HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2021-11-12Summary Report #24
November 15, 2021
Job No: 5951
Job Name:Dennis Yarmouth Middle School
296 Station Ave
South Yarmouth, MA 02664
Application No.:
TESTING
INSPECTION
ENGINEERING
SW
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
November 8, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (6) set(s), (30) total. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Blake Mullens reported to Nicholas Hull with PMA at the jobsite. Performed field ultrasonic testing. See attached.
The work observed was, to the best of Arsene's, Blake's knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
November 9, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed structural masonry inspection for grout placement. Grout sample(s)
obtained: (4) per set, (1) set(s), (4) total. See attached.
Arsene Ntwali reported to Mitch Miller with PMA a the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Enea Mushi reported to Nicholas Hull with PMA Consulting at the jobsite. Performed floor flatness and floor levelness inspection. See attached.
Julen Barruetabena picked up (55) concrete cylinders and (4) grout samples from the jobsite.
The work observed was, to the best of Arsene's, Enea's knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
November 10, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Blake Mullens reported to Nicholas Hull with PMA at the jobsite. Performed field ultrasonic testing. See attached.
The work observed was, to the best of Arsene's, Blake's knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
TESTING
INSPECTION
ENGINEERING
SW
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
November 11, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
November 12, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Joe Francisco
Field Supervisor
11-22-2021
Date
Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com)
Administrative Contact: Gina Salerno (gsalerno@fenaghengineering.com)
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
November 8, 2021
Time In: 07:00 Time Out: 12:00
Weather: Sunny
Temperature: 52°F
Permit No. :
Plans Dated: 08/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
11-08-2021
Date Enea Mushi
Project Manager
11-15-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 2, slab on metal deck at Building C (mix no. 4000, design strength of 4000 psi at 28 days, specified slump from 5 to 9 in.,
specified air content from 0% to 3%, and 308 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit.
Prepared 4x8" cylinder test specimens sampled from Pump truck.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)Truck No. Location
Qty. of
Samples Batch Time Sample Time Subcontractor
Ticket
No.
1 9.0 69 53 1.5 149.8 55 E/c4 5 6:33 AM 7:25 AM Silverback
2227
9
2 8.0 69 53 2.0 150.1 72 H/c2 5 8:44 AM 9:18 AM Silverback
3244
9
3 9.0 70 54 1.7 150.7 57 D.5/c6 5 9:39 AM 10:26 AM Silverback
3245
2
4 8.75 70 55 2.3 149.5 72 G/c12 5 10:24 AM 11:01 AM Silverback
3245
6
5 7.5 69 54 1.6 150.1 64 F/c116 5 10:50 AM 11:33 AM Silverback
3245
8
6 7.0 69 55 1.2 149.6 83 H/c19 5 11:50 AM 12:23 AM Silverback
3246
3
30 Total
Additional Notes: Building C slab on metal deck.rn
Referenced Details: Mix Design 4000 DNA-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
November 8, 2021
Time In: 12:00 Time Out: 15:00
Weather: Sunny
Temperature: 52°F
Permit No. :
Plans Dated: 09/23/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
11-08-2021
Date Enea Mushi
Project Manager
11-15-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , Excavator. No samples taken.
Density Std (DS):
2558
Moisture Std (MS):
465
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
General Location of Fill:
Watermain south east of
building A
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date
02/2022
Soils Report Dated:
06-07-2021
Results Reported
to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: Excavator
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 Water main 6 23 1 111.3 5.7 96 Pass
2 Water main 6 24 1 111.6 5.4 96 Pass
TESTING
INSPECTION
ENGINEERING
FIELD ULTRASONIC TESTING REPORT
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: G-2732.18
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Blake Mullens
Subcontractor: Stellar Steel Erectors
November 8, 2021
Time In: 11:30 Time Out: 18:30
Weather: Sunny
Temperature: 60°F
Permit No. :
12 Tech Circle Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax | 9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374 office |
54-21 73rd Place, Maspeth, NY 11378 | (516) 787-3333 office | 13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
Reported to Nicholas Hull with PMA at Jobsite.
Inspection is: FINAL.
