HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2021-10-08Summary Report #19
October 11, 2021
Job No: 5951
Job Name:Dennis Yarmouth Middle School
296 Station Ave
South Yarmouth, MA 02664
TESTING
INSPECTION
ENGINEERING
SW
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
Application No.:
October 4, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Show-up time. See attached.
October 5, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
October 6, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at he jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
October 7, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
October 8, 2021
Peter Wilson reported to Nicholas Hull with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
TESTING
INSPECTION
ENGINEERING
SW
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
obtained: (5) per set, (1) set(s), (5) total. See attached.
Peter Wilson reported to Nicholas Hull with PMA at the josite. Performed soils compaction testing and observation of earthwork activities. No
Samples Taken. See attached.
Blake Mullens reported to Nicholas Hull with PMA at the jobsite. Performed field ultrasonic testing. See attached.
The work observed was, to the best of Peter's, Blake's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Enea Mushi
Project Manager
10-15-2021
Date
Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com)
Administrative Contact: Gina Salerno (gsalerno@fenaghengineering.com)
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Show up
Pg. 1 of 1
October 4, 2021
Time In: 07:00 Time Out: 11:00
Weather: Heavy Rain
Temperature: 68°F
Permit No. :
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Show-up time.
Additional Notes: Rainy day- Work canceled .
Reviewed by:
Arsene Ntwali
Inspector
10-11-2021
Date Enea Mushi
Project Manager
10-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
NYk
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
October 5, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 72°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
10-05-2021
Date Enea Mushi
Project Manager
10-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep‘s
foot, Dozer. No samples taken.
Density Std (DS):
2490
Moisture Std (MS):
476
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Buildin B
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep‘s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
RBO Crushed concrete 1 S797 128.2 7.8
Test# Test Location
Probe
Depth (in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 K/b18 6 -2 TOW 1 122.9 6.7 96 Pass
2 K/b19 6 -1 TOW 1 123.6 6. 96 Pass
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
October 5, 2021
Time In: 11:00 Time Out: 12:00
Weather: Sunny
Temperature: 72°F
Permit No. :
Plans Dated: 06/18/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
10-05-2021
Date Enea Mushi
Project Manager
10-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 wall(s) at
Building B and A. Work complete. Reference detail R012. Wall: V.5-V/a15, V-S.1/b13 Piers: a15/V, S.8, S.5, S.1; P/b6.
Reinforcing Steel and Anchor Bolts
YN YN
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
October 6, 2021
Time In: 07:00 Time Out: 09:00
Weather:
Temperature: 70°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
10-06-2021
Date Enea Mushi
Project Manager
10-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, wall(s) at V.5-V/a15, V-S.1/b13 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in.,
specified air content from 4.5% to 7.5%, and 30 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit.
Prepared 4x8" cylinder test specimens sampled from Concrete truck.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor
Ticket
No.
1 6.0 71 70 5.5 143.9 72 V/a15 5 7:25 AM 8:10 AM Marguerite
3201
4
5 Total
Additional Notes: Wall: V.5-V/a15, V-S.1/b13.rnPiers: a15/V, S.8, S.5, S.1; P/b6.
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
October 6, 2021
Time In: 09:00 Time Out: 15:00
Weather:
Temperature: 70°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
10-06-2021
Date Enea Mushi
Project Manager
10-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep‘s
foot, Dozer. No samples taken.
Density Std (DS):
2487
Moisture Std (MS):
476
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Building A
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep‘s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
RBO Crushed concrete 1 S797 128.2 7.8
Test# Test Location
Probe
Depth (in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 V.9/a1 6 -2 TOW 1 122.9 6.8 96 Pass
2 V/a5 6 -1 TOW 1 123.6 6.3 96 Pass
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
October 7, 2021
Time In: 07:00 Time Out: 15:00
Weather: Cloudy
Temperature: 71°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
10-07-2021
Date Enea Mushi
Project Manager
10-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep‘s
foot, Dozer. No samples taken.
