Loading...
HomeMy WebLinkAboutEngineer Plans - 2000DEEP OBSERVATION HOLE LOGS NO SCALE DEEP OBSERVATION HOLE 1 EL = 32.01 DEPTH FROM SURFACE SOIL HORIZON SOIL TEXTURE SOIL COLOR MUNSELL SOIL MOTTLING OTHER 0" - 4" 0 # 100 0%-20% # 200 LEAF LITTER e - 10" A LOAMY SAND 10 YR 3/1 NONE 19 INCHES 10" - 35" B LOAMY SAND 7.5 YR 3/4 NONE 29 INCHES 35" - 138" C SAND 10 YR 5/6 NONE FINE TO MEDIUM ,d/, SPARTINA ALTERNIFLORA - SPARTINA PATENS SAND, LOOSE N/F ROU F, BASS RIVER BLUE ROCK LANDING ASSOCIATION ASSESSORS MAP 102 PARCEL 11 EXIT 9 COASTAL engineering co" PER 250 Cranberry Hwy. Orleans, MA 02653 Cot RD .>508-255-5511 508.255.6511 P 508.255.6700 F / / N 56 556 OAK / \ q LOCUS , J I 100' OFFSET FROM MHW / / \� PERC AT 32" (TOP OF HOLE) 112 NO GROUNDWAT✓rR ENCOUNTERED PROPOSED LIMIT OF WORK AND j ` / -- � f � � \ / / q SEDIMENT BARRIER PROPC'SED \ 14' OAK \ j / \ ` \ AEYARMOUTH, MA REV 1 ' REV iPROPRSNSE STDOTA ON WA WAY -m'- DATE OF TESTS: MAY 5, 202, / —�' - \\ y jj \ (REMOVE) - KEY MAP PERCOLATION RA AN 2 MINUTES PER INCH DROP IN SOIL NOTE EXISTING GENERA R AND GENERATOR PAD To BE L — / \\\\ P, EPLACED WITN NEW G6 .BATOR AND GENERATOR PAD / 6-- THE C HORIZON I � \ ,a N DOH 1 _ / OAK \ # / 1 AT THE START OF CONSTRUCTION D PRIOR TO SETTING ANY PROPei / \� _ \ / \ \ \ WITNESSED BY : JOHN G. SCHNAIBLE, CEC � EXISTING SEWAGE DISPOSAL SYSTEM fxAINING / / �PROPt�iSEIdE S \ (REMOVE) MALLORY LANGLER, HEALTH AGENT COMPONENT OF THE SEWAGE DISP0 AL SYSTEM, THE TO BE REMOVED AND FILLED � \ r FL E \ /�_��— ON /PATIO \\.. NO GROUNDWATER ENCOUNTERED CONTRACTOR SHALL VERIFY (IN THE1 PRESENCE OF THE / EL=22.01 < \ m OAK % HEALTH DEPARTMENT AND ENGINEER) THAT 4' OF NATURALLY K 1PAtio / i _ \ �,r PINE \x OCCURRING SAND EXISTS BELOW THE BOTTOMS OF THE SAS. �\ PROPOSED \ 4 -DECK" PINE / \ \ 170\ 18• PINE- \ \ 12' 4\ PINE X16.7\ \ \ SITE BENCHMARK: i / '22\ \ \ \ \ DESIGN CALCULATIONS TDP OF CONCRETE BOUND 'r:CPOSE(f Gf' -- f ,^; ...�.a\ / \ \ - \ \7? \ : \%� \ 8.OAK \ \ EL.=25.93 (NAVD88) BUILDING 22 - �\ \ - ' �" /..l \ \ \ \1O PINE - :9DDITION �, r ;\: \ I NX(ITING DECK AND PORTION OF -� �� ` EXIS TNG DWELLING i0 BE \ *61NE {DESIGN FLOW - t\/ \ \. o° oax5 BEDROOMS (EXISTING) AT 110 GAL PER DAY PER BEDROOM = 550 GPD \ i —\ \ '�/ �9 \ \ 550 GPD X 200% = 1100 GALLONS - USE 1500 GALLON SEPTIC TANK MIN. ALLOWED / - �� �' s 24 x2 .- \ //V' i \\.\ \\ \\ •OAK �j \T.r�OO 14 OA \ \ \\ .