Equipment/Brand:: StressTel / FlawMike Model #: 37550 Serial #: X9707Ga
Transducer/Brand: Tru-Sonic Scan Level: +14db
Size: 0.625X0.750 Frequency: 2.25MHz Angle: 45deg / 70deg Reference Level: 77
Floor/Level Member Type Location Weld Type
Acc.
Qty
Rej.
Qty
Repair RemarksAcc Qty Rej. Qty Rej. Date
2 CJP M.5/b21 V-Groove 1 0 1 0 10/29/21 Top Moment
2 CJP J.6/b28 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
2 CJP J.6/b29 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
2 CJP J.6/b30 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
2 CJP L/b24 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
2 CJP M/b24 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
2 CJP N/b24 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
2 CJP P.1/b28 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
2 CJP P.1/b29 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP L/b24 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Roof CJP M/b24 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
Roof CJP N/b24 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
High Roof CJP P.7/a17 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
High Roof CJP P.7/a22 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
High Roof CJP P.7/a26 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
High Roof CJP P.7/b21 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
□ See attached UT Rejection report for rejectable indications noted above.
Additional Notes: Performed visual inspection of bolting at level 2 framing at area-b. Bolting within this area acceptable per
standards. Performed visual inspection of bolting at roof and high roof at area-b. Bolting within this area acceptable per standards.
Performed visual inspection of high joists weldments at auditorium in area-a. Weldments within this area acceptable per
standards.
Referenced Details: S-1.41B, S-1.32B, S-1.22B
TESTING
INSPECTION
ENGINEERING
FIELD ULTRASONIC TESTING REPORT
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: G-2732.18
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Blake Mullens
Subcontractor: Stellar Steel Erectors
November 8, 2021
Time In: 11:30 Time Out: 18:30
Weather: Sunny
Temperature: 60°F
Permit No. :
Conformance:
Work observed was, to the best of my knowledge, in conformance with Approved plans dated: 01/19/2021
and the applicable standards of workmanship, per sheet(s)/detail(s) AWS D1.1
Limitation:
These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to
adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered
preliminary and subject to change, unless signed by both inspector and engineer below.
Inspector Signature
11-08-2021
Date Project Manager
11-15-2021
Date
12 Tech Circle Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax | 9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374
office | 54-21 73rd Place, Maspeth, NY 11378 | (516) 787-3333 office | 13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Masonry Grout Placement
Pg. 1 of 1
November 9, 2021
Time In: 14:00 Time Out: 15:00
Weather: Sunny
Temperature: 59°F
Permit No. :
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of Grout, mix design #3000, 3000 PSI at 28 days, for
the 12" and CMU wall, low-lift height 1 courses. Cleanouts were used, cells are clean and acceptable. consolidated by rodding. base plates at
Level 1 at gridlines Building B and A.
Set No.Slump (in.)Mix Temp (°F)Air Temp (°F)Location Qty. of Samples
1 NA NA 59 N/b20, a5/S 4
1 set of Grout Box(s) for a total of 4 samples
Referenced Details: 1-4WET- Fine Grout Mix
Additional Notes: Grout applied on base plates in buildings A and B.
Plans Dated: 07/02/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or
guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein
has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
11-09-2021
Date Joe Francisco
Field Supervisor
11-22-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
NYk
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
November 9, 2021
Time In: 07:00 Time Out: 14:00
Weather: Sunny
Temperature: 59°F
Permit No. :
Plans Dated: 09/23/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
11-09-2021
Date Enea Mushi
Project Manager
11-15-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s
foot, Excavator. No samples taken.
Density Std (DS):
2563
Moisture Std (MS):
466
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
General Location of Fill:
Drainage line DG 6.74
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep’s foot
Excavation: Excavator
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 DG 6.74 6 22 1 110.7 6.4 96 Pass
2 DG 6.74 6 23 1 110.8 6.6 96 Pass
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Enea Mushi
Inspection Type: Floor Flatness and Floor Levelness
Pg. 1 of 1
November 9, 2021
Time In: 09:00 Time Out: 13:00
Weather:
Temperature: 66°F
Permit No. :
Plans Dated: 01/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Enea Mushi
Inspector
11-09-2021
Date Joe Francisco
Field Supervisor
11-22-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Enea Mushi reported to Nicholas Hull with PMA Consulting at the jobsite. Performed floor flatness and floor levelness testing on Slab
on Metal Deck on Level 2 Building C at Line D-H, Row C1-C21 placed on 08/11/2021, per ASTM E1155-96 (2008) specifications. Floor
flatness (FF) requirement: 30; floor flatness (FF) local minimum requirement: ; and floor levelness (FL) requirement: N/A. FF
measurements met local minimum requirements. FL measurements n/a local minimum requirements. Measurements were performed
in general accordance with ASTM E1155-96 (2008).
