Loading...
HomeMy WebLinkAbout363 Whites Path DRC COMPLETE PACKET 061819Town of Yarmouth Per M.G.L.: All town and school boards, committees, commissions, and authorities shall post a notice of every meeting at least 48 hours prior to such meeting, excluding Saturdays, Sundays, and legal holidays. Notice shall contain a listing of topics/agenda that the chair reasonably anticipates will be discussed at the meeting. Name of committee: Date of Meeting Notice of Meetings Design Review Committee June 18, 2019 I Time: 14:00 PM Place: Room B, lower level of Yarmouth Town Hall 1146 Route 28, South Yarmouth, MA Agenda (Topics to be discussed): 1. Formal Design Review: Robert B. Our Company, 363 White's Path, South Yarmouth, Assessor's Map 110, Parcel 9, Zoning Districts B3/APD. The Applicant is proposing to convert an existing industrial factory bay into 2,560 square feet of business office space and associated site work. 2. Adjournment. Attachments: Please note: The Design Review Committee meets as necessary. Copies of documents and other exhibits listed here may be found in the Department of Community Development at Yarmouth Town Hall, 1146 Route 28, South Yarmouth. YARMOUTH TOWN CLERK $9JON14Pmi2:50 RE6 Review is: ❑ Conceptual R Formal ❑ Binding (404 MotelsNCOD/R.O.A.D. Project) 17 Non-binding (All other commercial projects) Review is by: ❑ Planning Board x❑ Design Review Committee YARMOUTH TOWN CLERK DES/GN REV/EW COMMENT SHEET '19,IILIN20P 9:00 REC Meeting Date: June 18, 2019 Map: 110 Lots: 9 Applicant: Robert B. Our Company Zone(s): B3/APD Site Location: 363 White's Path, South Yarmouth, MA 02664 Persons Present: DCR Members Present Yarmouth Town Staff Present Guests Charlie Adams Kathy Williams Abby Our Dick Martin Alison Alessi Sara Porter DRC Review for this project started at: 4:03 PM in Room B DRC Review ended at: 4:52 PM On a motion by Sara Porter, seconded by Charlie Adams, the Design Review Committee (DRC) voted (3-0) to adjourn the June 18, 2019 DRC meeting at 4:52 PM. Proiect Summary General Description: The Applicant is proposing to convert an existing industrial factory bay into 2,560 square feet of business office space. Some site improvements have been shown to add greenery to the front of the building. Summary of Presentation: Alison Alessi, Architect, gave a brief overview of the project. The existing building is relatively non-descript, and are working to turn it into office space. Only finishing a portion of the existing building. Office space would be for Robert B. Our staff. The large overhead door on the northern elevation will be filled with glass to get some light to make for a more pleasant work environment. The front will include signage, updated lighting and a small pergola roof. The west elevation, facing the side, will have some new windows for natural light. Conceptual site plan added some greenery in the front. Want to keep the space behind and around available for industrial sized trucks. Abby Our noted that the property is heavily used and they need to maintain curb cuts for larger trailers. DRC Questions & Discussions: Dick Martin expressed concerns about the parking in the front without buffers. Charlie asked about the parking. Can parking on adjacent spaces be used for this property. Abby Our noted that it is all in the same ownership. Sara Porter asked about the types of trucks accessing the rear of the property. Sarah noted that moving the gate further to the west would provide for parking against the west wall. Dick Martin noted that he would like to see the parking behind the gate and make more green space in the front. Charlie noted having built up planting boxes so wouldn't impact the asphalt or utilities. Dick Martin noted that the building would be much more attractive with the proposed improvements. Site is very non- conforming related to buffers/plantings that would be required now. Kathy Williams noted that increasing parking due to change in use could trigger site upgrades. Will need to coordinate with the Building Commissioner. The newer buildings along White's Path have