Loading...
HomeMy WebLinkAboutEng letter of compliance 83-2060 for reference E. T. Eisenhaure Engineering & Land Surveying 5 Codman Road Hingham, MA 02043 Tel: (617) 594-7932 December 31, 2018 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664-4492 RE: 2 Swordfish Drive, Bulkhead Reconstruction; DEP File# SE83-2060 Dear Commission Members: This letter is to request a Certificate of Compliance with the Order of Conditions for the above referenced project. The Conservation Commission issued the Order of Conditions for this project, on May 23, 2016. The features shown on the site plan filed with the Notice of Intent including the bulkhead, fencing and associated grading and seeding of the disturbed areas, have been completed and are depicted and certified on the plan submitted to the Conservation Commission titled: “As-Built plan of Bulkhead Reconstruction 2 Swordfish Drive Yarmouth, MA December 18, 2018 Scale: 1”=16’”. The site is completely stabilized and is in conformance with the filing. Please contact me at (617)-594-7932 with any questions or concerns you may have regarding this request. Thank you for your consideration in this matter. Sincerely, Edward T. Eisenhaure, PE, PLS