Loading...
HomeMy WebLinkAboutEngineer Plans - 2021LOCUS MAP TOP OF FOUNDATION EL. 14.59' ��IITI' ILII N EL 11.E SECTION DETAIL COMPONENTS NOT TO SCALE EXISTINGEL. PROPOSED PROPOSED 12.T± SEPTIC TANK � DISTRIBUTION BOX SOIL ABSORPTION SYSTEM EL. LHMblo J EXISTING1,000 GALLON LJ EL. 11.2 SEPTIC TANK j NOT TO SCALE L. -J 4. INSTALL GAS BAFFLE AT OUTLET DESIGN CALCULATIONS INSPECTION FLOW RATE - PORT 12.83' 4' :. 3 BEDROOM DWELLING = 330 G/P/D REQUIRED �. TYP. 5' FLOOD ZONE AE (110 G/P/D PER BEDROOM x 3 BEDROOMS) vv'-\ EXCAVATION..(EL. 11') NO GARBAGE GRINDER ALLOWED / f FLOW (SCALED FROM FEMA NFHL.VIEWER)� EXISTING SEPTIC TANK + 1/BARRIER ® e 330 G/P/D x 2 = 660 G/P/D REQUIRED 1 ) DISTRIBUTION USE EXISTING 1000 GALLON. SEPTIC TANK I 0 I LINE TYP DWELLING PROPOSED SOIL ABSORPTION SYSTEM- I / / WATER PERS RATE _ <2 MIN/IN - CLASS I SOIL j 1 BENCHMARK / . SHUT-OFF I.P. SIDEWALL = (24 + 12.83)(2)(2) = 147.32 S.F. - 1 O -T --DISTRIBUTION TOP OF SURVEY H BOTTOM: (24)(12.83) = 307.92 S.F. I BOX - EL. 11.40' M.S.L.± \ (147.32 + 307.92)(0.74) = 336.87 G/P/D PROVIDED 1 I 9.70' 11 USE: (2) 500 GALLON LEACH CHAMBERS W/ STONE LEACH / AS SHOWN IN DETAIL. j �' PCL. 69 J � L-- CHAMBER TYP. / - 00 DEEP HOLE DATA S.A.S. DETAIL s • N �2 000D' I PROPOSED. L -, DRIVEWAY PERFORMED BY: JASON C. ELLIS, R.S_ S.ES.A.S. WITNESSED BY: PHILLIP. RENAUD, YARMOUTH BOH APPROX. PCL. 59 ,• TH#1 TEST DATE: SEPTEMBER $ 2021 EX(REMOVE)ISTING A S �e �k 12 --DEPTH .I 1 0.00 EE. q_' T"` „ 8' • 7 113' E,XISnNG 1 o DWELLING CF F1i a1^' TL'4 'd /• 1 f:. ' I O DLL M7CN,EL '� / O .r: I T.b.FDN.= o 1.25' 10.15 j ry ,-p �� A c' `� EL. 14.59' �L._ LOAMY SAND J LADUE +n PCL.. 60 O O, -.y' DECK 1oYR4/4 e.9` No 37r,6070 z I I I LOT 11 q T 4,893 S.F.± LOAMY SAND 1OYR5 6 2.5'-/ a.9' ww� F�3 101 --ice GP -EXISTING -�-� INE $AND / t J o SHED MEDIUM --SEPTIC TANK (TO REMAIN).. 12p2p0•6 PERC ®30' <z MIN./IN. N WELLING 11.25'D.1 s' GROUND WATER MICHAEL LADUE, P.L:S. ENCOUNTERED ® 114" (EL. 1.9') LADUE LAND SURVEYING PCL. 67 VARIANCE REQUESTS: 1 i IOF MPCL. 61 qS 310 CMR 15.211 SURVEY PLAN REFERENCE: PROPERTY OWNER AND 9,qt 1. 5' FROM PROPOSED S.A.S. TO LOT LINE (PCL. 69} PLAN BOOK 56 PAGE 85 CONTRACTORS TO VERIFY ASON "fG. (10' REQUIRED, 5' PROVIDED, 5' VARIANCE REQUESTED THIS PLAN IS FOR SEPTIC SYSTEM ALL WATER LINES AND GAS CH .TSTOPHER um ) DESIGN PURPOSES ONLY. UTILITIES ON PROPERTY. 2. 2' FROM PROPOSED S.A.S. TO LOT LINE (PCL. 60) ELLIS N (10' REQUIRED, 8' PROVIDED, 2' VARIANCE REQUESTED). 310 CMR 15.255 (5) 15. INSTALL 40 MIL POLY FLOW BARRIER AS SHOWN AROUND S.A.S. 3. MODIFY CONSTRUCTION IN FILL - LESS THAN 5' AROUND S.A.S. IN AREA OF EXISTING SHED. FROM EL. 12.0' DOWN TO EL. 9:0'. *i II,A4:1 Pei 3.10 CMR .15.212 (/)() 1 b 18: J.C. ELLIS DESIGN CO. INC. TO CERTIFY THE SOILS AFTER REMOVAL l OF EXISTING S.A.S. AND TO CERTIFY SYSTEM AFTER INSTALLATION. 