Density Std (DS):
2490
Moisture Std (MS):
474
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Building A
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep‘s foot
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
RBO Crushed concrete 1 S797 128.2 7.8
Test# Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 V.5/a7 6 -3 TOW 1 122.7 6.7 96 Pass
2 V.5/a11 6 -2 TOW 1 122.2 6.0 95 Pass
3 V/a7 6 -1 TOW 1 123.0 6.2 96 Pass
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
October 7, 2021
Time In: 11:00 Time Out: 12:00
Weather: Cloudy
Temperature: 71°F
Permit No. :
Plans Dated: 06/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
10-07-2021
Date Enea Mushi
Project Manager
10-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 wall(s) at
Building A. Work complete. Reference detail R015. T-S auditorium arch.
Reinforcing Steel and Anchor Bolts
YN YN
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Peter Wilson
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
October 8, 2021
Time In: 07:00 Time Out: 12:00
Weather: Sunny
Temperature: 64°F
Permit No. :
Plans Dated: N/A
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Peter Wilson
Inspector
10-08-2021
Date Enea Mushi
Project Manager
10-09-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Peter Wilson reported to Nicholas Hull with PMA at the jobsite. Observed placement of and performed sampling of concrete for 1,
wall(s) at BLD A (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from
4.5% to 7.5%, and 11 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test
specimens sampled from Point of Discharge.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor
Ticket
No.
1 5 75 65 5 145.6 72 S.3/a1 5 7:23 AM 8:33 AM Maurgerite
1071
5
5 Total
TESTING
INSPECTION
ENGINEERING
Soils Compaction & Soils Observation
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Peter Wilson
Inspection Location: Building A
Subcontractor: Nicholas Hull
Pg. 1 of 1
October 8, 2021
Time In: 06:00 Time Out: 07:00
Time In: 12:00 Time Out: 15:00
Time In: 15:00 Time Out: 16:00
Weather: Sunny
Temperature: 63°F
Permit No. :
Plans Dated: N/A
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Peter Wilson
Inspector
10-08-2021
Date Enea Mushi
Project Manager
10-09-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Peter Wilson reported to Nicholas Hull with PMA at the jobsite. Performed soils compaction testing and observation of earthwork
activities. Equipment used was Amman Plate #3520 Compactor, Caterpillar 304EZ CR. No samples taken.
Density Std (DS):
2669
Moisture Std (MS):
388
Specified Compaction:
95
Soils Report prepared by:
Fenagh Engineering and Testing, Inc.
Source of Fill:
Import:
General Location of Fill:
stockpile
Nuclear Gauge:
Hobart HS 5001EZ 7203
calibration expiration date
07/09/2021
Soils Report Dated:
01/28/2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Amman Plate #3520 Compactor
Earthwork: Caterpillar 304EZ CR
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Structural Fill A 15408 130.7 7.9
Test# Test Location
Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction (95)
(%)Comments
1 A6/V.5 6 -1 A 125.2 8.3 96 Pass
2 L.9/b1 6 -2 A 124.4 8.1 95 Pass
3 L.9/b2 6 -2 A 124.1 7.8 95 Pass
TESTING
INSPECTION
ENGINEERING
FIELD ULTRASONIC TESTING REPORT
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: G-2732.18
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Blake Mullens
Inspection Location: Area - C
Subcontractor: Stellar Steel Erectors
October 8, 2021
Time In: 09:00 Time Out: 18:00
Weather: Partly Cloudy
Temperature: 75°F
Permit No. :
12 Tech Circle Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax | 9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374 office |
54-21 73rd Place, Maspeth, NY 11378 | (516) 787-3333 office | 13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
Reported to Nicholas Hull with PMA at Jobsite.
Inspection is: FINAL.
