Loading...
HomeMy WebLinkAboutFI78013 M-E Field Observation Report of 9-23-21GGD Consulting Engineers, Inc. TEL 508-998-5700 FAX 508-998-0883 email: info@g-g-d.com MECHANICAL & ELECTRICAL FIELD OBSERVATION REPORT FI#78013 J#685 005 00.00 DATE: October 13, 2021 PROJECT: Dennis Yarmouth Intermediate / Middle School 296 Station Ave South Yarmouth, MA 02664 CLIENT: Perkins-Eastman DATE OF OBSERVATION: September 23, 2021 OBSERVED BY: Frank J. Mortell _______________________ CONTACT: Andrew Hazelton, Senior Associate, Perkins-Eastman DISTRIBUTION: Russell E. Higgins, Perkins-Eastman Leah Schroeder, Perkins-Eastman Dominick B. Puniello, P.E., GGD Engineers, Inc. Matthew S. Woodward, GGD Engineers, Inc. Louis Vieira, GGD Engineers, Inc. David M. Pereira, P.E., GGD Engineers, Inc. Jorge Rosa, GGD Engineers, Inc. Cheryl Cieplik, GGD Engineers, Inc. The following comments are observations noted by our field personnel and may include items of work which were noted as not meeting the intent of the documents. There may be additional items which also do not meet the intent of the documents and their lack of notation should not be construed as acceptance of non-compliant elements of the work. Contractor is to review all documents and comply with all requirements, whether or not listed below. Area D: 1. Below slab electrical raceway rough installation appears to be complete, open-ended conduits are sealed to prevent debris/contaminants from entering raceway. GGD Consulting Engineers, Inc. FI#78013 J#685 005 00.00 Page 2 Area A: 2. Secondary duct bank rough installation is in progress and partially covered in concrete (outside of the building foundation wall). Open ended conduits are sealed to prevent debris/contaminants from entering raceway in Main Electrical Room. GGD Consulting Engineers, Inc. FI#78013 J#685 005 00.00 Page 3 3. Below slab conduits for future sports lighting from Main Electrical Room through area A and B building footprint rough installation is nearing completion. GGD Consulting Engineers, Inc. FI#78013 J#685 005 00.00 Page 4 Area B: 4. Below slab communication duct bank rough installation is in progress. Install conduit spacers as required. Raceway is not incased in concrete at this time. GGD Consulting Engineers, Inc. FI#78013 J#685 005 00.00 Page 5 General: 5. Below slab raceway rough installation for fire alarm, power, lighting, and communication systems is in progress within the building footprint of all areas of the project, open ended raceways are sealed with duct tape to prevent contaminants from entering raceway system. 6. All duct banks shall be constructed in conformance with the requirements of the contract documents.