Loading...
HomeMy WebLinkAboutLighting COMcheckCOMcheck Software Version 4.1.5.1 Interior Lighting Compliance Certificate Project Title: 780 CMR Massachusetts State Building Code, 9th Edition, Energy Efficiency Project Type:Alteration Construction Site:Owner/Agent:Designer/Contractor: Project Information Energy Code: Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Police 36450 0.87 31712 31712Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Police (36450 sq.ft.) LED 1: A: 2x4: Other:1 82 33 2706 LED 2: B: 2x4: Other:1 62 40 2480 LED 3: C: 2x2: Other:1 79 33 2607 LED 4: C1: 2x2: Other:1 43 30 1290 LED 5: D: Downlight: Other:1 78 9 702 LED 6: D1: Downlight: Other:1 5 9 45 LED 7: D2: Downlight: Other:1 3 9 27 LED 8: E: 4' Surface Mounted: Other:1 14 33 462 LED 9: E1: 4' Wall Mounted: Other:1 5 33 165 LED 10: E2: 4' LED: Other:1 12 38 456 LED 11: G: 4' Corner Mounted: Other:1 16 33 528 LED 12: G1: 1x4 Recessed: Other:1 18 33 594 LED 13: M: 4' Vaporproof: Other:1 9 32 288 LED 14: Z: Pendant: Other:1 2 36 72 12422Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 780 CMR Massachusetts State Building Code, 9th Edition, Energy Efficiency requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES Project Title: Data filename:Untitled.cck 09/02/21Report date: 51 ofPage Shane Wiebe - Electrical Engineer Shane Wiebe 09/02/2021 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.5.1 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 780 CMR Massachusetts State Building Code, 9th Edition, Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Completed COMcheck Inteiror Lighting certificate and Plan Review Checklist will be submitted with application. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:Untitled.cck 09/02/21Report date: 52 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:Untitled.cck 09/02/21Report date: 53 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:Untitled.cck 09/02/21Report date: 54 ofPage Project Title: Data filename:Untitled.cck 09/02/21Report date: 55 ofPage