done a lot of nice site improvements, so dressing up the front and moving the parking to the side would be much appreciated. Charlie noted that a second egress would help with insurance. Charlie inquired about lighting. Alison noted the gooseneck lighting on the front of the building and need lighting at the doors for emergency egress. Sara inquired about the colors. The building will be gray and the windows will have black frames. Suggested cleaning up the electrical meter service to the building. Suggested reconsidering the parking location to the side. Abby Our noted that they need the pavement in the front for trucks to park and pick-up materials. Charlie asked about the location of the dumpster, which is located in the back. Review Comments In Relation To The Design Standards SITING STRATEGIES Sect. 1. Streetscape ❑ N/A ❑ Meets Standards, or ❑x Discrepancies: The entire front Streetscape is currently paved with no remaining greenery. The Applicant has shown some greenery in the front to help define the Streetscape but this is located within the road right-of-way (ROW) and trees cannot be planted in the ROW or over utilities. Sect. 2, Tenant Spaces 19 N/A ❑ Meets Standards, or ❑ Discrepancies: Sect. 3, Define Street Edge ❑ N/A ❑ Meets Standards, or 0 Discrepancies: See Comments to Sect 1, Streetscape above Sect. 4, Shield Large Buildings ❑x N/A ❑ Meets Standards, or ❑ Discrepancies: Sect. 5, Design a 2nd Story ❑ N/Ax❑ Meets Standards, or ❑ Discrepancies: Sect. 6, Use Topo to Screen New Development 19 N/A ❑ Meets Standards, or ❑ Discrepancies: Sect. 7, Landscape Buffers/Screening ❑ N/A ❑ Meets Standards, orx❑ Discrepancies: DRC suggested moving the required parking to the westerly side of the building and green-scape as much as possible the front of the property, including a few trees. Sect. 8, Parking Lot Visibility ❑ N/A ❑x Meets Standards, or ❑ Discrepancies: Meets the standard if move parking to west side of building and screening it with additional front buffering. Show parking area for the office staff to meet zoning requirements. If leave spaces in the front, it does not meet the standard. Sect. 9. Break up Large Parking Lots ❑D N/A ❑ Meets Standards, or ❑ Discrepancies: Sect. 10, Locate Utilities Underground ❑ N/A ❑ Meets Standards, or 17 Discrepancies: Overhead utilities are shown as remaining. Sect. 11, Shield Loading Areas 19 N/A 0 Meets Standards, or 0 Discrepancies: BUILDING STRATEGIES: This project is a renovation to an existing building and includes minor modifications to add windows and entrances to the new office space. Sect. 1, Break Down Building Mass — Multiple Bldqs. ON/A ❑ Meets Standards, or ❑ Discrepancies: Sect. 2, Break Down Building Mass — Sub -Masses ❑ N/A ❑x Meets Standards, or ❑ Discrepancies: Sect. 3, Vary Fagade Lines ❑ N/A ❑ Meets Standards, orx❑ Discrepancies: Although there are limited fagade changes in the existing industrial building, the variations in the roof lines and heights provide interest to the building lines. The pergola also adds depth and interest to the office area. Sect. 4, Vary Wall Heights ❑ N/A ❑x Meets Standards, or ❑ Discrepancies: Sect. 5, Vary Roof Lines ❑ N/A Z Meets Standards, or ❑ Discrepancies: Sect. 6, Bring Down Building Edges ❑ N/A ❑x Meets Standards, or ❑ Discrepancies: Sect. 7, Vary Building Mat'ls For Depth ❑ N/A ❑x Meets Standards, or ❑ Discrepancies: Sect. 8, Use Traditional & Nat'l. Building Mat'ls ❑ N/A 0 Meets Standards, or ❑ Discrepancies: DRC supported extending the proposed fiber cement siding to the entire front fagade. Sect. 9, Incorporate Pedestrian -scaled Features ❑ N/A x❑ Meets Standards, or ❑ Discrepancies: The pergola over front fagade adds a pedestrian scaled feature. Sect. 10, Incorporate Enerqv-efficient Design ❑ N/A I@ Meets Standards, or ❑ Discrepancies: Next step for applicant: ❑ Go to Site Plan Review ❑ Return to Design Review for Formal Review On a motion by Sarah Porter, seconded by Charlie Adams, the Design Review Committee (DRC) voted (3-0) to approve these DRC Comments as meeting minutes for June 18, 2019 for the proposed