HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2021-09-17Summary Report #16
September 20, 2021
Job No: 5951
Job Name:Dennis Yarmouth Middle School
296 Station Ave
South Yarmouth, MA 02664
Application No.:
TESTING
INSPECTION
ENGINEERING
SW
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
September 13, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
September 14, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
September 15, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
September 16, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
TESTING
INSPECTION
ENGINEERING
SW
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
workmanship.
September 17, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Joe Francisco
Field Supervisor
09-24-2021
Date
Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com)
Administrative Contact: Gina Salerno (gsalerno@fenaghengineering.com)
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
September 13, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 74°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-13-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s
foot, Dozer. No samples taken.
Density Std (DS):
2524
Moisture Std (MS):
473
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Building B
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep’s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 J/b29 6 -3 TOW 1 110.3 4.8 95 Pass
2 J/b30 6 -2 TOW 1 110.7 4.1 96 Pass
3 K.8/b33 6 -2 TOW 1 111.2 4.5 96 Pass
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
September 13, 2021
Time In: 11:00 Time Out: 12:00
Weather: Sunny
Temperature: 74°F
Permit No. :
Plans Dated: 06/18/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-13-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 footings at
Building B and A. Work complete. Reference detail R012. Spread Footings P.7/a24,a27,a29 Footings Q/a24-b26.
Reinforcing Steel and Anchor Bolts
YN YN
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
September 14, 2021
Time In: 07:00 Time Out: 08:00
Weather: Sunny
Temperature: 76°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-14-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, footings at P.7/a24, a27, a29// Q/a24-b26 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to
6 in., specified air content from 4.5% to 7.5%, and 17 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit.
Prepared 4x8" cylinder test specimens sampled from Concrete truck.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor
Ticket
No.
1 5.25 72 76 5.2 144.5 73 P.7/a27 5 6:57 AM 7:21 AM Marguerite
3173
9
5 Total
Additional Notes: Spread Footings rnP.7/a24,a27,a29rnFootings rnQ/a24-b26
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
September 14, 2021
Time In: 08:00 Time Out: 15:00
Weather: Sunny
Temperature: 76°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-14-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s
foot, Dozer. No samples taken.
Density Std (DS):
2524
Moisture Std (MS):
473
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
General Location of Fill:
Building A
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep’s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth
(in)
Test
Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density
(lbs/cu. ft.)
Test
Moisture (%)
Compaction
(95%)
(%)
Comments
1 Roadway west of
building A 6 22 1 110.9 5.2 96 Pass
2 Roadway west of
building A 6 22 1 111.3 4.9 96 Pass
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
September 14, 2021
Time In: 11:00 Time Out: 12:00
Weather: Sunny
Temperature: 76°F
Permit No. :
Plans Dated: 06/18/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-14-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 wall(s) at
Building B . Work complete. Reference detail R012. Wall: Elevator pit (Area B part A), N.4-L/a1 Pier: L/b21, [N.4/a23, a22,
a26, a28, a30], (b2/M.9, L.9, K.8).
Reinforcing Steel and Anchor Bolts
YN YN
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
September 15, 2021
Time In: 07:00 Time Out: 09:00
Weather: Sunny
Temperature: 75°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-15-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, wall(s) at Elevator pit (Area B part A), N.4-L/a1, L/b21, [N.4/a23, a22, a26, a28, a30], (b2/M.9, L.9, K.8) (mix no. 3500D,
design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 44 cubic yards
placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from Concrete
truck.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air
Temp.
(°F)
Air Content
(%)
Unit
Weight
(pcf)
Truck
No.Location Qty. of
Samples
Batch
Time Sample Time Subcontractor
Ticket
No.
1 5.75 70 75 5.7 144.2 73 Elevator pit 5 7:03 AM 7:34 AM Marguerite
3175
8
5 Total
Additional Notes: Wall: Elevator pit (Area B part A), N.4-L/a1rnPier: L/b21, [N.4/a23, a22, a26, a28, a30], (b2/M.9, L.9, K.8)
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
September 15, 2021
Time In: 09:00 Time Out: 15:00
Weather: Sunny
Temperature: 75°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-15-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s
foot, Dozer. No samples taken.
Density Std (DS):
2521
Moisture Std (MS):
472
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
General Location of Fill:
Building B exterior
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep’s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 N.7/b33 6 -3 TOW 1 110.4 5.3 95 Pass
2 P.6/b31 6 -2 TOW 1 110.8 3.9 96 Pass
3 P.4/b32 6 -1 TOW 1 109.9 4.6 95 Pass
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
September 16, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 76°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-16-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s
foot, Dozer. No samples taken.