x TESTING
x INSPECTION x ENGINEERING
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374 office
54-21 73rd Place, Maspeth, NY 11378 | (516) 423-3428 office
13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
November 9, 2021
Payette Attn: Mitch Miller
296 Station Ave South Yarmouth MA 02664
Job No.: 5951
Job Name: Dennis Yarmouth Middle School
Permit #:
Dear Mr. Miller,
In accordance with your authorization, floor flatness tests were performed on the Level 2 Slab on Metal Deck
Building C, for the concrete placement on November 5, 2021. An Allen Face and Company D-Meter Model 1610,
S/N 0324 was used. Measurements were performed in general accordance with ASTM E1155 – 2008 and Project
Manual, Section 033000 Cast-in-Place Concrete. Summary of the test performed is outlined below
Overall Location Level 2 SOMD – Building C
Section
(Approximate grid lines) Line D-H, Row C1-C21
Date Measured 11/09/2021
Measured Section Area 25,137 sq. ft.
Type of Run Selection Perpendicular
Measured FF 46.9
Floor Flatness (FF) Overall
Requirement 30
The measured FF this placement is 46.9.
Attached are the sketches of runs measured, project summary and section summaries. If you have any inquiries or
require additional information, please contact our office.
______________________________________________
Enea Mushi
Senior Project Manager
_______________________________________
EMhi
x TESTING
x INSPECTION x ENGINEERING
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374 office
54-21 73rd Place, Maspeth, NY 11378 | (516) 787-3333 office
13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
x TESTING
x INSPECTIONxENGINEERING
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374 office
54-21 73rd Place, Maspeth, NY 11378 | (516) 423-3428 office
13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
November 9, 2021
$WWQ-RQDWKDQ3RSH
296 Station Ave South Yarmouth MA 02664
Job No.: 5951
Job Name: Dennis Yarmouth Middle School
Permit #:
Dear Mr. 3RSH,
In accordance with your authorization, floor flatness tests were performed on the Level 2 Slab on Metal Deck
Building C, for the concrete placement on November 5, 2021. An Allen Face and Company D-Meter Model 1610,
S/N 0324 was used. Measurements were performed in general accordance with ASTM E1155 – 2008 and Project
Manual, Section 033000 Cast-in-Place Concrete. Summary of the test performed is outlined below
Overall Location Level 2 SOMD – Building C
Section
(Approximate grid lines) Line D-H, Row C1-C21
Date Measured 11/09/2021
Measured Section Area 25,137 sq. ft.
Type of Run Selection Perpendicular
Measured FF 46.9
Floor Flatness (FF) Overall
Requirement 30
The measured FF this placement is 46.9.
Attached are the sketches of runs measured, project summary and section summaries. If you have any inquiries or
require additional information, please contact our office.
______________________________________________
Enea Mushi
Senior Project Manager
_______________________________________
EMhi
x TESTING
x INSPECTIONxENGINEERING
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374 office
54-21 73rd Place, Maspeth, NY 11378 | (516) 787-3333 office
13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
'DLO\3LFN8S5HSRUW
-RE1XPEHU3URMHFW1DPH
)HQDJK 5HSUHVHQWDWLYH'DWH
&\OLQGHUV
6KRWFUHWH
*URXW
0RUWDU
*URXW&XEHV
3ULVPV
37&DEOHV
)LUHSURRILQJ6DPSOHV
6RLO6DPSOHV
5HEDU6DPSOHV
6WHHO3ODWHV
2WKHU
$GGLWLRQDO&RPPHQWV
-RE6LWH6KRS %DWFK 3ODQW4XDUU\2WKHUBBBBBBBB
&XUH%R[7HPSBBBBBB+LJK/RZ7HPSBBBBBBBB2XWVLGH7HPSBBBBBB
zĂƌŵŽƵƚŚDŝĚĚůĞ^ĐŚŽŽů ϱϵϱϭ
:ƵůĞŶĂƌƌƵĞƚĂďĞŹĂ ϭϭͬϬϵͬϮϬϮϭ
■
Ͳ ϲϬ
ϱϱ
ϭďŽdž
Ͳ
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
November 10, 2021
Time In: 09:00 Time Out: 15:00
Weather: Sunny
Temperature: 60°F
Permit No. :
Plans Dated: 09/23/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
11-10-2021
Date Enea Mushi
Project Manager
11-15-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep’s
foot, Excavator. No samples taken.
