Loading...
HomeMy WebLinkAboutEngineer Plan -2021N LOCUS KEY: J� EXISTING CONTOUR: - — — - /4I1 PROPOSED CONTOUR: ------------ *9,9 EXISTING SPOT ELEVATION: 25.5 6,q PROPOSED SPOT ELEVATION: 575 90 TEST HOLE: Y ST UTILITY POLE: -o- FENCE LINE: t4j. eG0 HYDRANT:. _ 9�. RETAINING WALL: / \ XZ-Jl 25.0' LOCATION MAP I ff LOT 15 (10,745 SF)ASSESSORSMAP:88 PARCEL:192 PLAN BOOK: 171, PAGE:5 LEACH AREA DETAIL BENCHMARK AT RIGHT CORNER OF BOTTOM BRICK STEP ELEVATION = 104.78 --\ SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAYx 2 DAYS= 660 GAL USE 1500 GALLON SEPTIC TANK aS LEACHING AREA: (2 USE 2 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (25'x 12.8' x 2' EFF. DEPTH) SIDE AREA: (25' + 12.8') x 2 x 2 =151 SF (0.74) =112 GAUDAY BOTTOM AREA: 25'x 12.8' = 320 SF (0.74) =137 GAUDAY CAPACITY= 349 GAUDAY 105 � 104 1 `a .` Edge of lawn d}�� eS O RO 1 lh 1 cd .,. rQ2z6d t4 ° O a� oK 0 1051 24"oak 9 5� �j" 0 O 104 ?�'�`°- A+S q V sg90 jos o �p2 Y y�OQ'41' Sy�O 103 ` 104 P� 4 � � N 103 sr� �� e /L F 1\ ,102 M21-43 103.6 ul BH I� BED 7 ROOM BED ROOM SEPTIC SYSTEM SECTION 1500 GAL ��gg SEPTIC TANK MECCHANIICALLY COR OR M ACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN BATH DINING KITCHEN BATH I AREA BED I ROOM ROOM II D -BOX MECHANICALLY UNDER ELEV. TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, RE WITNESS: PHIL RENAUD DATE: 9-22-21 PERCOLATION RATE: <2 MIWIN 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' EFF. DEPTH) TH-1 104.0 ELEV. O/A HORIZON 2" PEASTONE OR FILTER FABRIC RST FLOOR COVERS WITHIN 6" 103.6 3/4" - 7 112' DOUBLE LOAMYSAND 105.23 OF FINISHED GRADE C HORIZON WASHED STONE 2.5Y 7/6 PERC AT 48" TOP OF ° FOUNDATIONFINISHED GRADE INSPECTION PORT [ ELEV.= 102.78 slightly greater 3.. .V 2.8 1/4 per ft 118"ver ft COVER (1' MIN) PIPES) a 10.,5 7IT TE L 1500 GAL ��gg SEPTIC TANK MECCHANIICALLY COR OR M ACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN BATH DINING KITCHEN BATH I AREA BED I ROOM ROOM II D -BOX MECHANICALLY UNDER ELEV. TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, RE WITNESS: PHIL RENAUD DATE: 9-22-21 PERCOLATION RATE: <2 MIWIN 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' EFF. DEPTH) TH-1 104.0 ELEV. O/A HORIZON LOAMYSAND 10YR 4/1 103.6 B HORIZON LOAMYSAND 10YR5/8 101.5 C HORIZON MEDIUM SAND 2.5Y 7/6 PERC AT 48" NO GROUND WATER ENCOUNTERED EXISTING FLOOR PLAN NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40- 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS.. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE. I t FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.LS., HARWICH, MA. 12. THIS. PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND Yarmouth Health Department APPROVED G�-ghftw-7 Nr°v9f� Cd (lam+ Name Date REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING CESS POOL IS TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 11 '*1P 11 THOMAS J. McLELLAN, P.E. SITE PLAN LOCATION: 60 BUCKWOOD DR., S. YARMOUTH, MA PREPARED FOR: JOHN PESCHIER BASS RIVER ENGINEERING P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048 I" = 20'