Density Std (DS):
2515
Moisture Std (MS):
478
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Building B
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep’s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
RBO Crushed concrete 1 S794 126.4 7.7
Test# Test Location
Probe
Depth (in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 J/b30 6 -4 TOW 1 120.0 5.0 95 Pass
2 J/b28 6 -2 TOW 1 120.9 5.4 96 Pass
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
September 17, 2021
Time In: 07:00 Time Out: 09:00
Weather: Sunny
Temperature: 73°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-17-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, wall(s) at a24,27, 29/P.7; a24-b26/Q (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in.,
specified air content from 4.5% to 7.5%, and 19 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit.
Prepared 4x8" cylinder test specimens sampled from Concrete truck.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor
Ticket
No.
1 4.0 68 75 4.8 144.5 68 Q/a24 5 7:20 AM 7:53 AM Marguerite
3178
3
5 Total
Additional Notes: Piers: a24,27, 29/P.7rnWall: a24-b26/Q
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
September 17, 2021
Time In: 08:00 Time Out: 15:00
Weather: Sunny
Temperature: 73°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
09-17-2021
Date Joe Francisco
Field Supervisor
09-20-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s
foot, Dozer. No samples taken.
Density Std (DS):
2515
Moisture Std (MS):
475
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Building B
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep’s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
RBO Crushed concrete 1 S794 126.4 7.7
Test# Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 P/b29 6 -2 TOW 1 120.5 4.3 95 Pass
2 P/b29 6 -1 TOW 1 120.3 4.6 95 Pass
3 J.7/b30 6 -4 TOW 1 121.2 4.8 96 Pass
4 L/b24 6 -2 TOW 1 121.6 4.4 96 Pass
NCR ID#Date Location Inspector Issue RFI/ Submittal
No.Resolved? (Y/N)Sub/ Contractor Date Resolved Comment
1 7/21/2021 Wall : C /d3 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
N Marguerite
EOR to Advise
7 day break 08/10/2021
Set 1 = 1,860 psi
28 day break 08/31/2021
Set 1 = 2,800 psi
Set 1 = 2,900 psi
Set 1 = 3,480 psi
No Samples Remaining
2 7/28/2021 Footing : C16/E Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
N Marguerite
EOR to Advise
28 day break 08/31/2021
Set 1 = 3,350 psi
Set 1 = 3,500 psi
Set 1 = 3,620 psi
56 day break 09/22/2021
3 7/30/2021
Footings Set # 1
:Column line/Row:
D.3/c116 Set # 2
Columm line / Row
c5/H
Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
N Marguerite
EOR to Advise
28 day break 08/27/2021
Set 1 = 3,070 psi
Set 1 = 3,330 psi
Set 1 = 3,430 psi
Set 2 = 3,330 psi
Set 2 = 3,520 psi
Set 2 = 3,580 psi
56 day break 09/24/2021
4 8/3/2021 Footings: Elevator pit
foundation Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
N Marguerite
EOR to Advise
7 day break 08/10/2021
Set 1 = 2,610 psi
28 day break 08/31/2021
Set 1 = 3,170 psi
3 samples remainging to be tested
9/28/2021
5 8/6/2021 Level 1 Wall at
Building C and B - E/c2 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
N Marguerite
EOR to Advise
7 day break 08/13/2021
Set 1 = 2,980 psi
28 day break 09/3/2021
Set 1 = 3,170 psi
3 samples remainging to be tested
10/1/2021
6 8/6/2021 Level 1 Wall at Building
C and B - J.7/b25 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
N Marguerite
EOR to Advise
7 day break 08/10/2021
Set 2= 2,390 psi
28 day break 09/3/2021
Set 2 = 3380 psi
3 samples remainging to be tested
10/1/2021
Status: Work-in-Progress
Legend:
Status: Closed
Status: Open
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 08/10/2021 Lab Log No.: 15795
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 73
Design Strength (psi): 3,500 @28
days Ticket#: 31339
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Building C and B
Location when sampled: C18/E
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 71 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.7 140-150
Air Temperature (ºF): 70 >40 Air Content (%): 5.7 4.5-7.5 Time Sampled: 7:45 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:00 AM Time in Truck: 45 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 08/11/2021 Technician that received: John Lydstone
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 08/17/2021 Max Nabulsi 4.00 8.00 12.57 Lab 37,275 2,970 psi Type 5
B 28 09/07/2021 Henry Soares 4.00 8.00 12.57 Lab 42,705 3,400 psi Type 2
C 56 10/05/2021 4.00 8.00 12.57 Lab
D 56 10/05/2021 4.00 8.00 12.57 Lab
E 56 10/05/2021 4.00 8.00 12.57 Lab
FAILS TO MEET DESIGN STRENGTH
Remarks: Received Sample Condition: Acceptable and/or Satisfactory. Low 28-Day Indication Compression Test; Specimens C-E
