HomeMy WebLinkAboutEng letter of compliance 83-2060 for reference E. T. Eisenhaure
Engineering & Land Surveying
5 Codman Road
Hingham, MA 02043
Tel: (617) 594-7932
December 31, 2018
Town of Yarmouth
Conservation Commission
1146 Route 28
South Yarmouth, MA 02664-4492
RE: 2 Swordfish Drive, Bulkhead Reconstruction; DEP File# SE83-2060
Dear Commission Members:
This letter is to request a Certificate of Compliance with the Order of Conditions for the
above referenced project. The Conservation Commission issued the Order of Conditions
for this project, on May 23, 2016.
The features shown on the site plan filed with the Notice of Intent including the bulkhead,
fencing and associated grading and seeding of the disturbed areas, have been completed
and are depicted and certified on the plan submitted to the Conservation Commission
titled: “As-Built plan of Bulkhead Reconstruction 2 Swordfish Drive Yarmouth, MA
December 18, 2018 Scale: 1”=16’”.
The site is completely stabilized and is in conformance with the filing.
Please contact me at (617)-594-7932 with any questions or concerns you may have
regarding this request.
Thank you for your consideration in this matter.
Sincerely,
Edward T. Eisenhaure, PE, PLS