Equipment/Brand:: StressTel / FlawMike Model #: 37550 Serial #: X9707Ga
Transducer/Brand: Tru-Sonic Scan Level: +14db
Size: 0.625X0.750 Frequency: 2.25MHz Angle: 45deg / 70deg Reference Level: 81
Floor/Level Member Type Location Weld Type Acc. Qty Rej. Qty
Repair RemarksAcc Qty Rej. Qty Rej. Date
2 CJP D.1/II V-Groove 1 0 N/A N/A N/A Top Moment
2 CJP D.1/JJ V-Groove 2 0 N/A N/A N/A Top and Bottom Moment
2 CJP D.5/II V-Groove 1 0 N/A N/A N/A Top Moment
2 CJP D.5/JJ V-Groove 2 0 N/A N/A N/A Top and Bottom Moment
2 CJP E/d5 V-Groove 2 0 N/A N/A N/A Top and Bottom Moment
2 CJP E/c9 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
2 CJP H/c1 V-Groove 1 0 N/A N/A N/A Top Moment
2 CJP H/c3 V-Groove 2 0 N/A N/A N/A Top Moments
2 CJP H/c5 V-Groove 1 0 N/A N/A N/A Top Moment
2 CJP H/c19 V-Groove 2 0 N/A N/A N/A Top Moments
2 CJP H/c21 V-Groove 1 0 N/A N/A N/A Top Moment
Roof CJP D.1/II V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP D.1/JJ V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP D.5/II V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP D.5/JJ V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP E/c2 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP E/c4 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
Roof CJP E/c6 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP E/c9 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
Roof CJP H/c1 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP H/c3 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
Roof CJP H/c5 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
□ See attached UT Rejection report for rejectable indications noted above.
Additional Notes: Performed visual inspection of anchor bolts at Area C. Anchor bolts tightened and acceptable. Performed
visual inspection of plate washer welds at Area D. Plate washer welds acceptable per standards. Performed visual inspection of
lower wind brace weldments at Area C. Wind brace weldments within this area acceptable per standards. Performed visual
inspection of level 2 bolting at Area - D. Bolting within this area acceptable per standards.
Referenced Details: S-1.23C, S1.33C
TESTING
INSPECTION
ENGINEERING
FIELD ULTRASONIC TESTING REPORT
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: G-2732.18
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Blake Mullens
Inspection Location: Area - C
Subcontractor: Stellar Steel Erectors
October 8, 2021
Time In: 09:00 Time Out: 18:00
Weather: Partly Cloudy
Temperature: 75°F
Permit No. :
Conformance:
Work observed was, to the best of my knowledge, in conformance with Approved plans dated: 01/19/2021
and the applicable standards of workmanship, per sheet(s)/detail(s) AWS D1.1
Limitation:
These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to
adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered
preliminary and subject to change, unless signed by both inspector and engineer below.
Inspector Signature
10-08-2021
Date Project Manager
10-12-2021
Date
12 Tech Circle Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax | 9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374
office | 54-21 73rd Place, Maspeth, NY 11378 | (516) 787-3333 office | 13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
NCR ID# Date Location Inspector IssueRFI/ Submittal No.Resolved? (Y/N) Sub/ Contractor Date Resolved Comment1 7/21/2021 Wall : C /d3 Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 7 day break 08/10/2021 Set 1 = 1,860 psi 28 day break 08/31/2021 Set 1 = 2,800 psi Set 1 = 2,900 psi Set 1 = 3,480 psi 28 day average = 3,060 psi 2 7/28/2021 Footing : C16/E Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% : Lab Log No.: 15519 (2744-2745)NMargueriteEOR to Advise 28 day break 08/31/2021 Set 1 = 3,350 psi Set 1 = 3,500 psi Set 1 = 3,620 psi 56 day break 09/22/2021 Set 1 = psi3 7/30/2021Footings Set # 1 :Column line/Row: D.3/c116 Set # 