Loading...
HomeMy WebLinkAbout9 Commonwealth DRC COMPLETE PACKET 0829181 Williams, Kathleen From:Williams, Kathleen Sent:Thursday, August 23, 2018 6:55 PM To:Charles Adams (adams2430@gmail.com); Chris Vincent (christophervincent@comcast.net); Dick Martin (dick@dickmartinera.com); Jack McCormack (johnhmccormackjr@comcast.net); Sara J Porter (sjparch@comcast.net) Subject:9 Commonwealth - DRC Meeting August 29th Attachments:082918 9 Commonwealth Packet to DR 082318.pdf; Concept Sketch 082318.pdf Hi Guys,    Please find attached DRC packet information for the project at 9 Commonwealth Avenue.  The packet information  includes:    a. August 29, 2018 Agenda  b. Aerial & Photos  c. DRC Application Form  d. DRC Application Plans  e. Concept Sketch    The project includes site improvements to allow for transportation facility (buses) and does not include any  proposed improvements to the building.      SITE COMMENTS:  The following are my general comments on the site plans for your consideration.    1. General: I understand the need to maximize the use of the property, but there is an extensive amount of  parking lot with no trees and essentially on‐street parking along commonwealth Ave, eliminating the ability  to have a vegetated buffer.   Also, trying to provide parking for all the buses and the drivers and then an area  for driver training course exacerbates the problem.  There is significant lot coverage which may exceed the  70% coverage allowed.   Whenever a property is redeveloped, it should be improved and effort should be  made to try to conform to the zoning bylaw, especially with regard to buffers.  2. Buffer Areas:  a. Consider reducing or eliminating the driver training course to provide for driver parking on‐site,  eliminating parking in the buffer along Commonwealth Ave and allowing for planting of landscaped  buffers along Commonwealth Ave, including 3” caliper trees every 20’ in front of parking areas.  Tree  species should be identified.  b. The plans note that existing large diameter trees (4‐inches) within all the buffer zones need to be  maintained, but do not reference the large diameter trees behind the parking along Commonwealth  Ave which should be retained.  There also needs to be a note indicating that where there are no  existing 4‐inch diameter or greater trees in the buffer at 20’intervals, 3” caliper trees every 20’ need  to be planted in the buffers to screen parking.      3. In‐lot Parking Trees:  There is an extensive amount of parking on the site with no relief from in‐lot trees.    4. Fencing:  The stockade fence along Commonwealth Ave referenced on the plan does not appear to existing  anymore.  New 6’ fencing and gates should be provided along Commonwealth Ave and around the parking  area along White’s Path(which is parking in the front and will require relief).  Chain link fence used around  the bus storage area should be black.  5. Snow Storage:  Area for snow storage needs to be identified to be sure it does not end up in the  bioretention area.  2 6. Sign:  There is no information on the proposed signage.    7. Lighting:  There is no detail on any proposed site lighting.    I tried to address some of the items noted above in the attached Concept Sketch.  Hard copies are in the Box outside  my office.    I am in/out next week, but will be here for the meeting on Wednesday.    