HomeMy WebLinkAboutEngineer Plan -2021LOCUS MAP
PROJECT BENCH MARK
TOP OF FOUNDATION
ELEV. = 100.00 (ASSUMED)
PROPOSED SAS
4 LC -6 CHAMBERS W/1' Stone under
4' STONE on SIDES & 2' ON ENDS
SAS TO BE COVERED WITH
FILTER FABRIC.
3 BR HOUSE
(Description– SITE WALKOVER)
bedroom
ai ai t g
Using Room
Room
8
cAw,ce
LOT 1143
/cases Sceave r«e +/-
/ /
FAILED
/ LEACH
/
Plural valid for REPAIR OF SEPTIC SVSWFvl
ONLY, due to State and Local septic sarlMc:
"Beard of Health review and approval is required 1,n
.say future additions/renovalionsiala•rnuorq to
sestailt facilities nd/orstructures/dwcnm„
Yarmou Health Departmet
AP OVE
H.MaS ri rg �zB
Illaillt,,. g Date
DOST.
1000 gal.
Septic Tank
EXISTING
3 BEDROOM
/ R
y=75.45` I
MIS TLE TOE LANE
alb
, I (40 FOOT RIGHT OF WAY)
TEST HOLE 01
——ELEV.- 97.00
5 FOOT STRIPOUT ALL AROUND
Note: Remove soil down to el. 89.00 & replace with
clean coarse sand w/nerc. rate leas than or
GENERAL NOTES
1. Contractor is responsible for Digsafe notification, Verification
of Utilities
and protection of all underground utilities and pipes.
2. The septic tank anq distri ution box shall be set
level on 6" of 3/4 —1 1/2" stone.
3. Backfill should be clean sand or gravel with no
stones over 3" in size.
4. This system is subject to inspection during installation
by Shay Environmental Services
5. The contractor shall install this system in accordance
with Title V of the Massachusetts state code, the approved
plan
and Local Regulations.
6. If, during installation the contractor encounters any
soil conditions or site conditions that are different
from those shown on the soil log or in our design
installation must halt & immediate notification be
made to Shay Environmental Services
7. No vehicle or heavy machinery shall drive over the
septic system unless noted as H-20 septic components.
8. Install Tuf—Tite gas baffles or equals on all outlet tee ends.
9. All Distribution Lines shall be 4" diameter Schedule 40 NSF
PVC pipes.
10. All solid piping, tees & fittings shall be 4" diameter
Schedule 40 NSF PVC pipes with water tight joints.
11. Municipal Water is AVAILABLE. ALL PROPERTIES WITHIN 150
FEET ARE
CONNECTED TO MUNICIPAL WATER.
THE PROPERTY LINES ARE APPROXIMATE AND
COMPILED FROM THE SURVEY PLAN BY SR SWEETSER, RLS
ENTITLED: "SKETCH OF PLAN OF LAND IN YARMOUTH MA OF
LOT 43 MISTLETOE LANE, DATED: NOV SEPT. 2, 1981
AND IS NOT INTENDED TO BE A SURVEY PLOT PIAN
IT SHOULD BE USED FOR NO PURPOSE OTHER THAN
THE SEPTIC SYSTEM INSTALLATION.
NOTE: ANY STRIPPED OUT SOIL CONTAINING LEACHATE
FROM THE EXISTING LEACH PIT ABANDONED AND TO BE DISPOSED
PLOT PLAN
I I '99 OF PROPOSED SEPTIC SYSTEM UPGRADE
I ASPHALT I / PREPARED FOR
DRIVEWAY
i I MIRLENE CASIMIR
9 MISTLETOE LANE
50.17'
CEL ID:
I m� l�5 42D 50' 00" p- 0 YARMROUTH.49MA 1ACT 8 =r?"1121,?"1121,e At "r -LJ r, e= nr
0 20 40 50
O�
SCALE: 1 "=30'
PREPARED BY:
CARMEN E. SHAY
E' ENVIRONMENTAL SERVICES
tJo ® P.O. Box 1576
R� ssf� MASHPEE, MA 02649
$A if TEL/FAX : 508-294-7498
DRAWN BY: CES DATE: AUGUST 25, 2021
PROJECT#9 Mistletoe FILENAME: 9 Mistletoe.DWG I SHEET 1 OF 2
10' min. from—
EXISTING Foundation house to septic tank
CONCRETE FULL
S - 0.02
12'
SYSTEM PROFILE
Not to Scale
SAS TO BE COVERED WITH
FILTER FABRIC.