2 Columm line / Row c5/H Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 28 day break 08/27/2021 Set 1 = 3,070 psi Set 1 = 3,330 psi Set 1 = 3,430 psi Set 2 = 3,330 psi Set 2 = 3,520 psi Set 2 = 3,580 psi 56 day break 09/24/2021 Set # 1 = 3,720 psi Set #2 = 3,670 psi4 8/3/2021Footings: Elevator pit foundationArsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 7 day break 08/10/2021 Set 1 = 2,610 psi 28 day break 08/31/2021 Set 1 = 3,170 psi 56 day break 9/28/2021 Set 1 = 3,330 psi Set 1 = 3,490 psi Set 1 = 3,700 psi 56 day average set 1 = 3,510 psi5 8/6/2021 Level 1 Wall at Building C and B - E/c2Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 7 day break 08/13/2021 Set 1 = 2,980 psi 28 day break 09/3/2021 Set 1 = 3,170 psi 56 day break 10/8/2021 Set 1 = 3,230 psi Set 1 = 3,400 psi 6 8/6/2021Level 1 Wall at Building C and B - J.7/b25Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 7 day break 08/13/2021 Set 2= 2,390 psi 28 day break 09/3/2021 Set 2 = 3380 psi 56 day break 10/8/2021 Set 1 = psi7 8/13/2021Level 1 Footings at Building B: P.1/b33Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 17 day break 08/30/2021 Set 1 = 3,090 psi 28 day break 09/10/2021 Set 1 = 3,460 psi Set 1 = 3,510 psi 56 day break 10/08/2021 Set 1 = psi Set 1 = psi8 8/13/2021Level 1 Footings at Building B: J.3/b24Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 7 day break 08/20/2021 Set 1 = 2,320 psi 28 day break 09/10/2021 Set 1 = 2,840 psi 56 day break 10/08/2021 Set 1 = psi Set 1 = psi9 8/20/2021Level 1 Footings at Foundation: Wall: H/c5Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%NMargueriteEOR to Advise 7 day break 08/27/2021 Set 1 = 2,810 psi 28 day break 09/17/2021 Set 1 = 3,440 psi Set 1 = 3,500 psi 56 day break 10/15/2021 Set 1 = psi Set 1 = psi10 9/3/2021 Level 1 Wall; U/a5 Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16067 (3123)NMargueriteEOR to Advise 7 day break 09/10/2021 Set 1 = 2,050 psi 28 day break 10/01/2021 Set 1 = 3,100 psi 56 day break 10/29/2021 Set 1 = psi Set 1 = psi Set 1 = psi11 9/9/2021 Level 1 Footing: M.5/b17Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16132 (3175)NMargueriteEOR to Advise 7 day break 09/16/2021 Set 1 = 2,400 psi 28 day break 10/07/2021 Set 1 = 3,480 psi Set 1 = 3,490 psi 56 day break 11/04/2021 Set 1 = psi Set 1 = psi12 9/10/2021 Level 1 Footing: L.9/b2Arsene NtwaliLow break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16133 (3176)NMargueriteEOR to Advise 7 day break 09/17/2021 Set 1 = 2,330 psi 28 day break 10/08/2021 Set 1 = 3,450 psi Set 1 = 3,450 psi Set 1 = 3,490 psi 56 day break 11/05/2021 Set 1 = psi Status: Work-in-ProgressLegend:Status: ClosedStatus: Open
TESTING
INSPECTION
ENGINEERING
Field Number: 6 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/04/2021
Client: PMA
Date of Sampling: 09/23/2021 Lab Log No.: 16288 (3264)
Reviewed by: CJ Martens
10/04/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 5000D Supplier: Cape Cod Ready Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 72
Design Strength (psi): 5,000 @28
days Ticket#: 31854
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at Building A and B
Location when sampled: P7/a18
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 8.0 5-8 Unit Wt (#cu ft): 143.6 143.4
Air Temperature (ºF): 72 >40 Air Content (%): 6.1 4-7 Time Sampled: 7:39 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:17 AM Time in Truck: 22 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/24/2021 Technician that received: Max Nabulsi
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 3 09/26/2021 Max Nabulsi 4.00 8.00 12.57 Lab 34,951 2,780 psi Type 2
B 7 09/30/2021 Henry Soares 4.00 8.00 12.57 Lab 44,144 3,510 psi Type 5
C 28 10/21/2021 4.00 8.00 12.57 Lab
D 28 10/21/2021 4.00 8.00 12.57 Lab
E 28 10/21/2021 4.00 8.00 12.57 Lab
F H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/04/2021