Density Std (DS):
2566
Moisture Std (MS):
468
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
General Location of Fill:
Building B
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep’s foot
Excavation: Excavator
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 Catch base 14 6 22 1 111.1 6.6 96 Pass
2 Catch base 14 6 23 1 111.6 6.2 96 Pass
TESTING
INSPECTION
ENGINEERING
FIELD ULTRASONIC TESTING REPORT
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: G-2732.18
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Blake Mullens
Subcontractor: Stellar Steel Erectors
November 10, 2021
Time In: 11:30 Time Out: 18:30
Weather: Sunny
Temperature: 55°F
Permit No. :
Conformance:
Work observed was, to the best of my knowledge, in conformance with Approved plans dated: 01/19/2021
and the applicable standards of workmanship, per sheet(s)/detail(s) AWS D1.1
Limitation:
These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to
adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered
preliminary and subject to change, unless signed by both inspector and engineer below.
Inspector Signature
11-10-2021
Date Project Manager
11-15-2021
Date
12 Tech Circle Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax | 9070 Center Avenue, Rancho Cucamonga, CA 91730 | (909) 587-6374
office | 54-21 73rd Place, Maspeth, NY 11378 | (516) 787-3333 office | 13707 Cimarron Avenue, Suite B, Gardena, CA 90249 | (424) 270-9791 office
Reported to Nicholas Hull with PMA at Jobsite.
Inspection is: FINAL.
Equipment/Brand:: StressTel / FlawMike Model #: 37550 Serial #: X9707Ga
Transducer/Brand: Tru-Sonic Scan Level: +14db
Size: 0.625X0.750 Frequency: 2.25MHz Angle: 45deg / 70deg Reference Level: 78
Floor/Level Member Type Location Weld Type
Acc.
Qty
Rej.
Qty
Repair RemarksAcc Qty Rej. Qty Rej. Date
Low Roof CJP W/a1 V-Groove 4 0 N/A N/A N/A Top and Bottom Moments
Low Roof CJP V.5/a1 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Low Roof CJP W/a3 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Low Rood CJP W/a9 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Low Roof CJP W/a14 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Low Roof CJP V.9/a15 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
Low Roof CJP V.5/a15 V-Groove 2 0 N/A N/A N/A Top and Bottom Moments
□ See attached UT Rejection report for rejectable indications noted above.
Additional Notes: Performed visual inspection of bolting, decking and wind bracing weldments at Gym. Bolting, decking and
weldments within this area acceptable per standards.
Performed visual inspection of Parapet at Area-D. Parapet visually acceptable per standards.
Welds painted at roof decking at Area-D acceptable per standards. Performed visual inspection of wind bracing top welds at Area-
D. Wind bracing weldments acceptable per standards.
Performed visual inspection of Stair welds at Area-D west. Stair welds acceptable per standards.
Performed visual inspection of weldments at bottom wind bracing at Area-C. Weldments within this area acceptable per standards.
Performed visual inspection of weldments at Column 20C3 base plate connection (RFI No: 100). Weldments acceptable per
standards.
Referenced Details: S-1.21A; RFI 100
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
November 11, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 59°F
Permit No. :
Plans Dated: 09/23/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
11-11-2021
Date Enea Mushi
Project Manager
11-15-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , Excavator. No samples taken.
Density Std (DS):
2566
Moisture Std (MS):
468
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
General Location of Fill:
East access road
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: Excavator
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 Light pole 6 -3 1 110.5 5.6 95 Pass
2 Light pole 6 -2 1 110.3 5.4 95 Pass
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
November 12, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 65°F
Permit No. :
Plans Dated: 09/23/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
11-12-2021
Date Enea Mushi
Project Manager
11-15-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , Excavator. No samples taken.