"NOTE: ALL PIPES ARE TO BE 4" SCHEDULE 40 P.V.C.
nAtiAnntank covers must be
6 in. of finished grade
IST. 1,000 GI
SEPTIC TANK
H-10
over Septic Tank - 97.00
Tee to be placed in
36'
Cover
in. c
15'
6 in.of 3/4"-1 1/2"
compacted stone
VENT PIPE (® Least 24 Inches tall)
Schedule 40 PVC w/Charcoal Odor Filter
SAS cover moat be
ist have riser and be within 6' of GRADE
g ode
over D -Box - 97.00 ovs SAS -97.00
I NOTE: ALL COMPONENTS MUST HAVE RISERS TO WITHIN 6" BELOW GRADE I
5'
STEEL REINFORCED PRECAST CONCRETE
PLAN VIEW
3-24" REMO A BLE COVERS
Design Calculations
J
4"
Z — OUTLET
THE ACCESS COVERS FOR THE SEPTIC TANK,
DISTRIBUTION BOX AND LEACHING COMPONENT
SET DEEPER THAN 6 INCHES BELOW FINIS14ED
GRADE SHALL BE RAISED TO WITHIN 6" OF
FINISHED GRADE.
INSTALL TUF-TITE GAS BAFFLES OR EQUALS
4'-0" min.
Liquid depth
CROSS SECTION END—SECTION
TYPICAL 1000 GALLON SEPTIC TANK
Leaching Capacity Proposed: 330 Gal./Dey Minimum
Septic Tank : - 2 x 330 Gal./Day = 660 USE EXIST 1,000 GAL. Septic Tank.
SOIL ABSORPTION AREA: Using percolation rate of <2 min./inch
Bottom Area: 0.74 gal/day/sq. ft. x 308eq. ft. = 227.92 gallons/day
Sidewall Area: 0.74 gal./day/sq. ft. x 156 sq. ft. = 115.44 gallon/day -
Providing: =343.36 gallons/day ✓
Use: (4) LC -6 H-20 CONCRETE CHAMBERS, HAVING A 1' EFFECTIVE DEPTH,
(3' W x 6' L) TO BE USED WITH 4' OF WASHED STONE ON THE SIDES AND
2' OF WASHED STONE ON THE ENDS AND 1 FOOT OF STONE UNDER .
A
TOP OF SAS - 92.50
Effective Depth
Dgth of Chamber plus 1' stone under
SECTION A -A
PROFILE VIEW OF LEACHING SYSTEM
No r f/s • scow anueArd saneN r/e" - f/s• l cow nsemn.
INSPECTION cover must b\
within 6 in. of finished grade
N I I
m
II I � I W $ 4 Units 6 '4' 24'
• '
L I 1 m 5' PROVIDED
_
ff' 'e Effectl2e8'Length
Effective Wwdth I ZBottom of Test Hole 1 Elev.= 85.00 0 TP2
SOIL ABSORPTION SYSTEM <SAS)
Note: Remove soil down to el. 89.00 or C3 Layer & replace with LC -6 H-20 LEACHING UNITS / WIGGINS PRECAST
clean coarse sand q/pert. rate less than or
or equal to 2 min. In. before & after placement Not to Scale
PERCOLATION TEST
Date of Percolation Test: JULY 13, 2021
Test Performed By. CARMEN E. SHAY, R.S., C.S.E.
tesults Witnessed By. YARMOUTH BOH -BRUCE MURPHY
EXCAVATOR: CARMEN SHAY
Percolation Rate: Less Than 2 MPI ® 96"
Test Hole
No. 1
min• clearance
0 97.00
_3"
8" mtn.�2" mh. inlet to ou0et g• mM.
Sandy
F-TL qui level -
10,n1Y mF.
-7" .
---- L
10 YR 3/2
c
O"- 6"
EoCame.