Client: PMA
Date of Sampling: 09/27/2021 Lab Log No.: 16339 (3323)
Reviewed by: CJ Martens
10/04/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 5000D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 68
Design Strength (psi): 5,000 @28
days Ticket#: 31894
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Q-P.7/a18, a18-24/W
Location when sampled: N.4/b5
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 69 50-90 Slump or Spread (in.): 6.5 5-8 Unit Wt (#cu ft): 143.7 143.4
Air Temperature (ºF): 75 >40 Air Content (%): 6.7 4-7 Time Sampled: 8:13 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:23 AM Time in Truck: 50 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/01/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 10/04/2021 Henry Soares 4.00 8.00 12.57 Lab 44,058 3,510 psi Type 5
B 28 10/25/2021 4.00 8.00 12.57 Lab
C 28 10/25/2021 4.00 8.00 12.57 Lab
D 28 10/25/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/04/2021
Client: PMA
Date of Sampling: 09/03/2021 Lab Log No.: 16067 (3123)
Reviewed by: CJ Martens
10/04/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 62
Design Strength (psi): 3,500 @28
days Ticket#: 21747
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Wall: T-W/a1, a1-8/W Spread footings: V/a4, U/a5, a6/V, a5/V.5, V and V.5/a8
Location when sampled: U/a5
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.7 143.1
Air Temperature (ºF): 82 >40 Air Content (%): 6.1 4.5-7.5 Time Sampled: 7:47 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:07 AM Time in Truck: 40 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/08/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/10/2021 Henry Soares 4.00 8.00 12.57 Lab 25,815 2,050 psi Type 5
B 28 10/01/2021 Henry Soares 4.00 8.00 12.57 Lab 39,020 3,100 psi Type 2
C 56 10/29/2021 4.00 8.00 12.57 Lab
D 56 10/29/2021 4.00 8.00 12.57 Lab
E 56 10/29/2021 4.00 8.00 12.57 Lab
FAILS TO MEET DESIGN STRENGTH
Remarks: Received Sample Condition: Acceptable and/or Satisfactory; Low 7 & 28-Day Indication test results. Specimens C-E will
be held for 56-Days.
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/04/2021
Client: PMA
Date of Sampling: 08/06/2021 Lab Log No.: 15654
Reviewed by: CJ Martens
10/04/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 2 Truck #: 56
Design Strength (psi): 3,500 @56
days Ticket#: 31302
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Building C and B
Location when sampled: E/c2
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 72 50-90 Slump or Spread (in.): 5.5 4-6 Unit Wt (#cu ft): 144.6 143.1
Air Temperature (ºF): 75 >40 Air Content (%): 5.8 4.5-7.5 Time Sampled: 7:35 AM
Aggregate Size (in): 3/4 N/A Batch Time: 6:51 AM Time in Truck: 44 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 08/10/2021 Technician that received:
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 08/13/2021 CM/ATL 4.00 8.00 12.57 Lab 37,510 2,980 psi
B 28 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 39,847 3,170 psi Type 2
C 56 10/01/2021 Henry Soares 4.00 8.00 12.57 Lab 42,717 3,400 psi Type 5
D 56 10/01/2021 Henry Soares 4.00 8.00 12.57 Lab 40,574 3,230 psi Type 5
E 90 11/04/2021 4.00 8.00 12.57 Lab
FAILS TO MEET DESIGN STRENGTH
56 Day Avg.:3,320 psi
Remarks: Test A samples tested at Allied Testing Laboratory, Inc, CTL# 207-018; *Low Indication Compressive Strength at 56-
Days, Remaining specimen E will be held for 90-Days
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/04/2021
Client: PMA
Date of Sampling: 08/06/2021 Lab Log No.: 15654
Reviewed by: CJ Martens
10/04/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 2 of 2 Truck #: 51
Design Strength (psi): 3,500 @56
days Ticket#: 31527
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Building C and B
Location when sampled: J.7/b25
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 72 50-90 Slump or Spread (in.): 6.0 4-6 Unit Wt (#cu ft): 144.1 143.1
