HomeMy WebLinkAboutCOC requestj,
1���JI`1 �A]ED� ICI�T�GItI`�IEIERI[I`��, III`�1�e
939 Main Street
Yarmouth Port, MA 02675
508-3624541
DCE Job # 18-230
Date: September 14, 2021
To: Kelly Grant, Conservation Administrator
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
From: Priscilla Leclerc
Subject: SE83-2292 Aubin, 117 Pawkannawkut Drive, South Yarmouth
Delivered.
Enclosed is a Request for a Certificate of Compliance fox SE83-2292 John Aubin, Jr.,
117 Pawkannawkut Drive, South Yarmouth, and the $75.00 fee check.
Please feel free to call if you have any questions.
DOWN CAPE ENGINEERING, INC.
939 MAIN ST, SUITE C
YARMOUTH PORT, MA 02675
PHONE: 508-3 62-4541
FAX: 508-362-9880
prisciUa@downcape.com
DEPARTMENT
OF
CONSERVATION
C' cad .�n�cvunc�tia4t:
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule
Failure to follow the Administrative Checklist guidelines shall result in an Adininistr•ative
Incomplete Application and will not be advertised for a Public Hearing.
Contact the office if you need assistance. We will be happy to help guide you through the pI•ocess.
Su�nutii,�u,� a� CLpp�;catia.�t:
1 original application with original signatures
1 pdf of application, plan/sketch, and other• supporting information emailed
to kgrant@yarmouth.ma.us
V'�Statement from Engineer or stamped As -Built plan, refer to 310 CMR 1 O.OS(9)(d)
Local filing fee —Refer to fee schedule, Checic payable to "Town of Yarmouth"
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (S08)-398-2231 Ext. 1288 •Fax (S08)-398-0836 • TTD# (S08) 398-2231
Massachusetts Department of Environmental Protecti
Mon
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8A — Request for Certificate of Compliance se83-2292
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chanter 143
A. Project Information
Important:
When filling out 1. This request is being made by:
forms to the i I /) �. ,EA W J L
computer, use e tab Name ¢'—�(`—f-�1�!-!�T4
keytomove t' O 1��.+�� I,0&
Y
your cursor - Ma I niiMa g Address
do not use the ��L/{]�
return key. City/Town State Zip Co OZ61
ray Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
OIl 11,0� lN,J f
Applicant
Dated DEP File Number
Upon completion
of the work 3. The project site is located at: f ��� y
authorized in � fM X N-�—�1 P OF M 15 01)T '� VAIL O VIH
C Orders, Street Address' i� ��
Conditions, the City/Town
property owner
must request a Assessors Map/Plat Number Parcel/Lot Number
Certificate of Registry 4. The final Order of Conditions was recorded at the Re Compliance g� ry of Deeds for:
from the issuing Cd5
authority stating Prope y Owner (if different)
that
port the work or
onnAruN!q�� ,
ion of the c
work has been County Book Page-6—
satisfactorily
completed. Certificate (if registered land)
5. This request is for certification that (check one):
Li the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaformea.doc ••rev. 5/29/14
Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8A — Request for Certificate of Compliance se83-2292
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
M Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www,mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional office
for -your -city -or -town. html).
wpaform8a.doc ••rev. 5/29/14 Page 2 of 2
939 main street rite. 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
September 30, 2021
Kelly Grant, Conservation Administrator
Conservation Commission
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
tel. 08),51324541
fax (508) 36M880
)anielA. Ojala, P.E., P.L.S.
>rne H. Ojala, P.E., P.L.S.
)aniel E. Gonsalves, P.E., S.E.
:raig J. Ferrari, E.I.T., S.E.
Regards: Request for Certificate of Compliance: Order from Enforcement Order
SE#83-2292 John Aubin, 117 Pawkannawkut Drive, West Yarmouth
Dear Commission Members and Administrator Kelly Grant:
On September 10, 2021, the Commission issued an Order of Conditions for John
Aubin, 117 Pawkannawkut Drive, West Yarmouth, There were minor modifications
to the bulkhead including removal of sediment from the waterway and a wider
bulkhead cap which were offset by additional landscape plantings as discussed in the
Enforcement Order and September 2, 2021, Public Hearing. The Aubin site, to the
best of my knowledge and belief, is in substantial compliance with both outstanding
Orders of Conditions.
We respectfully request the issuance of the Certificate of Compliance for SE#83-2292
at this time. A separate request was made for SE#83-2196. Thank you for your
consideration.
Sincerely,
I A rt�Q
I
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
. did
Pt A
did
did
Zitwi
. \
low, 6
I dill
kidOr
�.
R l E�;i v _ _.`
did
Urm did; m RP
IN I alp
did
41
Oil
I do
did
40,
J API ' • _ /' p 1 _ a r `;. r YI
— — did
Im
.. -
46
did
did
dillI did
"b did _7122/2�21 1Q 11
-
APO
r•- - - .. tic r1` _ ` . .A - �I -._
'a,Y• , !'r y�7,,,�_ a
Am AqpA
t v+5r/ r or
�uu�+vo
A k4w se s.
rvankarMe �
me Am
�r'' \ M
-..�J.er
r r_
IN se
Am A
/.. t —may �., .. _ "`).1 VIA Am ^a.mess- sp.
ss
` t - - .
"Am esse
"`�" AV I me
�4
VIAVs_ ft
jor
- —
�� —
zlf
mm
Ism Asm'Ar.
see OOOF r. Fps
m me
Par -s
rr Is
i
f�t4ii'. .. =Mgt%r.
revs res'
.� Its, VON
,,ice � ` .
AV
goods
' r_Ass
Is
V seem
Fair
oe
Am
i
of
yOF
live 6
Wks
AM
_ _
AV
�. tr
'-1 a �sm, me `zIn ! �ll`
AV st%' ="
- = � -JAss r
ss
:a
>
r, Jw- ,
�2.0i21_ .\1-2
,fIN
ook" t
I Cam• .
F4 �Liii = � - Jr .I, f ,. •`x`.�� 'i j�-l.' •4 r�I.•J•- '.�yy ti r4 �` OFF_:.v ,. T
Ism Asm'Ar.
see OOOF r. Fps
m me
Par -s
rr Is
i
f�t4ii'. .. =Mgt%r.
revs res'
.� Its, VON
,,ice � ` .
AV
goods
' r_Ass
Is
V seem
Fair
oe
Am
i
of
yOF
live 6
Wks
AM
_ _
AV
�. tr
'-1 a �sm, me `zIn ! �ll`
AV st%' ="
- = � -JAss r
ss
:a
>
r, Jw- ,
�2.0i21_ .\1-2
,fIN
ook" t
I Cam• .
F4 �Liii = � - Jr .I, f ,. •`x`.�� 'i j�-l.' •4 r�I.•J•- '.�yy ti r4 �` OFF_:.v ,. T
"._
at
Dig
Is
�.
stoats
_-�
�':=".
^C.
aro' Mass
Was
F seats
?i -
�_af+r+fT _ riles