Loading...
HomeMy WebLinkAbouttitle 5 site plan rev 9.10.2021LEGEND "" G/�IJIIIVV l.11IVIVVR X 99 EXIST. SPOT ELEV. -[99]- PROPOSED CONTOUR 198.4] PROPOSED SPOT EL. TH 1 TEST HOLE 25. 21 SLOPE OF GROUND UTILITY POLE YC FIRE HYDRANT NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRANIING AND BICE # > 6-2U U 20.43' =*21.9'± ZABEL FILTER (A100) OUTLET TEE W/EXTENSION FNDN. EL.= 29.5' --- Inn.0' PRECAST TO GRADE 23.0' PRECAST H-10 2" PRESSURE LINE RISERS (TYP.) SLOPE TO DRAIN BACK 20 20.68, FLOAT SWITCH SETTINGS: T ALARM ON 0000, PUMP ON ° ° ° 6" 5 5" WORKING RANGE 24.27' 12" PUMP OFF WEEP HOLES 6" CRUSHED STONE OR M CHECK VALVE COMPACTION. (15.221 [2]) _1161SE-141 Z 6" BAFFLE MYERS SRM 4 6" CRUSHED STONE OR MECHANICAL SUBMERSIBLE 4/10 HP PUMP COMPACTION. (15.221 [2]) SYSTEM (OR EQUAL) (fix SLOPE) (ON BLOCK) H-10 FOUNDATION 17' SEPTIC TANK 33' *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM BENCHMARK: CONIC. BOUND =30.3' NAVD88 WI 16 d MAP 137 PARC4� JOCELN DYETT B� DOC 1274 0 J, qF 29 A0 Np�� lyq��R 1 ? .0. ^j \ TO � 8 i LOT 2 12,155± PROP. 2ft STORY ADD *S (WITHIN EX..FOOTPRINT) / EXISTING - ` DWELLING \ \TOF = 29.5 A EX. DECK O AE T \ y <'n c, THE YARMOUTH BOARD OF HEALTH SHALL REQUIRE THE FOLLOWING INSPECTIONS: 1. ENGINEER TO STAKE IN THE FIELD SAS PRIOR TO EXCAVATION. 2. INSPECTION OF UNSUITABLE MATERIAL (IF ANY). 3. VERIFICATION OF CESSPOOL/LEACH PIT REMOVAL OR ABANDONMENT. 4. INSPECTION OF FLOW BARRIER INSTALLATION. 5. INSPECTION OF THE 3/4 - 1 1 /2 INCH STONE PRIOR TO PLACEMENT. 6. FINAL INSPECTION OF ALL COMPONENTS PRIOR TO BACKFILLING. 7. FINAL GRADING INSPECTION. tL \ oyF 315, cp\� \ o� `ZC �� otiF °0' \\� 2� � O 0 O \ I ALARM LIGHT ALARM AND CONTROL PANEL ACCESS FOR ROUTINE MAINTENANCE SYSTEM PROFILE TO BE INSTALLED INSIDE MUST BE PROVIDED FOR ZABEL FILTER. BUILDING. ALARM TO BE ON INSTALLER MUST FOLLOW ALL (NOT To SCALE) SEPARATE CIRCUIT FROM PUMP MANUFACTURER'S SPECIFICATIONS FOR ALL WIRING TO CODE. PROPER FILTER INSTALLATION PROP. WATERTIGHT COVERS TO GRADE PROVIDE QUICK DISCONNECT FOR PUMP 2" PEASTONE OR GEOTEXTILE FILTER FABRIC OVER STONE ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC TAPE OR COMPARABLE MEANS FOR FUTURE LOCATION. CONCRETE COVERS TO WITHIN 3" GRADE VENT W/ CHARCOAL FILTER 2% SLOPE REQUIRED OVER SYSTEM 29.0' 4" OSCH40 PVC BLOCKS OR PIPES LEVEL 1 ST 2' PRECAST RISERS D'BOX 20 w 15 w Z 0 Q 10 w J Q E- 0 ~ 5 MORTAR ALL H-10 _ COMPONENTS , (TYP') ENDS SIDES o°o°o oo�oo . >o°000000 'o°�°� ao�o-�oa a000 ao�o °° oa000�aaaoa o o°o°000 00000000000 o°° �000000000� �ooaoa0000� ;°00000°o °°°°° o°o°000° oaoao�aaoaa o 0 oo°o°o oa�aaooa000 , o a o o 0 0 00 0 0 0 0 0 0 1 L H-20 500 GAL. LEACHING CHAMBER BY ACME PRECAST OR EQUAL. 3/4"-1-1/2" DOUBLE WASHED STONE (2) UNITS REQUIRED OVERALL DIMENSIONS TO OUTSIDE OF STONE: 30' X 9.83' ( 1 X SLOPE) 12' - LEACHING FACILITY 0 _ 25 50 75 100 CAPACITY - GPM PUMP CURVE FOR MYERS SRM4 4/10 HP PUMP UP LIVING ROOM DEN DOWN KITCHEN BATH BEDROOM FIRST FLOOR PLAN (N.T.S.) n�rlt SECOND I-LUUH FLAN (N.T.S.) 17.0' BOTTOM TH-1 NO GROUNDWATER FOUND o' 0' 40 MIL LINER Yarmouth Conservation Conditions: 1. A hard copy of the plan shall be provided to the Conservation Administrator for review. An electronic copy of the final plan shall be provided to kgrant@yarmouth.ma.us. 2. The proposed sewage disposal system shall meet the applicable Title 5 wetlands setbacks as set forth by the Health Department. 3. A "work limit" line shall be established with Erosion Controls (i.e straw bales, staked filter fabric, bark mulch, "silt sacks," products made with rice straw, and other weed -free products or approved by the Commission.) Hay bales are not allowed. It is the applicant's responsibility to implement and maintain appropriate and adequate erosion controls measures throughout the construction process. 