy's project at 110
River Street
Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure
this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete
this email.
Hi Kelly;
Lemco will be starting this bulkhead project some time in October, and will notify you a week prior for a pre-
construction meeting.
Mr. McCarthy would like to keep his old piles; the design plan called for the replacement of the bulkhead and removal of
the existing piles with a design that doesn't require the piles.
However, he wants to keep them for cosmetic reasons; they will remain in the soil as-is, and will be bolted to the new
wall.
So, a little less soil disturbance and no holes in front of the new wall.
They are not structural, and will just be bolted to the new anchor wales for looks only.
Regards,
--
Mark Burgess
Shorefront Consulting
B.S. Ocean Engineering
"If You Want A Dock, We Have To Talk"
"Engineers get to work when they say it can’t be done….."
290 Center Street, Dennis Port, MA 02639
Phone: 508-280-8046
Email: shorefrontconsulting@gmail.com
Web: www.shorefrontconsulting.com
Facebook: Shorefront Consulting
I build my business on referrals.
If you know anyone who can benefit from my services, please let me know.
1