will be held for 56-Days
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 08/17/2021 Lab Log No.: 15811 (2947)
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 55
Design Strength (psi): 3,500 @28
days Ticket#: 21627
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at b30-b27/S.1, P-S.1/b27
Location when sampled: S.1/b27
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.5 4-6 Unit Wt (#cu ft): 144.8 140-150
Air Temperature (ºF): 78 >40 Air Content (%): 6.7 4.5-7.5 Time Sampled: 10:04 AM
Aggregate Size (in): 3/4 N/A Batch Time: 9:13 AM Time in Truck: 51 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 08/18/2021 Technician that received: John Lydstone
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 08/24/2021 Henry Soares 4.00 8.00 12.57 Lab 31,558 2,510 psi Type 3
B 28 09/14/2021 Henry Soares 4.00 8.00 12.57 Lab 43,101 3,430 psi Type 2
C 28 09/14/2021 Henry Soares 4.00 8.00 12.57 Lab 41,184 3,280 psi Type 2
D 56 10/12/2021 4.00 8.00 12.57 Lab
E 56 10/12/2021 4.00 8.00 12.57 Lab
FAILS TO MEET DESIGN STRENGTH
28 Day Avg.:3,360 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory; Low 28-Day Indication compression test results;
Specimens D & E will be held for 56-Days
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 08/18/2021 Lab Log No.: 15817 (2975)
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 72
Design Strength (psi): 3,500 @28
days Ticket#: 31461
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at J.3-J.7/b31, b23-33/J.7, J.7-N/b33, J.3-K.3/b23
Location when sampled: K/b17
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 69 50-90 Slump or Spread (in.): 5.0 4-6 Unit Wt (#cu ft): 144.3 140-150
Air Temperature (ºF): 78 >40 Air Content (%): 5.4 4.5-7.5 Time Sampled: 7:40 AM
Aggregate Size (in): 3/4 N/A Batch Time: 6:58 AM Time in Truck: 42 minutes
Information supplied by Laboratory Technician
Date Received: 08/19/2021 Technician that received: John Lydstone
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 08/25/2021 James Descoteaux 4.00 8.00 12.57 Lab 38,125 3,030 psi Type 3
B 28 09/15/2021 Henry Soares 4.00 8.00 12.57 Lab 45,952 3,660 psi Type 2
C 28 09/15/2021 Henry Soares 4.00 8.00 12.57 Lab 47,506 3,780 psi Type 2
D 28 09/15/2021 Henry Soares 4.00 8.00 12.57 Lab 47,100 3,750 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:3,730 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 09/01/2021 Lab Log No.: 16008 (3099-3100)
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 2 Truck #: 52
Design Strength (psi): 3,500 @28
days Ticket#: 169841
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Wall: b3-12.3/K, H-K/b15 Footings: a6/U, auditorium seatings
Location when sampled: K/b3
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.5 4-6 Unit Wt (#cu ft): 144.1 140-150
Air Temperature (ºF): 73 >40 Air Content (%): 6.2 4.5-7.5 Time Sampled: 10:12 AM
Aggregate Size (in): 3/4 N/A Batch Time: 9:33 AM Time in Truck: 39 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/02/2021 Technician that received: James Descoteaux
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/08/2021 Henry Soares 4.00 8.00 12.57 Lab 40,750 3,240 psi Type 5
B 28 09/29/2021 4.00 8.00 12.57 Lab
C 28 09/29/2021 4.00 8.00 12.57 Lab
D 28 09/29/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 09/01/2021 Lab Log No.: 16008 (3099-3100)
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Ready Mix Contractor: Marguerite
Set: 2 of 2 Truck #: 55
Design Strength (psi): 3,500 @28
days Ticket#: 21730
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Wall: b3-12.3/K, H-K/b15 Footings: a6/U, auditorium seatings
Location when sampled: U/a6
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.6 140-150
Air Temperature (ºF): 73 >40 Air Content (%): 5.9 4.5-7.5 Time Sampled: 11:10 AM
Aggregate Size (in): 3/4 N/A Batch Time: 10:26 AM Time in Truck: 44 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/02/2021 Technician that received: James Descoeaux
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/08/2021 Henry Soares 4.00 8.00 12.57 Lab 36,802 2,930 psi Type 5
B 28 09/29/2021 4.00 8.00 12.57 Lab
C 28 09/29/2021 4.00 8.00 12.57 Lab
D 28 09/29/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 09/03/2021 Lab Log No.: 16067 (3123)
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 62
Design Strength (psi): 3,500 @28
days Ticket#: 21747
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Wall: T-W/a1, a1-8/W Spread footings: V/a4, U/a5, a6/V, a5/V.5, V and V.5/a8
Location when sampled: U/a5
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.7 140-150
Air Temperature (ºF): 82 >40 Air Content (%): 6.1 4.5-7.5 Time Sampled: 7:47 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:07 AM Time in Truck: 40 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/08/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/10/2021 Henry Soares 4.00 8.00 12.57 Lab 25,815 2,050 psi Type 5