4. No work of any kind shall occur on the Resource Area side of the work limit line. This line shall be established prior to any construction or work. 5. All imported fill shall be clean and not contain any foreign debris such as cement, bituminous concrete, rubber, metal, trash, boulders, etc. 6. Debris, including litter, shall be picked up immediately. Any excess material that is excavated from the job site shall be disposed of at a location approved by the Conservation Administrator or in a covered dumpster. No debris shall be allowed in a Wetland or Waterway. 7. Washing of equipment/tools shall be done OFF -SITE or handled in a manner approved by the Conservation Administrator. 8. No equipment shall be refueled, nor shall fuel be stored within 100 feet of a resource area. 9. The cesspool is to be pumped dry, the connection broken, and filled with clean sand. 10. Any area that is disturbed during construction shall be revegetated immediately or as soon after as the growing season commences. Permanent stabilization shall be carried out in order to minimize erosion. NOTES 1. DATUM IS NAVD 88 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1 /8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H-LQ (H-20 LEACHING) 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 5' 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED BENEATH AND 5' AROUND THE PROPOSED LEACHING FACILITY. 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. 13. SEE PROPOSED BUILDING PLANS FOR FLOOR PLAN. 14. INSTALLER TO CONFIRM SUITABILITY OF ELECTRICAL SYSTEM FOR PUMP INSTALLATION. ELECTRICAL PERMIT REQUIRED. VARIANCES REQUESTED: UNDER MAX. FEASIBLE COMPUANCE 15.405: (1a): REDUCTION IN SETBACK, SAS TO LOT LINE (10' TO 3.4') (1b): REDUCTION IN SETBACK, SAS TO FOUNDATION (20' TO 10.0') (1b): SAS TO BE > 3' BUT < 6' BELOW FINISH GRADE (VENT AND H-20 PROVIDED) (1g): REDUCTION IN SETBACK, SAS TO DRAIN WHICH DISCHARGES TO SURFACE WATER SUPPLY (100' TO 650) UNDER TOWN OF YARMOUTH HEALTH REGULATIONS: (3.7): REDUCTION IN SETBACK, SEPTIC TANK TO BVW (50' TO 86') TEST HOLE LOGS ENGINEER: CRAIG J. FERRARI, SE #13871 WITNFC� PHIL RENAUD DATE: 6/30/21 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS 1 ELEV. 099 28.0' A LS 1OYR 3/2 18" B LS 42„ 10YR 5/8 24.5' C PERC MS 2.5Y 7/4 132" I 117.0' NO GROUNDWATER ENCOUNTERED t OF �GFMq`��� \?NIdgSs� it .,yb ` / ��\ Yi Y Cti� Z IIEL A I1 i a i > i_ E� �0'' E S S �� L_CD DATE DANIEL A. OJALA, P.E., P.L.S. o West oth nc on Id Ch a ncle oo Rood �a y c�0 q �c 0 o• LocU 00 Follins<o� - Pond d`• Q �rift� od Errs s P f� T oo o a`o�0 Ter Kelley 's Bay o a LOCUS MAP SCALE 1 "=2000'f ASSESSORS MAP 137 PARCEL 9 LOCUS IS WITHIN FEMA FLOOD ZONE X (AREA OF MINIMAL FLOOD HAZARD) & ZONE AE (EL. 9) AS SHOWN ON COMMUNITY PANEL #25001 CO583J DATED 7/16/2014 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 3 BEDROOMS @ 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A 2500 GAL. SEPTIC TANK P.C. COMBO LEACHING: SIDES: 2 (30 + 9.83) 2 (.74) = 118 GPD BOTTOM 30 X 9.83 (.74) = 218 GPD TOTAL: 454 S.F. 336 GPD USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 2.5' STONE AT SIDES, 4' AT ENDS AND 5' BETWEEN UNITS ZONING SUMMARY ZONING DISTRICT: R-40 DISTRICT REQUIRED: EXISTING: PROPOSED: MIN. LOT SIZE 40,000 S.F. 12,155 S.F.f 12,155 S.F.f MIN. LOT FRONTAGE 150' 213.42' 213.42' MIN. FRONT SETBACK 30' 23.8' 23.8' MIN. SIDE SETBACK 20' 25.2' 25.2' MIN. REAR SETBACK 20' 53.8' 53.8' MAX. BUILDING COVERAGE 25% 7.9% 7.9% TITLE 5 SITE PLAN OF 27 LONGVIEW RD. YARMOUTH PORT, MA ROBERT PREPARED DATE: AUGUST 26, 2021 REV.: SEPTEMBER 10, 2021 (BOH NOTES) Scale:1 "= 20' 0 10 20 30 40 50 FEET off 508-362-4541 I fax 508-362-9880 downcope.com @ down cope engineering, ioc. civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOU THPOR T MA 02675 16-288 KOSSACK.DWG EA W