\ A 42 L. x 13 W. x 2 EFFECTIVE DEPTH LEACHING CHAMBER CAN LEACH. \ _ �� s NQS \ \\ \ r\ �� �o \ \ W Vt = 42 (2) (2) (.74) + 42 (13) (.74) + 13 (2) (2) (.74) = 566.8 GPD E, x20.7\` \� \m'oAK �9syF \� 1 OAK INSTALL. ONE (1) - 42 'L x 13 'W. x 2 'EFFECTIVE DEPTH LEACHING CHAMBER, Vt = 566.8 GPD > 550 GPD REQ'D. � v._, - _ \\ I /� / \ \ xn.i \\ \ ia~ \ AVEN ONE { 1) 1500 GAL SEPTIC TANK, MINIMUM ALLOWED C \ W ` _ P8 / \ \ \ \ \ \ \ ONE ( 1) - DISTRIBUTION BOX ( 9 OUTLET) ��\� y1•rt \ s Pr,E \ \\ CONSTRUCTION NOTES 1) GARBAGE GRINDERS ARE NOT ALLOWED WITH THIS DESIGN. 2) THE INSTALLER IS RESPONSIBLE FOR ASSURING THAT COMPONENTS OF THE SEWAGE DISPOSAL SYSTEM ARE DESIGNED WITH SUFFICIENT STRENGTH TO SUSTAIN ALL LOADS TO BE IMPOSED ON THEM. ANY COMPONENT OF THE SYSTEM SUBJECT TO VEHICULAR TRAFFIC MUST COMPLY WITH A MINIMUM STANDARD OF A.A.S.H.T.O. H-20 WHEEL LOADS. 3) PRIOR TO SETTING ANY SEWAGE DISPOSAL SYSTEM COMPONENT, INSTALLER SHALL VERIFY EXISTING CONDITIONS, INCLUDING ELEVATIONS OF EXIT INVERTS, AND REPORT ANY DISCREPANCIES TO THE DESIGN ENGINEER. 4) ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA. SCH 40 PVC SHALL BE 0.01 FT/FT. 5) NO PART OF THIS DESIGN SHALL BE ALTERED WITHOUT PRIOR APPROVAL FROM THE DESIGN ENGINEER AND THE AGENT OF THE LOCAL BOARD OF HEALTH. ALL REQUESTS FOR CHANGES SHALL BE MADE IN WRITING PRIOR TO CONSTRUCTION. 6) THE USE OF ALTERNATE MANUFACTURERS FOR SYSTEM COMPONENTS SHALL NOT BE APPROVED IF THE USE OF THEIR EQUIPMENT REQUIRES CHANGES 1N DESIGN. 7) THE INSTALLER SHALL ASCERTAIN THE LOCATION OF EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATION, AND SHALL PROTECT UTILITIES WITHIN THE WORK AREA DURING CONSTRUCTION. 8) THE EXISTING SEWAGE DISPOSAL SYSTEM (INCLUDING CESSPOOLS) SHALL BE PUMPED, FILLED WITH SAND, AND ABANDONED; OR SHALL BE REMOVED WITH SURROUNDING CONTAMINATED SOILS AND BACKFILLED WITH CLEAN COARSE SAND. 9) ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. IF APPLICABLE: 10) FILL MATERIAL FOR SYSTEMS CONSTRUCTED IN FILL SHALL BE CLEAN GRANULAR SAND, FREE OF ORGANIC MATTER AND OTHER DELETERIOUS MATERIALS. THE SAND SHALL BE GRADED SUCH THAT NOT MORE THAN 457. OF THE SAMPLE, BY WEIGHT, SHALL BE RETAINED ON THE #4 SIEVE. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 INCHES. THE MATERIAL THAT PASSES THE #4 SIEVE SHALL MEET THE FOLLOWING GRADATION REQUIREMENTS: TOP OF FOUNDATION EL. = 29.51 4" DIA SCH 40 PVC PIPE OR AS REQUIRED BY MASS PLUMBING CODE HEAVY DUTY "SEAL-TITE" CAST IRON FRAMES AND COVERS TO FINISH GRADE (H-20) SIEVE PERCENT SIZE PASSING # 4 100% # 50 10%100% # 100 0%-20% # 200 0%5% 21" HEAVY DUTY ,SEAL-TITE" CAST IRON FRAME AND COVER TO FINISH GRADE 9" MIN. FLOW 3 MAX. D'BOX MINIMUM D'BOX INSIDE .' � W/RISERDIMENSIONS 12"x12' ROP: 2" min. 3" max. .. 