HomeMy WebLinkAbout18CONSTRUCTION NOTES
El,
Layer Sag, Class
Soil Color
0-6"
50.3
TOP OF FOUNDATION
MINIMUM
20" DIAMETER COVERS
OBSERVATION PORT
1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000):
EL = 51.9
RAISED TO
WITHIN 6" OF FINISH GRADE
RAISED TO WITHIN
STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND
(OR AS NOTED)
6" OF FINISH GRADE
EXPANSION OF ON: -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS.
EL = 50.7
EL = 49.0
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20v'�`
{ ". %\�%�
: �� :,•',�
'' �� j� '�,'%
, ,�_ f \' / q
I 1
LOADING. IF UNDER AN IMPERIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
��r/• \�
l
X �f•.�
p f 6" Sch 40 PVC
3.) TO MINIMIZE UNEVEN SETTUNG, SEPTIC TANKS AND D -BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED BASE ON SIXINCHESOF CRUSHED STONE.
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND
THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6 OF FINAL GRADE. LEACHING
FIELDS, TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED
VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM WITH CAP, TIED WITH MAGNETIC
MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A 489
MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK, Exist
AND NOT LESS THAN 1% OTHERWISE.
6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS NOTED.
7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTION.
8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDER TO PROVIDE A WATERTIGHT SEAL.
9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE
DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM.
III11I000000.) IN ACCORDANCE WITH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
AGNETIC MARKING TAPE.
1.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 150' OF THE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF
THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM,
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN, ANY CHANGES SHALL BE APPROVED IN WRITING BY THE ENGINEER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT
AND THE APPROVED PLANS. 48 HOURS ADVANCE NOTICE IS REQUESTED.
15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO
COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGSAFE,
ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT.
16.) CONTRACTOR SMALL VERIFY THAT ALL WASTEUNES ARE CONNECTED BY WATER TESTING
WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS,
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY
SEPTIC SYSTEM COMPONENTS.
18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE
ARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF
OILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE
OILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
9.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REQUIRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING.
T'1
48.2
O
13'± 4
49.4
47:3
✓ 4/OZ / DB -3
GAS BAFFLE H-20 Rated
�-
D-13 OX 45.6
EXISTING k -3o'±
1,000 GALLON
SEPTIC TANK FLOW PROFILE
NOT TO SCALE
Test Hae 1 (EL=50.8±) TEST HOLE LOGS
Depth
El,
Layer Sag, Class
Soil Color
0-6"
50.3
A/E Laamy Sand
IOYR3/2
6"-36"
47.8
B Loomy Sand
10YR5/6
36"-123"
40.6
C Medium
Sand
2.5Y6J5
Test Hole 2 (EL_=50.ftjl
Depth
Elev.
Layer Soo Class
Sail Color
0-6"
50,3
A/E Loamy Sand
IOYR3/2
6"-36"
47.8
B Loamy Sand
t0YR5/6
36"-123"
40.6
C MSodnd '
2.5Y6/5
DATE OF TESTING: 12/04/20
SOIL EVALUATOR: DAVID FLAHERTY JR
WITNESS: MALLORY LANGLER YARMOUTH HEALTH AGENT
PERCOLATION RATE: LESS THAN < 2 MIN/INCH
NO GROUNDWATER ENCOUNTERED
Inspection Notes
PRIOR TO FINAL INSPECTION BY THE ENGINEER, SYSTEM D -BOX
NEEDS TO BE COMPLETE. INCLUDING BUILDUP FOR COVERS,
_LE
;•
Jerforoted
Sch 40 PVC
GEOTEXTILE
" SCHEDULED - 40 PVC SET AT .005 SLO
ON 6" DOUBLE WASHED 3/4" - 1 1/2" ST
45.6
28.0' Ho,.
5,0' I
LEACH FIELD
(SIDE VIEW)
EL = 40.6 Bottom of test
SYSTEM DESIGN CALCULATIONS
SEWAGE DESIGN FLOW REQUIRED: EXISTING 2 BEDROOM DWELLING
110 GPD / BEDROOM = 220 GPD REQUIRED
MINIMUM DESIGN REQUIRED: 330 GPD
SEWAGE DESIGN FLOW PROVIDED: THREE (3) SCH 40 PERFORATED
PIPES IN 16' X 28' LEACHING 6" DEEP SiBED
Vt = 28 .0 x 16.0 = 448 SF x .74 4 33 GPD PROVIDED
331 GPD PROVIDED > 22C GPD REOU
SEPTIC TANK CAPACITY REQUIRED: 220 GPO X 200 = 440 GPD
SEPTIC TANK CAPACITY PROVIDEO: EXISTING 1,000 GALLON SEPTIC TANK
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW
Observation Port
PLAN VIEW
N.T.S.
B.
MORE
No. 39398
7 /
oposed Site and Septic Plan
owhead
Prepared by:
Mike Karras
18 Arrowhead Drive
Yarmouth Port, MA
Drive Yarmouth Port, MA
Prepared by.
All Cope Septic and Survey
618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
alicapeseptic@gmoil.com