office conversion at 363 White's Path South Yarmouth. Received by Applicant(s) ATTAC • June 18, 2019 Agenda • Aerial Photos — current view and 2017 view • Building Photos • DRC Application: o Design Review Application and Materials Specification Sheet o Site Concept Plan — no title block or date provided o Architectural Plans: 11x17 Plans: All architectural plans prepared by A3 Architects, Inc, dated June 18, 2019: ■ A-1 — First Floor Plan ■ A-2 — Second Floor Plan ■ A-3 — Elevations Section • Supplemental information provided at the DRC Meeting: o Anderson Window Cut -sheets 363 Whites Path Write a description for your map. $ 4 � T* • 1 1 �.� f Y FA w � TY Legend 363 W h j Feature } wr ••i__-N��■■ r ratf 1 1 363 Whites Path 2617 Write a description for your map. Legend 363 Whites Path Feature 1 U t $' } RW - 363�White 363 Whites Path Write a description for your map. 7egendtWkites Path ure 1 Google Earth 5.44 ft Town of Yarmouth Design Review Application Date: ob 1 L I k6 OwnerApplicant's Phone: or • # • Property (Project) ° •• .rte P Assessor's Map/lot Zoning District(S): Flood Zone: 14 Engineer/Surveyor: W' Aw T<: tA r, L Arc: hitect:Sp N S C.. Project C3escription: �Awdl� Applicant Wf ' j abate;. Provide color chips and or materia! samples where nec°essarY. Project Siding Type & Material(s): Roof Material & Pitch(es): Windows. 0 Wood Other (specify) Doors: 0 Wood Cather (specify) Trim Size;:: Windows & boors i � r corner Boards N I Soffits RakesA, Fascia..,.._" 1�3 Trim Material: 0 Wood 0 Other (sped) Shutters: Wood/Vi nyl/Othe r -Pane led/Louve red k ' Gutters: 0 Wood 0 Other (specify)- Garage floors. Material; Size; Style Becks And Railings: 0 Wood 0 Other (specify) Fencing; 0 Wood 0 Other (specify) Size: (Show Layout And Running Footage On Site Plan) Retaining Wall(s): Pressure Treated/Fieldstone/Other14 (Show layout And Running Footage On Site Plan) , Signs: (Show On Plan) Size; Style p h4 VJL,01,1`470` Additional' Information: l .. ;. J�Ltf*— .. Color(s): .= Andersen ARCHITECTURAL. C0LLECT10N A -SERIES WINDOWS & DOORS Casement Windows Andersen" A -Series casement windows are our hest performing casement windows. They're available with all of our energy-efficient glass options, and their exteriors are virtually maintenance -free. With so many options to choose from, start designing yours today. 10111;L1:111114 • Virtually maintenance -free • Exterior finish never needs painting and won't flake, rat, blister, peel or corrode' • Exteriors are protected by a FlbreO material and fiberglass for long-lasting' performance ENERGY-EFFICIENT • Weather -resistant construction for greater comfort and energy efficiency ■ Variety of High -Performance Low- E41 glass options available to help control heating and cooling costs in any climate • Many A -Series casement windows have options that make them ENERGY STAR* v. 6.0 certified throughout the U.S. f T4_Ir Biffiq • Eleven exterior color options and a variety of interior options • Extensive hardware selection, grilles, between -the -glass art glass and patterned glass options WPA, anders&wWKurs.carrywarranfy for d(loih. -ENERGY STAR' rsa reentered trademark of the LI,S. Lrmramwnlal I'ra[ecuon Agency. A—SERIES THE ARCHITECTURAL COLLECTION OPTIONS & ACCESSORIES • Variety of energy-efficient glass options • Patterned glass options • Exclusive art glass designs that are placed between glass panels • Available with Stormwatch° protection for coastal areas • Variety of grille styles and sizes • Wide variety of hardware styles and finishes • Exterior trim options INTERIOR OPTIONS Wood Species Pine Maple Vertical Grain Douglas Fir Interior Finishes & Painted Options Clear Coat Honey Cinnamon Canvas Sandtone Dark Bronze EXTERIOR COLORS White Canvas Dove Gray Sandtone Prairie Grass Red Rock Forest Green Black Dark Bronze Cocoa Bean Terratone TRIM STYLE OPTIONS r (io Flat trim with Flat trim with Brick mould Flat trim with Flat trim with Flat trim with extended head flush head decorative 2" cornice 3 5/8" cornice drip cap Oak Cherry Mahogany' Shown on Pine. Available on Pine, Maple and Oak only. Russet Mocha Espresso White Black HARDWARE STYLES & FINISHES Contemporary Folding Traditional Folding Black I Bright Brass I Gold Dust Antique Brass I Black I Bright Brass Oil Rubbed Bronze I Satin Nickel Brushed Chrome I Distressed Bronze I Distressed Nickel Stone I White Gold Dust I Oil Rubbed Bronze I Polished Chrome Satin Nickel I Stone I White *Actual wood is sapele, a non -endangered species of mahogany, grown in Africa, with color and characteristics of American mahoganies. Printing limitations prevent exact duplication of colors and replication of finishes. See your Andersen dealer for actual color and finish samples. Naturally occurring variations in grain, color and texture of wood make each window one of a kind. All wood interiors are unfinished unless a painted interior is specified. "Andersen" and all other marks where denoted are trademarks of Andersen Corporation. 02017 Andersen Corporation. All rights reserved. SS_033 01/17 Antique Brass Oil Rubbed Bronze Distressed Nickel Birch Bark Primed (rowel"t) Black Polished Chrome Satin Nickel Bright Brass Brushed Chrome Stone Gold Dust Distressed Bronze White Andersen 'A For more information, visit andersenwindows.com/a-series For help finding an Andersen product or dealer near you, please call us at 877.577.7655 or visit andersenwindows.com. Arri L ro ':ter' "` ��. y� tSE� �r /�'C� /"— � �� UZI AS - FT top do w gW AP 'M do as w i�4 M- 0" 000 owes _.4040" wo Wes 5Z -coo 0" 040 0.0 *oil IWO o" i4le-ci SOIRAAA . W No AREA CALCULATIONS: EXTG CONDITIONED SPACE: 1 ST FLOOR: 2560 SF" 2ND FLOOR - STORAGE: 1800 SF TOTAL: 2560 SF t-IKS I rLK trHl-t 40'-9" X 58'-8" O LL Z O — Q _ Q 2 -i - ----I- -- z Z) Q Q Z) a 2: O Ow= uuuu (0 c) ED c) o >m O = O P BREAK ROOM w Lu - -1 12'-0" x 13'-0" Q� Co r O Q PEI v v v v = I TITLE: M FCOFFICE OFFICE 9'"X11 19'-6" X 11'-6' 9-6 X 11-3-6-3 PLANS 20'-9Y"101_0., 9'-9Y4" 6,_By , 12'-2%' / III E o 0 a 01 / NEW GLASS CURTAIN III `0 0 c WALL SYSTEM IN O EXISTING MASONRY III v �'o+ OPENING III \ a' Q OD t co N � V M o A ENTRY/RECEPTION III � " . 0 19'-0" 18'-0" 202 o Vo 9-N �z A/I z U o � A I I •� W G L E WW F; �LL Vo W 0 1 1ll u 10'-1 o %,, 9'-10%" 9'-10�/a' 9' 10�/„ 4 6' 1 %a" o ° ��G17j � �4J °3 00 00 00 00 0 O M a ADA BATH ADA BATH COPIE / 6'-0" x 8'-0" 6'-0" x 8'-0" STORA E Date: Li6-0" x 8'- " EXTG 04.29.2019 vSD 05.03.2019 OFFICE OFFICE OFFICE OFFICE O 0\ DESIGN 06.18.2019 9'-6" X 11'-3" 9'-6" X 11'-3" 9'-6" X 11'-3" 9'-6" X 11'-3" 16— ILI B B B B 9'-5" 2'-1 REMOVE EXISTING BLOCK REMOVE EXISTING BLOCK 02 WALL FOR NEW WINDOWS WALL FOR NEW A 1 60'-4Y4" WINDOWS/DOOR _ 1 FIRST FLOOR PLAN Al 3/16"=l' -o' SECOND FLR SPACE 780 SF STORAGE O LL Z O 06 Q 2 Z � d < Ow= > OD F— F- 0 O = O w Lu OFFICES/CONFERENCE Q M ROOM BELOW \ TITLE: \\� PLANS UP o £ N -- I� ° co o A v N d y L O ^\ N N Q W U MEZZANINE A OPEN TO BELOW STORAGE W � I �o� o 19'-0" X 40'-0" z 3 A N �z A --\ Z s NEW GLASS CURTAIN o� WALL SYSTEM IN / EXISTING MASONRY A OPENING •� E C` 0 U E OV OFFICES BELOW � oz= ,� 05 a� �o oc ;P'- Date: EXTG 04.29.2019 SD 05.03.2019 DESIGN 06.18.2019 B B B B REMOVE EXISTING BLOCK REMOVE EXISTING BLOCK WALL FOR NEW WINDOWS WALL FOR NEW WINDOWS A-2 SECOND FLOOR PLAN A2 3/16^=I._o" REPLACE EXISTING W.C. SHINGLES 12 WITH NEW 16 SHINGLES 0 LL. Z EXISTING CONRETE P J12 0 BLOCK WALL TO BE 6 PAINTED Q = PROPOSEDQ Q COMPOSITE z a 2: PERGOLA AT O w = FRONT ENTRY, PAINTED O D_ m M W Lu ❑ ❑ ❑ ❑ F11 NEW GOOSENECK Q O lD Q STYLE LIGHTING M AT FRONT ENTRY E:I=Ll TITLE: z NEW SIGNAGE ELEVATIONS WITH LOGO SECTION NEW CURTAIN I I I E = WALL SYSTEM AT r EXISTING DOOR o OPENING o °z u m 16,_0• o a v L C L N Q QD p N c N p i NORTH ELEVATION — STREET ELEVATION 2 SECTION c —v0o Vo ..N Z o� EXISTING ASPHALT w ROOF TO BE REPLACED WITH NEW ARCH. 0� ASPHALT ROOF 0 V° u EXISTING CONRETE ° o BLOCK WALL TO BE td PAINTED i± ado Ll PROPOSED COMPOSITE Date: PERGOLA AT FRONT ENTRY, EXTG 04.29.2019 PAINTED SD 05.03.2019 PROPOSED DESIGN 06.18.2019 FIBERCEMENT SIDING NEW ANDERSEN CASEMENT WINDOWS A-3 3 WEST ELEVATION — SIDE A3 1/8"_i,_o" MEZZANINE CONFERENCE ENTRY OFFICE