4" DIA SCH 40 PVC PIPE 10 27.00* 26.32 — SEE 26.04 2"-"-' PIPE OR FLOW S �J �� BELOW (MIN.) LEVELER INVERT LIQUID DEPTH 1500 GAL 26.07 ` SEPTIC TANK r 25.87 THE MINIMUM SLOPE FOR ; W/SANITARY ALL r' 29.8 14" OAK. \ i 2' PINE �s" PINE I I ` i .Z — ..:+� S\ \ \ \ 10" OAK ` \ (REMOVEp' I EXISD�.BRAVEL DRIVEWAY \14" OAK / PROPOSED GRAVEL y V A V A 11Y PINE DRIVEWAY .MODIFICATION �,r' r\.,, ./ '✓i \ \ N i I t t,III ' \ \ 6' OAK 1 / I / f 30 \ N 7e0O 0 ))PROPOSED LEACHING SYSTEM 0010'OAK 12" PINE (421 x 1283'W x 2'D) PINE 0 e 8' OAK/ DOy 1 19' OAK GQ IN)(QO (2O /74OA / 18- OAK Ar 'PROPOSED 1500 1 PINE 14' OAK /.. // // f I/ GALLON SEPTIC �. ! - s' NE / / W6 / PROPOSED 4' VENT - - \ 18. OAK �_ — / ( w\ I _ I I / / / • / / / / 6 PROP18. OAK OSED 9 -OUTLET 0✓/ \ D'BOX (N-20) I I 100' FROM TOP OF \ 116' OAK fW7 ,4' o r , COASTAL BANK ' ` \ \ - I I I I I \_ Y / I 200' OFFSET FROM \�`'\ I-� I I R�USSELL�L. POTTER N/F. MHW (RIVERFRONT 50' FROM TOP OF \ _ 1 ' I - I I ASSESSOR MAPi101 SUSAN D. REID AREA) COASTAL BANK - `. _ I I I PARCEL 1811. ASSESSORS MAP 101 14" OAK - PARCEL 174 TOP OF { 1 I i I I I I I I I I l WS I 6355A3 6 COASTAL BANK PLAN 20 10 0 20 60 421 x 13'W x 2'EFF. DEPTH LEACHING GALLERY CONSTRUCTED BY PLACING FOUR (4) - 600 GALLON (6 DIA x 4 -8 H) H-20 LEACH PITS ®10' O.C. WITH S-6" OF STONE ON SIDES AND S -O" OF STONE ON ENDS 24" HEAVY DUTY "SEAL TITE" CAST IRON FRAMES AND COVERS TO FINISH GRADE 2 LAYER OF (SEE PLAN FOR LOCATION) OF 1/8" TO 1/2", STONE 3' MAX. 5— ALL ALL (H-20 RATED) END VIEW LO S LONGEST RUN SCHEMATIC FLOW PROFILE ALL INSTALLATIONS MUST CONFORM TO THE MINIMUM REQUIREMENTS OF TITLE 5 4" DIA. SCH 40 PVC PIPE REV i W/ DOME VENT CAP AND CHARCOAL FILTER MIN J TO 1.r DOUBLE ASHED STONE 0 I i7 2'-0" EFFECTIVE DEPTH DEPTH TO ESTIMATED HIGH GROUNDWATER > 10' DETAIL OF LEACHING CHAMBER NO SCALE 1 inch = 20 & INSPECTION NOTE THE STATE ENVIRONMENTAL CODE, TITLE 5, REQUIRES INSPECTION(S) OF THE SEWAGE DISPOSAL SYSTEM BY THE DESIGN ENGINEER PRIOR TO THE START OF INSTALLATION FOR DISCUSSION ON REQUIRED INSPECTIONS I HEREBY CERTIFY THAT THE EXISTING CONDITIONS SHOWN HEREON ARE LOCATED AS THEY EXISTED ON THE GROUND AS OF 12-20-20. DATE NOVEMBER 