Loading...
HomeMy WebLinkAboutEngineer Plans - 2021_OW ST EXISTING CONTOUR: - - - - PROPOSEDCONTOUR: EXISTINGSPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: TEST HOLE: * UTILITY POLE: -O- FENCE LINE: LOCUS HYDRANT:... RETAINING WALL: e� ASSESSORS MAP: 42 PARCEL:1 PLAN BOOK: 152, PAGE: 43 2nd BENCHMARK AT CONCRETE BOUND ELEVATION =102.03 102 34.5' LEACHAREA DETAIL J SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 BEDROOMSAT 110 GAL/DAY= 330 GAL/DAY SEPTIC TANK:. 330 GAL / DAY x 2 DAYS = 660 GAL USE 1000 GALLON SEPTIC TANK (EXISTING) LEACHING AREA: USE 5 -125 GALLON CHAMBERS (6.1'x Tx 12" EFF. DEPTH) WITH 4' OF STONE AROUND SIDES AND 2' AT ENDS (34.5' x 11' x 12" DEEP) SIDE AREA: (34.5' + 117 x 2 x. t = 91 SF (0.74) = 67 GAL/DAY BOTTOMAREA: 34.5' x i t' = 379 SF (0.74) = 280 GAUDAY CAPACITY - 347 GAUDAY REQUIRED VARIANCE FROM TITLE FIVE: t SECTION 15.212: LEACH AREA TO BE LESS THAN 5' ABOVE GROUNDWATER (VARIANCE OF 0.4'). BENCHMARKAT RIGHT CORNER OF BULKHEAD ELEVATION =103.30 '� jtNG NK S"1 S�Q41G�P 12" twin oak Wa 102 y, IK i "7% DAG 8� . •.. 3g1ty 10330 GP � o d - t 101 � m � I oPNti G 21. N a °? da o 12" Uees \ U) M21-33 E N SEPTIC SYSTEM SECTION 1000 GAL SEPTIC TANK TEE SIZES:(TO BE CONFIRMED) INLET: 6" U , 13" DOWN OUTLET: 6" UP, 14" DOWN 1/8" per ft 1/8" per ft D -BOX (6" OF STONE UNDER OR MECHANICALLY COMPACTED) -GAS BAFFLE AT OUTLET TEE TEST HOLE LOGS DECK ENGINEER: THOMAS McLELLAN, P.E. BH I WITNESS: PHIL RENAUD KITCHEN LNDRY DATE: 9-23-21 I BED ROOM PERCOLATION RATE: <2 MIN/IN DINING I BATH USGS GROUND WATER ADJUSTMENT: BT LIVING BED WELL: MIW-29, ZONE: A, ADJ.(AUGUST): 2.4' BED ROOM ROOM ADJUSTED GROUND WATER ELEV.= 93.9 ROOM I EXISTING FLOOR PLAN I ORaised Garden U1 102 01 --101 -I�01 pal Pereait vslid for REPAIR OF SEPTIC SYSTEM ONIJ', due to Mule and Local septic variances. 'Hard tall"NA review,aeA approval is regalri. rAq future ulJihoas/n•auvaUoncralrera sewage G cdihrs ;uullur structuresldwrllipg. Varmnlilh Ilcalth Department APPROVED Osie OCT 13 2021 HEALTH DEPT NOTES: PEASTONE OR FILTER FABRIC 3/4'- 1 1/2" DOUBLE WASHED STONE /-INSPECTION PORT ,ELEV.= 100.33 H D ELEV. 2, 4, 2,4, F- -34.5' x 11' WITH 4 OF STONE AROUND(SIDES AND 4.6 2' AT ENDS (34.5' x 11' x 12" EFF. DEPTH) (H-20) ADLUSTED GROUNDWATER ELEVATION = 93.9 s,ti„n,•+.aar 1 THA ve N N �o O Y m l I BYR 4/1 101.3 0 d 10YR 5B 99.5 -I�01 pal Pereait vslid for REPAIR OF SEPTIC SYSTEM ONIJ', due to Mule and Local septic variances. 'Hard tall"NA review,aeA approval is regalri. rAq future ulJihoas/n•auvaUoncralrera sewage G cdihrs ;uullur structuresldwrllipg. Varmnlilh Ilcalth Department APPROVED Osie OCT 13 2021 HEALTH DEPT NOTES: PEASTONE OR FILTER FABRIC 3/4'- 1 1/2" DOUBLE WASHED STONE /-INSPECTION PORT ,ELEV.= 100.33 H D ELEV. 2, 4, 2,4, F- -34.5' x 11' WITH 4 OF STONE AROUND(SIDES AND 4.6 2' AT ENDS (34.5' x 11' x 12" EFF. DEPTH) (H-20) ADLUSTED GROUNDWATER ELEVATION = 93.9 s,ti„n,•+.aar 1 THA 102.0 ELEV. O/A HORIZON LOAMY SAND I BYR 4/1 101.3 B HORIZON LOAMY SAND 10YR 5B 99.5 C HORIZON I MEDIUM SAND 2.5Y 7/4 PERC AT 42" OBSERVED, _ 191.5 1, VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE40 - 4" PVC PIPE TO BE -USED. THROUGHOUT SEPTIC SYSTEM. - - --- 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION., 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONEOR MORE TOWN DEPARTMENTS AND 13. EXISTING FLOWDIFFUSORS ARE TO BE ABANDONED IN PLACE.. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. J. CIVIL No. 36471 1I V 11 THOMAS J. MCLELLAN, P.E. SITE PLAN LOCATION: 64 EVERGREEN ST., S. YARMOUTH" MA PREPARED FOR: DONALD PETERSON r• o_��_o, SCALE: 1" = 29 BASS RIVER ENGINEERING P.O. BOX 1163, EAST DENNIS, MA 02641 508-3649048