HomeMy WebLinkAboutCOC requestCAPE COD ENGINEERING, INC.
Robert M. Perry, P.E.
P.O. Box 1517
East Dennis, MA 02641
Tel 508-385-1445 / Fax 508-385-1446
bobyerry(akapecod.net
October 5, 2021
Town of Yarmouth
Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
RE: 85 Merchant Ave, Yarmouth Port; SE 83-1871- Certificate of Compliance
Proposed Reconstruction of Existing Rip -Rap, Applicant Susanne McInerney
To the Conservation Commission,
Attached please find Form 8A and a check in the amount of $75.
I have inspected the property, spoken with the applicant and I can state that no work was
ever started.
Please contact me directly with any questions. Thank you for your assistance with this
project.
Sincerely,
Cape Cod En 'nee g, Inc.
�/
Rob rt M. P rry
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance SE 83-1871
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
--i - Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
raven
1. This request is being made by:
Cape Cod Engineering, Inc.
Name
P.O. Box 1517
Mailing Address
East Dennis
MA
02641
Cityfrown State Zip Code
508-385-1445
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Upon completion
of the work 3
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of 4
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Susanne McInerney
Applicant
1/25/2010 SE 83-1871
Dated DEP File Number
The project site is located at:
85 Merchant Ave
Street Address
136
Yarmouth Port
City/Town
108
Assessors Map/Plat Number Parcel/Lot Number
The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
Certificate (if registered land)
5. This request is for certification that (check one):
24359
Book
299
Page
❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
® the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc -- rev. 5129/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
DEP File Number:
WPA Form 8A — Request for Certificate of Compliance SE 83-1871
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.ciov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
wpaformSa.doc -- rev. 5/29/14 Page 2 of 2