9, 2021 NO SCALE PLAN REFERENCES: ASSESSORS MAP 101, PARCEL 13 PLAN BOOK 395, PAGE 50 PLAN BOOK 376, PAGE 82 VIEW CORRIDOR REFERENCE PLAN TITLED: PROPOSED VISTA PRUNING AND LANDSCAPING PREPARED FOR: ROBERT R. ARMSTRONG PREPARED BY: COASTAL ENGINEERING CO., INC. REV. DATE: 10-04-07 REFERENCE ORDER OF CONDITIONS ISSUED TO ARMSTRONG RECORDED: BOOK 22425, PG 32 MA -DEP FILE #: SE 83-1798 G3G( NOV 12 2021, HEALTH DEPT. 2014 FLOOD NOTE: 14 FEMA FLOOD ZONE AE (EL 11) (NAVD 88) AS SHOWN ON FEMA FIRM MAP #25001CO591J EFFECTIVE DATE JULY 16, 2014. DATUM NOTE ELEVATIONS SHOWN HEREON ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD 1988) LEGEND 4" DIA SCH 40 PVC IN *RAISE EXISTING TEES CATCH BASIN COMPACTED BASE LIQUID DEPTH OUTLET TEE DEPTH EXIT ELEVATION SHOWN PIPE IS 1/8" PER FT BELOW FLOW LINE o (H-20 RATED) 14 INCHES W/ 6" LAYER OF (H-20 RATED) 19 INCHES - 6 FT 24 INCHES EDGE OF MARSH 7 FT 29 INCHES CRUSHED. STONE MLW UPLAND GRASS ,d/, SPARTINA ALTERNIFLORA - SPARTINA PATENS PROPOSED UNE(S) EXITING D'BOX MUST REMAIN CONTOURS 29.81 x COMPACTED BASE GAS BAFFL E) W 6" USE 'TUF-11TE' LEVEL FOR DOWN TO 2'-0" BEFORE LEACHING 'FACILITY PITCHING WATER LINE 45'1 LAYER OF DOH 0 DEEP OBSERVATION HOLE CRUSHED STONE OR APPROVED 2.0.1 hn1MIN 1 Cr11 INAI CRIT 29.8 14" OAK. \ i 2' PINE �s" PINE I I ` i .Z — ..:+� S\ \ \ \ 10" OAK ` \ (REMOVEp' I EXISD�.BRAVEL DRIVEWAY \14" OAK / PROPOSED GRAVEL y V A V A 11Y PINE DRIVEWAY .MODIFICATION �,r' r\.,, ./ '✓i \ \ N i I t t,III ' \ \ 6' OAK 1 / I / f 30 \ N 7e0O 0 ))PROPOSED LEACHING SYSTEM 0010'OAK 12" PINE (421 x 1283'W x 2'D) PINE 0 e 8' OAK/ DOy 1 19' OAK GQ IN)(QO (2O /74OA / 18- OAK Ar 'PROPOSED 1500 1 PINE 14' OAK /.. // // f I/ GALLON SEPTIC �. ! - s' NE / / W6 / PROPOSED 4' VENT - - \ 18. OAK �_ — / ( w\ I _ I I / / / • / / / / 6 PROP18. OAK OSED 9 -OUTLET 0✓/ \ D'BOX (N-20) I I 100' FROM TOP OF \ 116' OAK fW7 ,4' o r , COASTAL BANK ' ` \ \ - I I I I I \_ Y / I 200' OFFSET FROM \�`'\ I-� I I R�USSELL�L. POTTER N/F. MHW (RIVERFRONT 50' FROM TOP OF \ _ 1 ' I - I I ASSESSOR MAPi101 SUSAN D. REID AREA) COASTAL BANK - `. _ I I I PARCEL 1811. ASSESSORS MAP 101 14" OAK - PARCEL 174 TOP OF { 1 I i I I I I I I I I l WS I 6355A3 6 COASTAL BANK PLAN 20 10 0 20 60 421 x 13'W x 2'EFF. DEPTH LEACHING GALLERY CONSTRUCTED BY PLACING FOUR (4) - 600 GALLON (6 DIA x 4 -8 H) H-20 LEACH PITS ®10' O.C. WITH S-6" OF STONE ON SIDES AND S -O" OF STONE ON ENDS 24" HEAVY DUTY "SEAL TITE" CAST IRON