B 28 10/01/2021 4.00 8.00 12.57 Lab
C 28 10/01/2021 4.00 8.00 12.57 Lab
D 28 10/01/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory; Low 7-Day Indication test result
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 09/07/2021 Lab Log No.: 16080 (3124)
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 58
Design Strength (psi): 3,500 @28
days Ticket#: 21756
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at L/b15-20, M.5/b17-21
Location when sampled: L/b15
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 69 50-90 Slump or Spread (in.): 5.25 4-6 Unit Wt (#cu ft): 144.3 140-150
Air Temperature (ºF): 75 >40 Air Content (%): 6.0 4.5-7.5 Time Sampled: 7:55 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:22 AM Time in Truck: 33 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/10/2021 Technician that received: Max Nabulsi
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/14/2021 Henry Soares 4.00 8.00 12.57 Lab 34,457 2,740 psi Type 2
B 28 10/05/2021 4.00 8.00 12.57 Lab
C 28 10/05/2021 4.00 8.00 12.57 Lab
D 28 10/05/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/16/2021
Client: PMA
Date of Sampling: 09/09/2021 Lab Log No.: 16132 (3175)
Reviewed by: CJ Martens
09/16/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 58
Design Strength (psi): 3,500 @28
days Ticket#: 21775
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at L/b15-20, M.5/b17-21, N.5/a23-30
Location when sampled: M.5/b17
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 68 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.9 140-150
Air Temperature (ºF): 74 >40 Air Content (%): 5.7 4.5-7.5 Time Sampled: 7:43 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:04 AM Time in Truck: 39 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/15/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/16/2021 Henry Soares 4.00 8.00 12.57 Lab 30,168 2,400 psi Type 5
B 28 10/07/2021 4.00 8.00 12.57 Lab
C 28 10/07/2021 4.00 8.00 12.57 Lab
D 28 10/07/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/23/2021
Client: PMA
Date of Sampling: 08/13/2021 Lab Log No.: 15745 (2945-2946)
Reviewed by: CJ Martens
09/23/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 2 Truck #: 68
Design Strength (psi): 3,500 @28
days Ticket#: 31410
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at Building B
Location when sampled: P.1/b33
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 72 50-90 Slump or Spread (in.): 5.25 4-6 Unit Wt (#cu ft): 144.5 140-150
Air Temperature (ºF): 80 >40 Air Content (%): 5.0 4.5-7.5 Time Sampled: 7:38 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:00 AM Time in Truck: 38 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 08/18/2021 Technician that received: John Lydstone
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 17 08/30/2021 Max Nabulsi 4.00 8.00 12.57 Lab 38,847 3,090 psi Type 2
B 28 09/10/2021 Alex Dzengeleski 4.00 8.00 12.57 Lab 44,171 3,510 psi Type 2
C 28 09/10/2021 Alex Dzengeleski 4.00 8.00 12.57 Lab 43,490 3,460 psi Type 2
D 56 10/08/2021 4.00 8.00 12.57 Lab
E 56 10/08/2021 4.00 8.00 12.57 Lab
FAILS TO MEET DESIGN STRENGTH
28 Day Avg.:3,490 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory. Low 28-Day indication compression tests; Specimens D &
E will be held for 56-Days.
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 09/23/2021
Client: PMA
Date of Sampling: 08/13/2021 Lab Log No.: 15745 (2945-2946)
Reviewed by: CJ Martens
09/23/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape cod Ready Mix Contractor: Marguerite
Set: 2 of 2 Truck #: 68
Design Strength (psi): 3,500 @28
days Ticket#: 31416
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at Building B
Location when sampled: J.3/b24
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 69 50-90 Slump or Spread (in.): 6.0 4-6 Unit Wt (#cu ft): 144.0 140-150
Air Temperature (ºF): 80 >40 Air Content (%): 5.5 4.5-7.5 Time Sampled: 9:50 AM
Aggregate Size (in): 3/4 N/A Batch Time: 9:00 AM Time in Truck: 50 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 08/18/2021 Technician that received: John Lydstone
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 08/20/2021 Max Nabulsi 4.00 8.00 12.57 Lab 29,191 2,320 psi Type 2
B 28 09/10/2021 Alex Dzengeleski 4.00 8.00 12.57 Lab 35,742 2,840 psi Type 2
C 56 10/08/2021 4.00 8.00 12.57 Lab
D 56 10/08/2021 4.00 8.00 12.57 Lab
E 56 10/08/2021 4.00 8.00 12.57 Lab
FAILS TO MEET DESIGN STRENGTH
28 Day Avg.:2,840 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory; Low 28-Day indication compression test; Specimens C-E
will be held for 56-Days