HomeMy WebLinkAboutEngineer Plans - 2021E LEGEND -- 99- EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. -[99}-^- PROPOSED CONTOUR [98.4] PROPOSED. SPOT EL. TTH11 0" +�} TEST HOLE 2� SLOPE OF GROUND 0r UTILITY POLE FIRE HYDRANT Ni NOT ALL SYMBOLS MAY APPEAR IN. DRAWING Yarmouth Conservation Conditions: 1. A hard copy of the plan shall be provided to the Conservation Administrator for review. An electronic copyof the final plan shall be provided to kgrant@yarmouth:ma.us. 2. The proposed sewage disposal system shall meet the applicable Title 5 wetlands setbacks as set forth by the Health Department. 3. A'work limit' line shall be established with Erosion Controls (i.e _ straw bales, staked filter fabric, bark mulch, 'silt sacks,' products made with rice straw, and other weed -free products or approved by the. Commission.) Hay bales are not allowed. It is the applicant's responsibility to implement and maintainappropriateand adequate erosion controls measures throughout the construction process. 4. No work of any kind shall occur on the. Resource Area side of the work .limit line. This line shall be established prior to any construction or work. 5. All imported fill shall be clean and not contain any foreign debris such as cement, bituminous concrete, rubber, metal, trash, boulders, etc. 6. Debris, including litter, shall be picked up immediately. Any excess material that is excavated fromthejob site shall be disposed of at a location approved by the Conservation Administrator or in a covered dumpster, No debris shall be allowed in a Wetland or Waterway. 7. Washing of equipment/tools shall be done OFF-SITE or handled in a manner approved by the Conservation Administrator. 8. No equipment shall be refueled, nor shall fuel be stored within 100 feet of a resource area. 9. The cesspool is to be pumped dry, the connection broken, and - filled with clean sand. 10. Any area that is disturbed during. construction shall be revegetated immediately or as soon after as the growing season commences. Permanent stabilization shall be carded out in order to minimize erosion. TEST HOLE LOGS ENGINEER: DAVE MASON WITNESS: MALLORY LANGLER DATE: 2/24/21 PERC. RATE _ _:�_ 2 MIN INCH CLASS - SOILS 4 ELEV. 1 0" 6_5 -A F-111 0r LS sf 1 CYR 3/1 45" LOCUS IS WITHIN FEMA FLOOD ZONE SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 3 BEDROOMS ® 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW TIGHT TANK: 330 GPD (5) = 1650 MIN. 2000 GAL TIGHT TANK CAPACITY REQUIRED USE A H-20 3000 GAL TIGHT TANK APPROVED I DATE NOTE: CONTRACTOR TO PROVIDE CONSERVATION AGENT WITH A DE -WATERING PLAN (UTILIZING SILT CONTAINMENT BAGS) PRIOR TO THE START OF CONSTRUCTION. C MS GROUNDWATER ADJ. DATA: PERC WELL: MW 29 ICYR 7/4 ZONE: B ADJUSTMENT: 2.8' (FEB. '21) 120" I -3.5' G.W. ENCOUNTERED AT EL. 4.5' DEC DCE #21-208 MA BOARD OF HEALTH TEST HOLE LOGS ENGINEER: RON CADILLAC WITNESS: BRUCE MURPHY DATE: 7/6/05 Raufe PERC. RATE _ < 2 MIN/INCH CLASS I SOILS ELEV. F-111 0r 8.0' FILL 62" E LS 76" 5Y 3/1 1.67' P EAT 102"1 11-0.5' C PERC LS 5YR 4/5 150" 1 -4.5' G.W. ENCOUNTERED AT EL. 3.42' BUOYANCY CALCS: H-20 3000 GAL. ST WEIGHS 37,000 LBS 6.0' x 17.0 x 7.0 X 52.4 = 44,554 LBS UPLIFT ADDITIONAL POURED CONCRETE BALLAST IS REQUIRED (44,554 LBS 37,000 LBS=7554 LBS 0150LBS/CF = 50.4 CF REQUIRED) ADD 51 CF CONCRETE BALLAST SYSTEM PROFILE (NOT TO SCALE) ADD A MINIMUM OF 51 CF POURED CONCRETE FOR BALLAST OVER THE TOP EXISTING TOF EL 8.T AND SIDES; MAINTAIN ALL ACCESS COVERS MINIMUM .75' OF COVER OVER PRECAST - INV. IN 6.3 3000 GAL.. H-20 S/T 3/5 TOTAL CAPACITY ALARM ON 31" EL. 1.3' NOTES NORMAL HIGH WATER LEVEL ALARM 1: DATUM IS NAVD 88 (AUDIBLE AND VISUAL) TO BE SET FOR 2. MUNICIPAL WATER IS EXISTING 3/5 OF SYSTEM. CAPACITY, ALARM AND PRESS TO SILENCE SWITCH ON PANEL INSIDE BUILDING.LOW VOLTAGE FLOATS, 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. . SIMPLEX PANELS, MEYERS OR EQUAL. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST PROP. 24" 0 CAST UNITS TO BE AASHO H-ZQ IRON WATERTIGHT 5. PIPE JOINTS TO BE MADE WATERTIGHT. COVER TO GRADE 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7.55' 7. THTO FOR RTE BE USED LINED WORK ONLY AND NOSTAKING OR ANY 7.3' ADJUSTED OTHER PURPOSE. GROUNDWATER 8, PIPE FOR SEPTIC SYSTEM TO SCH. 40-4' PVC: 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR *NOTE: INTERIOR PLUMBING TO BE RAISEDANDRE-ROUTED _ TIGHT TANK TO EXIT THE DWELLING IN LOCATION SHOWN ON PLAN VIEW: PLUMBER TO CONFIRM FEASIBILITY PRIOR TO INSTALLING ANY 2 (NOT TO SCALP) PORTION OF THE SEPTIC SYSTEM (_% SLOPE)MIN. WATERPROOF/WATERTIGHT FOUNDATION 10' TIGHT TANK CALLING DIGSAFE (1-888-344-7233) AND 6" CRUSHED STONE OR MECHANICAL VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF Raufe COMPACTION. (75.227 [2]) WORK. F� c o°' I 11. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN ASSESSORS MAP 22 PARCEL 180 sf 12. INSTALLER TO VERIFY THE ELECTRICAL SYSTEM LOCUS IS WITHIN FEMA FLOOD ZONE IS SUITABLE FOR ALARM CONNECTION. ELECTRICAL AE (EL. 11) AS SHOWN ON �� Dy C C9Gtn e aces Locu P �; TIGHT TANK. PROVIDE SILT CONTAINMENT AS e NECESSARY. C Lewis O Ol Bay TIGHT TANK NOTE S: /"� t7 TANK SYSTEM SHALL BE ABANDONED/REMOVED. A'odia AN OPERATIONS AND MAINTENANCE PLAN WILL CALLING DIGSAFE (1-888-344-7233) AND 6" CRUSHED STONE OR MECHANICAL VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF LOCUS MAP COMPACTION. (75.227 [2]) WORK. SCALE 1"=2000'± 11. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN ASSESSORS MAP 22 PARCEL 180 SAND. 12. INSTALLER TO VERIFY THE ELECTRICAL SYSTEM LOCUS IS WITHIN FEMA FLOOD ZONE IS SUITABLE FOR ALARM CONNECTION. ELECTRICAL AE (EL. 11) AS SHOWN ON PERMIT REQUIRED. COMMUNITY PANEL#25001C0588J 13. DEWATERING REQUIRED FOR INSTALLATION OF DATED 7/16/2014 TIGHT TANK. PROVIDE SILT CONTAINMENT AS NECESSARY. 14. WHEN SEWER SYSTEM BECOMES AVAILABLE, THE OWNER SHALL CONNECT A SEWER AND TIGHT TIGHT TANK NOTE S: /"� t7 TANK SYSTEM SHALL BE ABANDONED/REMOVED. AN OPERATIONS AND MAINTENANCE PLAN WILL BE REQUIRED FOR THE LIFE OF THE SYSTEM. ALARM TO ACTIVATE AT 3/5 HOLDING CAPACITY. TANKS TO BE PUMPED AS REQUIRED AND ALARM TO BE INSPECTED 1 TIME PER YEAR. TIGHT TANK SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH 310 CMR 15.260, AS AMENDED. SUNROOM DIN/NG KITCHEN BATH BEDROOM ROOM LIVING BEDROOM ROOM BEDROOM OF T� /<�JANIELq �. CIVIL �' 46502 EXIST -ING FLOOR PLAN I, o/F-L_,tr` -7. VARIANCES REQUESTED: UNDER MAX. FEASIBLE COMPLIANCE 15.405: (1j) REDUCTION OF THE REQUIREMENT OF A 12 INCH SEPARATION BETWEEN THE INLET AND OUTLET TEES AND HIGH GROUNDWATER. (12" to 0") (PROVIDE WATERTIGHT BOOTS) Permitvalid for REPAIR Or SEPTIC SYSTEM ONLY, due to State and Local septic variances. Board of Health re, lew and approval is required for any future additionstrenoval iunsla Iterations. to sewage facilities and/or structuresfdsveiling: Yarmouth health Department APPROVED 6TZ:3110< 44-3 N /o ?®z/ Name Date TITLE 5 SITE PLAN OF 31 BAYBERRY RD. WEST YARMOUTH, MA PREPARED FOR 77177-]YANA VILENCHIK UL,I LH LUL! DATE: SEPTEMBER 7, 2021 HEALTH Deft EV: OCTOBER 12, 2021 (DE -WATERING NOTE) Scale:1 "= 20' A 0 10 20 30 40 50 FEET I off 508-362-4541 fax 508-362-9880 downcape.com down cape engineeting, iac. civil engineers _ land surveyors 939 Moin Street ( Rte 6A) DATE DANIEL A. OJALA, P.E., P.L.S. YARMOUTHPORT MA 0257.5 21-208 VILENCHIK.DWG