FRAMES AND COVERS TO FINISH GRADE 2 LAYER OF (SEE PLAN FOR LOCATION) OF 1/8" TO 1/2", STONE 3' MAX. 5— ALL ALL (H-20 RATED) END VIEW LO S LONGEST RUN SCHEMATIC FLOW PROFILE ALL INSTALLATIONS MUST CONFORM TO THE MINIMUM REQUIREMENTS OF TITLE 5 4" DIA. SCH 40 PVC PIPE REV i W/ DOME VENT CAP AND CHARCOAL FILTER MIN J TO 1.r DOUBLE ASHED STONE 0 I i7 2'-0" EFFECTIVE DEPTH DEPTH TO ESTIMATED HIGH GROUNDWATER > 10' DETAIL OF LEACHING CHAMBER NO SCALE 1 inch = 20 & INSPECTION NOTE THE STATE ENVIRONMENTAL CODE, TITLE 5, REQUIRES INSPECTION(S) OF THE SEWAGE DISPOSAL SYSTEM BY THE DESIGN ENGINEER PRIOR TO THE START OF INSTALLATION FOR DISCUSSION ON REQUIRED INSPECTIONS I HEREBY CERTIFY THAT THE EXISTING CONDITIONS SHOWN HEREON ARE LOCATED AS THEY EXISTED ON THE GROUND AS OF 12-20-20. DATE NOVEMBER 9, 2021 NO SCALE PLAN REFERENCES: ASSESSORS MAP 101, PARCEL 13 PLAN BOOK 395, PAGE 50 PLAN BOOK 376, PAGE 82 VIEW CORRIDOR REFERENCE PLAN TITLED: PROPOSED VISTA PRUNING AND LANDSCAPING PREPARED FOR: ROBERT R. ARMSTRONG PREPARED BY: COASTAL ENGINEERING CO., INC. REV. DATE: 10-04-07 REFERENCE ORDER OF CONDITIONS ISSUED TO ARMSTRONG RECORDED: BOOK 22425, PG 32 MA -DEP FILE #: SE 83-1798 G3G( NOV 12 2021, HEALTH DEPT. 2014 FLOOD NOTE: 14 FEMA FLOOD ZONE AE (EL 11) (NAVD 88) AS SHOWN ON FEMA FIRM MAP #25001CO591J EFFECTIVE DATE JULY 16, 2014. DATUM NOTE ELEVATIONS SHOWN HEREON ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD 1988) LEGEND EXISTING IN *RAISE EXISTING ® CATCH BASIN PLUMBING TO PROPOSED LIQUID DEPTH OUTLET TEE DEPTH EXIT ELEVATION SHOWN o BELOW FLOW LINE o 4 FT 14 INCHES WETLAND FLAG 5 FT 19 INCHES - 6 FT 24 INCHES EDGE OF MARSH 7 FT 29 INCHES 29.8 14" OAK. \ i 2' PINE �s" PINE I I ` i .Z — ..:+� S\ \ \ \ 10" OAK ` \ (REMOVEp' I EXISD�.BRAVEL DRIVEWAY \14" OAK / PROPOSED GRAVEL y V A V A 11Y PINE DRIVEWAY .MODIFICATION �,r' r\.,, ./ '✓i \ \ N i I t t,III ' \ \ 6' OAK 1 / I / f 30 \ N 7e0O 0 ))PROPOSED LEACHING SYSTEM 0010'OAK 12" PINE (421 x 1283'W x 2'D) PINE 0 e 8' OAK/ DOy 1 19' OAK GQ IN)(QO (2O /74OA / 18- OAK Ar 'PROPOSED 1500 1 PINE 14' OAK /.. // // f I/ GALLON SEPTIC �. ! - s' NE / / W6 / PROPOSED 4' VENT - - \ 18. OAK �_ — / ( w\ I _ I I / / / • / / / / 6 PROP18. OAK OSED 9 -OUTLET 0✓/ \ D'BOX (N-20) I I 100' FROM TOP OF \ 116' OAK fW7 ,4' o r , COASTAL BANK ' ` \ \ - I I I I I \_ Y / I 200' OFFSET FROM \�`'\ I-� I I R�USSELL�L. POTTER N/F. MHW (RIVERFRONT 50' FROM TOP OF \ _ 1 ' I - I I ASSESSOR