Please accept this Request for a Certificate of Compliance on behalf of our Client, Chris
Douglass for the project authorized in the Order of Conditions (DEP File #SE 83-2176)
for the completed work at 123 Standish Way in West Yarmouth (the Site). The approved
project consisted the raze and replace of an existing single-family dwelling to include
appurtenances and a native planting area.
On September 15, 2021, BSC conducted an inspection to confirm the current condition of
the site. All work associated with the single-family dwelling and site work were found to
be in significant compliance with the Order of Conditions (OOC), DEP File #SE83-2176,
issued on 11/20/2018.
Enclosed please find the following information:
1. Town of Yarmouth Checklist for Requesting a Certificate of Compliance
2. WPA Form 8A - Request for Certificate of Compliance Form
3. Site Photos
4. OOC SE 83-2176
Please review this Request for a Certificate of Compliance documenting compliance with
the Order of Conditions and inform me if you have any questions or require additional
information at (508) 778 - 8919.
Sincerely,
BSC GROUP, INC.
Hannah Raddatz
Wetland Scientist
cc: Christopher Douglas, 1819 Trapelo Road, Waltham, MA, 02451
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231
Administrative Checklist
Certificate of Compliance
General Information:
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule
Failure to follow the Administrative Checklist guidelines shall result in an Administrative
Incomplete Application and will not be advertised for a Public Hearing.
Contact the office if you need assistance. We will be happy to help guide you through the process.
Submitting an Application:
______ 1 original application with original signatures
______ 1 pdf of application, plan/sketch, and other supporting information emailed
to kgrant@yarmouth.ma.us
______ Statement from Engineer or stamped As-Built plan, refer to 310 CMR 10.05(9)(d)
______ Local filing fee – Refer to fee schedule, Check payable to “Town of Yarmouth”
DEPARTMENT
OF
CONSERVATION
x
x
x
x
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE83-2176
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Christopher Douglass
Name
1819 Trapelo Road
Mailing Address
Waltham
City/Town
MA
State
02451
Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Christopher Douglass
Applicant
11/20/2018
Dated
SE 83-2176
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
123 Standish Way
Street Address
West Yarmouth
City/Town
21
Assessors Map/Plat Number
52
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
31977
Book
59
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE83-2176
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
Photo 1: View of the single-family dwelling at 123 Standish Way. Looking south.
Photo 2:View of the single-family dwelling at 123 Standish Way. Looking northwest
Site Photographs
123 Standish Way
West Yarmouth, MA 02673
9/15/2021
Page 1
Photo 3: View of native planting area located within the northwestern portion of the lot.
Looking west
Photo 4:View of native planting area located within the northwestern portion of the lot.
Looking west
Site Photographs
123 Standish Way
West Yarmouth, MA 02673
9/15/2021
Page 2
Photo 5: View of downspout into rain garden.
Photo 6:View of trench drain and downspouts.