96.50
Sandy
0
e'o
Bw
Design Calculations
J
4"
Z — OUTLET
THE ACCESS COVERS FOR THE SEPTIC TANK,
DISTRIBUTION BOX AND LEACHING COMPONENT
SET DEEPER THAN 6 INCHES BELOW FINIS14ED
GRADE SHALL BE RAISED TO WITHIN 6" OF
FINISHED GRADE.
INSTALL TUF-TITE GAS BAFFLES OR EQUALS
4'-0" min.
Liquid depth
CROSS SECTION END—SECTION
TYPICAL 1000 GALLON SEPTIC TANK
Leaching Capacity Proposed: 330 Gal./Dey Minimum
Septic Tank : - 2 x 330 Gal./Day = 660 USE EXIST 1,000 GAL. Septic Tank.
SOIL ABSORPTION AREA: Using percolation rate of <2 min./inch
Bottom Area: 0.74 gal/day/sq. ft. x 308eq. ft. = 227.92 gallons/day
Sidewall Area: 0.74 gal./day/sq. ft. x 156 sq. ft. = 115.44 gallon/day -
Providing: =343.36 gallons/day ✓
Use: (4) LC -6 H-20 CONCRETE CHAMBERS, HAVING A 1' EFFECTIVE DEPTH,
(3' W x 6' L) TO BE USED WITH 4' OF WASHED STONE ON THE SIDES AND
2' OF WASHED STONE ON THE ENDS AND 1 FOOT OF STONE UNDER .
A
TOP OF SAS - 92.50
Effective Depth
Dgth of Chamber plus 1' stone under
SECTION A -A
PROFILE VIEW OF LEACHING SYSTEM
No r f/s • scow anueArd saneN r/e" - f/s• l cow nsemn.
INSPECTION cover must b\
within 6 in. of finished grade
N I I
m
II I � I W $ 4 Units 6 '4' 24'
• '
L I 1 m 5' PROVIDED
_
ff' 'e Effectl2e8'Length
Effective Wwdth I ZBottom of Test Hole 1 Elev.= 85.00 0 TP2
SOIL ABSORPTION SYSTEM <SAS)
Note: Remove soil down to el. 89.00 or C3 Layer & replace with LC -6 H-20 LEACHING UNITS / WIGGINS PRECAST
clean coarse sand q/pert. rate less than or
or equal to 2 min. In. before & after placement Not to Scale
PERCOLATION TEST
Date of Percolation Test: JULY 13, 2021
Test Performed By. CARMEN E. SHAY, R.S., C.S.E.
tesults Witnessed By. YARMOUTH BOH -BRUCE MURPHY
EXCAVATOR: CARMEN SHAY
Percolation Rate: Less Than 2 MPI ® 96"
Test Hole
No. 1
DEPTH SOILS ELEV.
0 97.00
Sandy
Loam
10 YR 3/2
O"- 6"
A•
96.50
Sandy
Loam
Bw
6"- 36"
10 YR 5/6
94.00
Medium
Sand
2.5 Y 7/4
36"-60"
C,
92.00
SILT
LOAM
2.5 Y 8/6
60"-96"
CW
89.0
Med-Fine
Sand
2.5 Y 6/6
96"-144"
Cs
85.00
Pert #1
Depth to Pere 96"
Pere Rate= <2 MPI Assumed
Groundwater Not Observed
No Observed ESHWT ® 144"
ADJUSTED H2O Elev. = None ® 144" ® TP1
'I.
3 - 5' WTLET
KNOCKOUTS
12" —I , CONCRETE COVER
4" - SCH. 40 Teems 71.75'r
PLAN SECTION CROSS—SECTION
3 HOLE H-20 DISTRIBUTION BOX
PLOT PLAN
OF PROPOSED SEPTIC SYSTEM UPGRADE
PREPARED FOR
MIRLENE CASIMIR
AT
9 MISTLETOE LANE
PARCEL ID: 89/49
PREPARED BY:
SHAY ENVIRONMENTAL SERVICES
P.O. Box
1576
�r is���p MASHPEE, MA 02649
kriiTA O� ,' TEL/FAX : 508-294-7498
SCALE �1 "=20' DRAWN BY: CES I DATE: AUGUST 25, 2021
PROJECT#9 Mistletoe FILENAME: 9 Mistletoe.DWG I SHEET 2 OF 2