MAPi101 SUSAN D. REID AREA) COASTAL BANK - `. _ I I I PARCEL 1811. ASSESSORS MAP 101 14" OAK - PARCEL 174 TOP OF { 1 I i I I I I I I I I l WS I 6355A3 6 COASTAL BANK PLAN 20 10 0 20 60 421 x 13'W x 2'EFF. DEPTH LEACHING GALLERY CONSTRUCTED BY PLACING FOUR (4) - 600 GALLON (6 DIA x 4 -8 H) H-20 LEACH PITS ®10' O.C. WITH S-6" OF STONE ON SIDES AND S -O" OF STONE ON ENDS 24" HEAVY DUTY "SEAL TITE" CAST IRON FRAMES AND COVERS TO FINISH GRADE 2 LAYER OF (SEE PLAN FOR LOCATION) OF 1/8" TO 1/2", STONE 3' MAX. 5— ALL ALL (H-20 RATED) END VIEW LO S LONGEST RUN SCHEMATIC FLOW PROFILE ALL INSTALLATIONS MUST CONFORM TO THE MINIMUM REQUIREMENTS OF TITLE 5 4" DIA. SCH 40 PVC PIPE REV i W/ DOME VENT CAP AND CHARCOAL FILTER MIN J TO 1.r DOUBLE ASHED STONE 0 I i7 2'-0" EFFECTIVE DEPTH DEPTH TO ESTIMATED HIGH GROUNDWATER > 10' DETAIL OF LEACHING CHAMBER NO SCALE 1 inch = 20 & INSPECTION NOTE THE STATE ENVIRONMENTAL CODE, TITLE 5, REQUIRES INSPECTION(S) OF THE SEWAGE DISPOSAL SYSTEM BY THE DESIGN ENGINEER PRIOR TO THE START OF INSTALLATION FOR DISCUSSION ON REQUIRED INSPECTIONS I HEREBY CERTIFY THAT THE EXISTING CONDITIONS SHOWN HEREON ARE LOCATED AS THEY EXISTED ON THE GROUND AS OF 12-20-20. DATE NOVEMBER 9, 2021 NO SCALE PLAN REFERENCES: ASSESSORS MAP 101, PARCEL 13 PLAN BOOK 395, PAGE 50 PLAN BOOK 376, PAGE 82 VIEW CORRIDOR REFERENCE PLAN TITLED: PROPOSED VISTA PRUNING AND LANDSCAPING PREPARED FOR: ROBERT R. ARMSTRONG PREPARED BY: COASTAL ENGINEERING CO., INC. REV. DATE: 10-04-07 REFERENCE ORDER OF CONDITIONS ISSUED TO ARMSTRONG RECORDED: BOOK 22425, PG 32 MA -DEP FILE #: SE 83-1798 G3G( NOV 12 2021, HEALTH DEPT. 2014 FLOOD NOTE: 14 FEMA FLOOD ZONE AE (EL 11) (NAVD 88) AS SHOWN ON FEMA FIRM MAP #25001CO591J EFFECTIVE DATE JULY 16, 2014. DATUM NOTE ELEVATIONS SHOWN HEREON ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD 1988) LEGEND EXISTING IN BOUND ® CATCH BASIN ® ELECTRIC METER 2 LIGHTPOST o U1ILITY POLE o GUY POLE W3 WETLAND FLAG —x— FENCE --10-- CONTOUR - EDGE OF MARSH MHW MLW UPLAND GRASS ,d/, SPARTINA ALTERNIFLORA SPARTINA PATENS PROPOSED — — — — LIMIT OF WORK 32 CONTOURS 29.81 x SPOT GRADE —6 — GAS UNE •— WATER LINE —■— UNDERGROUND ELECTRIC DOH 0 DEEP OBSERVATION HOLE Yarmouth Health Department �+ APPROVED] , Name Date G ►] Ex. O W C/1 1.4 ^® 91-4 q z � a t7 z SCALE AS NOTED DRAWING FILE C16322.03-C.dwg DATE n nTv-eT 2@-24 DRAWN BY DAP CHECKED BY DJM 0 N a C2.1.2 a cin W L OF 1 SHEETS at PROJECT NO. C16322.03