Air Temperature (ºF): 75 >40 Air Content (%): 6.3 4.5-7.5 Time Sampled: 9:10 AM
Aggregate Size (in): 3/4 N/A Batch Time: 8:21 AM Time in Truck: 49 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 08/10/2021 Technician that received:
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 08/13/2021 CM/ATL 4.00 8.00 12.57 Lab 30,080 2,390 psi
B 28 09/03/2021 Henry Soares 4.00 8.00 12.57 Lab 42,433 3,380 psi Type 2
C 56 10/01/2021 Henry Soares 4.00 8.00 12.57 Lab 46,055 3,660 psi Type 2
D 56 10/01/2021 Henry Soares 4.00 8.00 12.57 Lab 47,293 3,760 psi Type 2
E 56 10/01/2021 Henry Soares 4.00 8.00 12.57 Lab 47,165 3,750 psi Type 2
MEETS DESIGN STRENGTH
56 Day Avg.:3,720 psi
Remarks: Test A samples tested at Allied Testing Laboratory, Inc, CTL# 207-018. Low 28-Day Indication Strength. Specimens C-E
were held for 56-Days.
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/07/2021
Client: PMA
Date of Sampling: 09/09/2021 Lab Log No.: 16132 (3175)
Reviewed by: CJ Martens
10/07/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 58
Design Strength (psi): 3,500 @28
days Ticket#: 21775
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at L/b15-20, M.5/b17-21, N.5/a23-30
Location when sampled: M.5/b17
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 68 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.9 143.3
Air Temperature (ºF): 74 >40 Air Content (%): 5.7 4.5-7.5 Time Sampled: 7:43 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:04 AM Time in Truck: 39 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/15/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/16/2021 Henry Soares 4.00 8.00 12.57 Lab 30,168 2,400 psi Type 5
B 28 10/07/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 43,884 3,490 psi Type 2
C 28 10/07/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 43,804 3,480 psi Type 3
D 56 11/04/2021 4.00 8.00 12.57 Lab
E 56 11/04/2021 4.00 8.00 12.57 Lab
FAILS TO MEET DESIGN STRENGTH
28 Day Avg.:3,490 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory. Low 28-Day Indications Compression Test Results.
Specimens D & E to be tested at 56-Days.
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/07/2021
Client: PMA
Date of Sampling: 09/07/2021 Lab Log No.: 16080 (3124)
Reviewed by: CJ Martens
10/07/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 58
Design Strength (psi): 3,500 @28
days Ticket#: 21756
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at L/b15-20, M.5/b17-21
Location when sampled: L/b15
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 69 50-90 Slump or Spread (in.): 5.25 4-6 Unit Wt (#cu ft): 144.3 143.3
Air Temperature (ºF): 75 >40 Air Content (%): 6.0 4.5-7.5 Time Sampled: 7:55 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:22 AM Time in Truck: 33 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/10/2021 Technician that received: Max Nabulsi
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/14/2021 Henry Soares 4.00 8.00 12.57 Lab 34,457 2,740 psi Type 2
B 28 10/05/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 48,106 3,830 psi Type 2
C 28 10/05/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 48,699 3,870 psi Type 2
D 28 10/05/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 48,372 3,850 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:3,850 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/07/2021
Client: PMA
Date of Sampling: 09/28/2021 Lab Log No.: 16340 (3322)
Reviewed by: CJ Martens
10/07/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 73
Design Strength (psi): 3,500 @28
days Ticket#: 31908
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at a8-15/W, W-V/a15
Location when sampled: W/a8
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 71 50-90 Slump or Spread (in.): 6.0 4-6 Unit Wt (#cu ft): 144.4 143.3
