Loading...
HomeMy WebLinkAbout17030_OR005 COMPANY LLP 10 Waterchase Rocky Hill, Office: Fax: Drive CT 06067 (860) 563-3820 (860) 563-3860 GIRARD AND STRUCTURAL ENGINEERS girardco.com Field Observation Report - 05 October 20, 2021 Attn: Daniel Colli, AIA Perkins Eastman Boston, MA 02110 Re: Site Visit – October 7, 2021 Dennis Yarmouth Intermediate Middle School Yarmouth, MA On Wednesday, October 7, 2021, our office visited the job site to observe the construction progress for the Dennis Yarmouth Intermediate Middle School. The Construction trades working this day included Concrete, Steel, plumbing, and Site contractors. During the visit, I spoke with representatives from Commodore Builders and PMA. Building earthwork continues with underslab stone placed in area D, rough backfill in areas C, B, A, and stone placed in the Gym. Concrete installation for walls and footings is nearing completion. Concrete is being placed today in Area A. Removal of formwork is taking place in area B. The repair to the misplaced exterior wall at the Area B East entry is completed. Steel erection in the Gym is taking place today, one long span truss is installed at line K.8 with secondary trusses framed to line J.7. The primary steel frame in areas C and D is in place with roof joist installation progressing. The floor deck is in place in both areas, and roof decking is being installed in area D. Shear connectors are in the process of being installed in area C. There are two spans of Side lap deck connections that were not complete near the West connector on the area C decking. This was brought to the attention of the steel erector. In general, the work observed appears in conformance with standard industry practice. Other than the items noted above, there were no apparent deficiencies noted. Respectfully, Girard and Company, LLP Kenneth P. Anderson, PE Field observations performed by Girard and Company, LLP are not detailed inspections and do not relieve the contractor from their obligations under the construction contract, including but not limited to the construction means and methods and job site safety. The purpose of the field observations is to verify that the progress of work is in general conformance with the contract documents. file: H:\2017\17-030 Dennis Yarmouth MS\Construction Control\OR\17030_OR005.docx Field Observation Report - 05 Dennis Yarmouth Intermediate Middle School Yarmouth, MA Page: 2 of 2 Girard and Company, LLP October 20, 2021 Photographs – 10/7/2021 Gym Trusses Area B foundations and backfilling Area B - Foundations Area C – Second-floor deck and roof framing