Thanks,  Kathy      ---------------------------------------- Kathy Williams, PE Yarmouth Town Planner 1146 Route 28 South Yarmouth, MA 02664-4492 (508) 398-2231 Ext 1276 kwilliams@yarmouth.ma.us             feetmeters800200 SITEBYPERMITTINGSite PlansAS PREPARED FORProposed Transportation FacilityAugust 8, 2018RLA Project Number: 180601809 College HighwaySouthwick, MA 01077Five Star Transportation, Inc.c/o Nathan Lecrenski9 Commonwealth AvenueYarmouth, MAAssessor's Map: 98 Parcel: 91.1 & 92.240 School Street · Westfield, MA · 01085ph 413.568.0985 · fax 413.568.0986www.rlaland.comINCA LAND PLANNING SERVICES COMPANYR L A REV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - Exist Commonwealth.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018EX-1EXISTING CONDITIONS PLAN-ZONING REVIEW - (B3)TYPE (MINIMUM)REQUIREDAREA40,000 S.F.FRONTAGE100 FTWIDTH10 FTFRONT YARD 30 FTSIDE YARD 10 FTREAR YARD30 FTBUILDING COVERAGE (MAX)15%CORNER LOT: SECTION 203.5 (X)two front yards/two side yards NOTES, SYMBOL & LINELEGEND AND ABBREVIATIONSREV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018C-1-XSSSSSS CONSTRUCTION NOTESREV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018C-2 - DEMOLITION, REMOVALS, EROSION &SEDIMENTATION CONTROL PLANREV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018C-3 - LAYOUT & MATERIALS PLANREV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018C-4 -ZONING REVIEW - (B3)TYPE (MINIMUM)REQUIREDAREA40,000 S.F.FRONTAGE100 FTSHAPE FACTOR (MAX)22FRONT YARD 30 FTSIDE YARD 10 FTREAR YARD30 FTBUILDING COVERAGE (MAX)15%CORNER LOT: SECTION 203.5 (X)two front yards/two side yardsEXISTING88,862 S.F.±357 & 205 FT1830 FT10 FT30 FT5%two front yards/two side yardsPROPOSEDNO CHANGENO CHANGENO CHANGENO CHANGENO CHANGENO CHANGENO CHANGEtwo front yards/two side yardsPARKING TOTALSTYPEQUANTITYBUS 40EMPLOYEE29 (2 HCAP) GRADING, DRAINAGE& UTILITIES PLANREV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018C-5 - SITE LANDSCAPING ANDPHOTOMETRIC PLANREV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018C-7 -Luminaire ScheduleQtyLabelWattsArrangementLLFDescription4WP459.9SINGLE0.900Hubbell LNC3-24L3K-075-4-U-x-x-x / Mounted at 15' AFG2WP227.9SINGLE0.900Hubbell LNC3-24L3K-035-2-U-x-x-x / Mounted at 10' AFG DETAILSREV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018D-1SILT FENCE DETAILHANDICAP PARKING STALLSHRUB PLANTING DETAILTREE PLANTING DETAILANTI-TRACKING APRON (AS REQ'D)AAREINFORCED CONCRETE SIDEWALK SECTIONINLET PROTECTION - SEDIMENT FILTER SACKBITUMINOUS CONCRETE PAVING DETAILINLET PROTECTION - HAY BALESSLOPE PROTECTION MATERIAL INSTALLATION (AS REQ'D)-BITUMINOUS CONCRETE BERM (CAPE COD)STEEL BOLLARD WITH SIGN DETAIL REV.RLA PROJ. NUMBER:DRAWING#OF MASSACHUSETTS STATE LAWTHIS DOCUMENT IS A VIOLATIONUNAUTHORIZED ALTERATION OFDATE:ISSUANCE DATE:REVISIONS:PREPARED FOR:ph: 413.568.0985 fax: 413.568.0986rlaland.comWestfield, MA 01085R L A40 School StreetSCALE:S:\Projects\2018\180601 - Lecrenski - 9 Commonwealth & 00 White Path, S. Yarmouth\Civil 3D\180601 - SITE.dwgLandscape ArchitectsCivil Engineers · Land SurveyorsEnvironmental Consultants180601AS NOTED9 Commonwealth AvenueYarmouth, MassachusettsAssessor's Map: 98 Parcel: 91.1 & 92.2Nathan LecrenskiFive Star Transportation, Inc.809 College HighwaySouthwick MA. 01077PERMITTINGAugust 8, 2018D-2DETAILSPERMANENT PAVEMENT REPLACEMENT PLAN (IF REQ'D)-ACCESSIBLE RAMP - PARALLEL CURB CUTTYPICAL BIORETENTION AREA DETAILADS NYLOPLAST YARD DRAIN BASIN6' STANDARD SINGLE SIDE WHEEL STOPVEGETATED FILTER STRIP WITH LEVEL SPREADER