Air Temperature (ºF): 73 >40 Air Content (%): 6.3 4.5-7.5 Time Sampled: 7:40 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 6:50 AM Time in Truck: 50 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/01/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 10/05/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 33,393 2,660 psi Type 2
B 28 10/26/2021 4.00 8.00 12.57 Lab
C 28 10/26/2021 4.00 8.00 12.57 Lab
D 28 10/26/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Bernard Connaughton Report Date: 10/08/2021
Client: PMA
Date of Sampling: 09/30/2021 Lab Log No.: 16403 (3358-3359)
Reviewed by: CJ Martens
10/08/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Contractor: Marguerite
Set: 1 of 2 Truck #: 57
Design Strength (psi): 3,500 @28
days Ticket#: 170220
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Auditorium Stage Walls,A-6-S,Footings B-14-S.1-B.14-T.2, Isolated Footings B-11-S1,B
Location when sampled: A.7-T.2 Wall
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 145.6 143.1
Air Temperature (ºF): 60 >40 Air Content (%): 5.6 4.5-7.5 Time Sampled: 11:50 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 10:40 AM Time in Truck: 70 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/06/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 10/07/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 35,110 2,790 psi Type 2
B 28 10/28/2021 4.00 8.00 12.57 Lab
C 28 10/28/2021 4.00 8.00 12.57 Lab
D 28 10/28/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 10 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Bernard Connaughton Report Date: 10/08/2021
Client: PMA
Date of Sampling: 09/30/2021 Lab Log No.: 16403 (3358-3359)
Reviewed by: CJ Martens
10/08/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Contractor: Marguerite
Set: 2 of 2 Truck #: 59
Design Strength (psi): 3,500 @28
days Ticket#: 31952
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Auditorium Stage Walls,A-6-S,Footings B-14-S.1-B.14-T.2, Isolated Footings B-11-S1,B
Location when sampled: B14-S.1 Footing
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 72 50-90 Slump or Spread (in.): 6.0 4-6 Unit Wt (#cu ft): 145.2 143.1
Air Temperature (ºF): 60 >40 Air Content (%): 5.5 4.5-7.5 Time Sampled: 1:15 PM
Aggregate Size (in): 3/4 3/4 Batch Time: 12:40 PM Time in Truck: 35 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/06/2021 Technician that received: Henry Sores
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 10/07/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 34,417 2,740 psi Type 2
B 28 10/28/2021 4.00 8.00 12.57 Lab
C 28 10/28/2021 4.00 8.00 12.57 Lab
D 28 10/28/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 10/08/2021
Client: PMA
Date of Sampling: 08/10/2021 Lab Log No.: 15795
Reviewed by: CJ Martens
10/08/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 73
Design Strength (psi): 3,500 @56
days Ticket#: 31339
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Building C and B
Location when sampled: C18/E
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 71 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.7 143.1
Air Temperature (ºF): 70 >40 Air Content (%): 5.7 4.5-7.5 Time Sampled: 7:45 AM
Aggregate Size (in): 3/4 N/A Batch Time: 7:00 AM Time in Truck: 45 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 08/11/2021 Technician that received: John Lydstone
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 08/17/2021 Max Nabulsi 4.00 8.00 12.57 Lab 37,275 2,970 psi Type 5
B 28 09/07/2021 Henry Soares 4.00 8.00 12.57 Lab 42,705 3,400 psi Type 2
C 56 10/05/2021 Henry Soares 4.00 8.00 12.57 Lab 44,202 3,520 psi Type 2
D 56 10/05/2021 Henry Soares 4.00 8.00 12.57 Lab 43,062 3,430 psi Type 2
E 56 10/05/2021 Henry Soares 4.00 8.00 12.57 Lab 46,004 3,660 psi Type 5
MEETS DESIGN STRENGTH
56 Day Avg.:3,540 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory. Low 28-Day Indication Compression Test; 56-Day Average
met the design strength.