4. PROPOSED LEACH AREA TO BE 4.7' ABOVE ADJUSTED 17. CONTRACTOR TO LOCATE AND VERIFY ALL EXISTING PIPE INVERT JASON C. ELLI R. S, HIGH GROUNDWATER LEVEL. (5' REQUIRED, 4.7' PROVIDED, ELEVATIONS PRIOR TO CONSTRUCTION. 0.3' VARIANCE REQUESTED). - (2) 500 GALLON. LEACH CHAMBERS r n=rl -I III -I I I� I� I_ ITI I1=I 11-111=1I. E 11 1 1 III -I L aEe• _111.-111 C0 11-111 11711-111�1I lel L RADE '. 2" OF 1/8' TO 1/2" W/IN 8' DOUBLE WASHED PEASTONE� OF GRADE _ r3 EL. 11.13' z1o' EL. 11.0 1 3/4" TO 1 1/2- 24' LONG x 12.83'. WIDE x 2' DEEP } DOUBLE WASHED STONE 4.7 EL. 9.0' EL OBS. = 1.9' EI_ ADJ. - 4.3' + 17 GROUND WATER ELEVATION REFERENCE WELL = MIW-29 ZONE A BENCHMARK AUGUST 2021 LEVEL 9.29' TOP OF MAG. NAIL EL 11.11' M.S.L.± ADJUSTMENT FACTOR _ 2.4' CITES s ' i ALL PRECAST COMPONENTS TO. BE H-10 RATED. ALL. COMPONENTS WITH ANY .ANTICIPATED VEHICULAR TRAFFIC w TO BE. H-20 RATED. ELEVATION DATUM IS FROM USGS QUAD MAP. .� $ d .. THIS PROPERTY IS SERVED BY MUNICIPAL WATER.. r E A \ ALL CONSTRUCTION TO CONFORM WITH 310 CMR 15.000 c 9 a r 1 AND ALL OTHER. APPLICABLE LOCAL, STATE AND FEDERAL y,1 dy 1�1 i. O CODES AND REGULATIONS. INSTALLER/CONTRACTOR TO REVIEW &. VERIFY ALL e 8 aELEVATIONS OrT AND DETAILS AND REPORT ANY DISCREPANCIES Lmw a O TO DESIGNER PRIOR TO CONSTRUCTION OR ASSUME ALL. '00000 RESPONSIBILITY. 3 9 IZI INSTIS RALLONSIBLE FOR MAINTAINING t c e Qy SAFE WORK AREA, VER FINGR UTILITIES AND DIG SAFE PRIOR TO CONSTRUCTION. w. m H E 7 ANY CHANGES TO OR. .DEVIATIONS FROM THIS PLAN MUST = BE APPROVED IN WRITING BY J.C. ELLIS DESIGN CO. AND v >BOARD OF HEALTH. e a 8 FINISH COVER OVER COMPONENTS. IS NOT TO EXCEED 3' ' PER 310 CMR 15.000,. �, ALL ABANDONED SEPTIC SYSTEM COMPONENTS TO BE PUMPED DRY AND REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. a ALL COMPONENTS TO SE..PROVIDED WITH WATERTIGHT ACCESS PORTS WITHIN 6" OF FINISH GRADE. 11. ALL SEPTIC TANKS, DISTRIBUTION BOXES AND PIPING TO INSTALLED WATERTIGHT. iBE 12. NO KNOWN WELLS EXIST WITHIN 100' OF PROPOSED LEACH AREA.- �' �s15�311�1"Ls L7 13 EXCAVATE L UNSUITABLE O DER DDOWN SC NECESSARY, 5' AROUND UNIL AND.A S.S TO LAYER I _ - AND REPLACE WITH CLEAN MEDIUM SAND. OCT 14 2021 4 CH AREA TO BE PROVID WITH AT LEAST NE INSPECTION PORT CONSISTING OF A PERFORATED FOUR INCH PIPE PLACED VERTICALLY DOWN INTO THE STONE TO THE NATURALLY OCCURING SOIL OR SAND FILL BELOW THE STONE. HEALTH DEPT. THE PIPE SHALL BE CAPPED WITH A SCREW TYPE CAP AND ACCESSIBLE WITHIN 3" OF GRADE. SEPTIC SYSTEM UPGRADE PIAN J.C. ELLIS DESIGN SUBJECT: 13 FRANK BAKER ROAD YARMOUTH, MA m IW PREPARED FOR: U MARIE PANCZYCK 797 ROUTE 28 SOUTH YARMOUTH, MA 02664 ASSESSOR'S -`- P.O BOX51'-_--- MAP 33 PARCEL. 68 ----- SCALE: 1" 20' NORTH EASTHAM, MA 02651 (508)240-2220 Email: joson@jcellisdesign.com DATE: SEPTEMBER 8, 2021 SHEET 1 OF 1