Density Std (DS):
2566
Moisture Std (MS):
468
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
General Location of Fill:
East access road
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 02/2022
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: Excavator
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf) Optimum Moisture
Loose glacial 1 S774 115.8 10.0
Test# Test Location
Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 Light pole 6 -3 1 111.4 6.6 96 Pass
2 Light pole 6 -2 1 111.0 7.1 96 Pass
3 Light pole 6 -1 1 111.5 6.8 96 Pass
Additional Notes: East access road light poles.
EZ/η ĂƚĞ >ŽĐĂƚŝŽŶ /ŶƐƉĞĐƚŽƌ /ƐƐƵĞZ&/ͬ^ƵďŵŝƚƚĂůEŽ͘ZĞƐŽůǀĞĚ͍;zͬEͿ ^ƵďͬŽŶƚƌĂĐƚŽƌ ĂƚĞZĞƐŽůǀĞĚ ŽŵŵĞŶƚϭ ϳͬϮϭͬϮϬϮϭ tĂůů͗ͬĚϯ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϬͬϮϬϮϭ^Ğƚϭсϭ͕ϴϲϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϴͬϯϭͬϮϬϮϭ^ĞƚϭсϮ͕ϴϬϬƉƐŝ^ĞƚϭсϮ͕ϵϬϬƉƐŝ^Ğƚϭсϯ͕ϰϴϬƉƐŝϮϴĚĂLJĂǀĞƌĂŐĞсϯ͕ϬϲϬƉƐŝϮ ϳͬϮϴͬϮϬϮϭ &ŽŽƚŝŶŐ͗ϭϲͬ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͗>Ăď>ŽŐEŽ͗͘ϭϱϱϭϵ;ϮϳϰϰͲϮϳϰϱͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϮϴĚĂLJďƌĞĂŬϬϴͬϯϭͬϮϬϮϭ^Ğƚϭсϯ͕ϯϱϬƉƐŝ^Ğƚϭсϯ͕ϱϬϬƉƐŝ^Ğƚϭсϯ͕ϲϮϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϵͬϮϮͬϮϬϮϭ^ĞƚϭсƉƐŝϯ ϳͬϯϬͬϮϬϮϭ&ŽŽƚŝŶŐƐ^Ğƚηϭ͗ŽůƵŵŶůŝŶĞͬZŽǁ͗͘ϯͬĐϭϭϲ^ĞƚηϮŽůƵŵŵůŝŶĞͬZŽǁĐϱͬ,ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϮϴĚĂLJďƌĞĂŬϬϴͬϮϳͬϮϬϮϭ^Ğƚϭсϯ͕ϬϳϬƉƐŝ^Ğƚϭсϯ͕ϯϯϬƉƐŝ^Ğƚϭсϯ͕ϰϯϬƉƐŝ^ĞƚϮсϯ͕ϯϯϬƉƐŝ^ĞƚϮсϯ͕ϱϮϬƉƐŝ^ĞƚϮсϯ͕ϱϴϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϵͬϮϰͬϮϬϮϭ^Ğƚηϭсϯ͕ϳϮϬƉƐŝ^ĞƚηϮсϯ͕ϲϳϬƉƐŝϰ ϴͬϯͬϮϬϮϭ&ŽŽƚŝŶŐƐ͗ůĞǀĂƚŽƌƉŝƚĨŽƵŶĚĂƚŝŽŶƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϬͬϮϬϮϭ^ĞƚϭсϮ͕ϲϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϴͬϯϭͬϮϬϮϭ^Ğƚϭсϯ͕ϭϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϵͬϮϴͬϮϬϮϭ^Ğƚϭсϯ͕ϯϯϬƉƐŝ^Ğƚϭсϯ͕ϰϵϬƉƐŝ^Ğƚϭсϯ͕ϳϬϬƉƐŝϱϲĚĂLJĂǀĞƌĂŐĞƐĞƚϭсϯ͕ϱϭϬƉƐŝϱ ϴͬϲͬϮϬϮϭ>ĞǀĞůϭtĂůůĂƚƵŝůĚŝŶŐĂŶĚͲͬĐϮƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϯͬϮϬϮϭ^ĞƚϭсϮ͕ϵϴϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϯͬϮϬϮϭ^Ğƚϭсϯ͕ϭϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϴͬϮϬϮϭ^Ğƚϭсϯ͕ϮϯϬƉƐŝ^Ğƚϭсϯ͕ϰϬϬƉƐŝϲ ϴͬϲͬϮϬϮϭ>ĞǀĞůϭtĂůůĂƚƵŝůĚŝŶŐĂŶĚͲ:͘ϳͬďϮϱƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϯͬϮϬϮϭ^ĞƚϮсϮ͕ϯϵϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϯͬϮϬϮϭ^ĞƚϮсϯϯϴϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϴͬϮϬϮϭ^ĞƚϭсƉƐŝϳ ϴͬϭϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗W͘ϭͬďϯϯƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϭϳĚĂLJďƌĞĂŬϬϴͬϯϬͬϮϬϮϭ^Ğƚϭсϯ͕ϬϵϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^Ğƚϭсϯ͕ϰϲϬƉƐŝ^Ğƚϭсϯ͕ϱϭϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϴ ϴͬϭϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗:͘ϯͬďϮϰƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϬͬϮϬϮϭ^ĞƚϭсϮ͕ϯϮϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^ĞƚϭсϮ͕ϴϰϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝ
ϵ ϴͬϮϬͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚ&ŽƵŶĚĂƚŝŽŶ͗tĂůů͗,ͬĐϱƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͗>Ăď>ŽŐEŽ͗͘ϭϱϴϲϬ;ϯϬϮϰͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϳͬϮϬϮϭ^ĞƚϭсϮ͕ϴϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϳͬϮϬϮϭ^Ğƚϭсϯ͕ϰϰϬƉƐŝ^Ğƚϭсϯ͕ϱϬϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϭϱͬϮϬϮϭ^Ğƚϭсϯ͕ϵϮϬƉƐŝ^Ğƚϭсϰ͕ϬϮϬƉƐŝϭϬ ϵͬϯͬϮϬϮϭ >ĞǀĞůϭtĂůů͖hͬĂϱ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϲϬϲϳ;ϯϭϮϯͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^ĞƚϭсϮ͕ϬϱϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϬϭͬϮϬϮϭ^Ğƚϭсϯ͕ϭϬϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϮϵͬϮϬϮϭ^Ğƚϭсϯ͕ϱϭϬƉƐŝ^Ğƚϭсϯ͕ϲϯϬƉƐŝ^Ğƚϭсϯ͕ϲϲϬƉƐŝϭϭ ϵͬϵͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐ͗D͘ϱͬďϭϳƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϲϭϯϮ;ϯϭϳϱͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϭϲͬϮϬϮϭ^ĞƚϭсϮ͕ϰϬϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϬϳͬϮϬϮϭ^Ğƚϭсϯ͕ϰϴϬƉƐŝ^Ğƚϭсϯ͕ϰϵϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϬϰͬϮϬϮϭ^Ğƚϭсϰ͕ϬϱϬƉƐŝ^Ğƚϭсϰ͕ϮϰϬƉƐŝϭϮ ϵͬϭϬͬϮϬϮϭ >ĞǀĞůϭ&ŽŽƚŝŶŐ͗>͘ϵͬďϮ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϲϭϯϯ;ϯϭϳϲͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϭϳͬϮϬϮϭ^ĞƚϭсϮ͕ϯϯϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^Ğƚϭсϯ͕ϰϱϬƉƐŝ^Ğƚϭсϯ͕ϰϱϬƉƐŝ^Ğƚϭсϯ͕ϰϵϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϬϱͬϮϬϮϭ^Ğƚϭсϰ͕ϬϲϬƉƐŝϭϯ ϴͬϭϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗^ĞƚηϭW͘ϭͬďϯϯ^ĞƚηϮ:͘ϯͬďϮϰƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϱϳϰϱ;ϮϵϰϱͲϮϵϰϲͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϬͬϮϬϮϭ^ĞƚϮсϮ͕ϯϮϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^Ğƚϭсϯ͕ϰϲϬƉƐŝ^Ğƚϭсϯ͕ϱϭϬƉƐŝ^ĞƚϮсϮ͕ϴϰϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^Ğƚϭсϯ͕ϳϲϬƉƐŝ^Ğƚϭсϯ͕ϴϱϬƉƐŝ^ĞƚϮсϯ͕ϮϲϬƉƐŝ^ĞƚϮсϯ͕ϬϯϬƉƐŝ^ĞƚϮсϯ͕ϭϱϬƉƐŝ^Ğƚ Ϯсϯ͕ϮϲϬ ƉƐŝϭϰ ϴͬϭϳͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗^͘ϭͬďϮϳƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϱϳϰϱ;ϮϵϰϱͲϮϵϰϲͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϰͬϮϬϮϭ^ĞƚϭсϮ͕ϱϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϰͬϮϬϮϭ^Ğƚϭсϯ͕ϮϴϬƉƐŝ^Ğƚϭсϯ͕ϰϯϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϭϮͬϮϬϮϭ^Ğƚϭсϰ͕ϬϳϬƉƐŝ^Ğƚϭсϰ͕ϭϭϬƉƐŝϭϱ ϵͬϮϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗WϳͬĂϭϴƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϱϬϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϱ͕ϬϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϱƚŽϴŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰйƚŽϳй͖>Ăď>ŽŐEŽ͗͘ϭϲϮϴϴ;ϯϮϲϰͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϯϬͬϮϬϮϭ^Ğƚϭсϯ͕ϱϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϮϭͬϮϬϮϭ^Ğƚϭсϰ͕ϰϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϭϴͬϮϬϮϭ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϭϲ ϭϭͬϮͬϮϬϮϭ>ĞǀĞůϭ^ůĂďĂƚƵŝůĚŝŶŐ͗>ŝŶĞͲϭ͕ZŽǁϭͲďĞĨŽƌĞϭϲŶĞĂDƵƐŚŝ DĞĂƐƵƌĞĚ&ůŽŽƌ&ůĂƚŶĞƐƐ͕>ĞǀĞůŶĞƐƐ;ϯϰ͘ϳĂŶĚϭϴ͘ϯͿĚŝĚŶŽƚŵĞĞƚŽǀĞƌĂůůƉƌŽũĞĐƚƌĞƋƵŝƌĞŵĞŶƚ;ϯϱĂŶĚϮϱͿ E DĂƌŐƵĞƌŝƚĞ KZƚŽĚǀŝƐĞ
ϭϳ ϵͬϮϳͬϮϬϮϭ>ĞǀĞůϭtĂůůĂƚYͲW͘ϳͬĂϭϴ͕ĂϭϴͲϮϰͬtϭϳ͗^ĂŵƉůĞĚΛE͘ϰͬďϱƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϱϬϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϱ͕ϬϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϱƚŽϴŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰйƚŽϳй͖>Ăď>ŽŐEŽ͗͘ϭϲϯϯϵ;ϯϯϮϯͿE DĂƌŐƵĞƌŝƚĞKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϬͬϬϰͬϮϬϮϭ^Ğƚϭсϯ͕ϱϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϮϱͬϮϬϮϭ^Ğƚϭсϰ͕ϭϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϮϮͬϮϬϮϭ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝ^ƚĂƚƵƐ͗tŽƌŬͲŝŶͲWƌŽŐƌĞƐƐ>ĞŐĞŶĚ͗^ƚĂƚƵƐ͗ůŽƐĞĚ^ƚĂƚƵƐ͗KƉĞŶ
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/06/2021 Lab Log No.: 16470 (3362)
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 72
Design Strength (psi): 3,500 @28
days Ticket#: 32014
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at V.5-V/a15, V-S.1/b13
Location when sampled: V/a15
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 71 50-90 Slump or Spread (in.): 6.0 4-6 Unit Wt (#cu ft): 143.9 143.1
Air Temperature (ºF): 70 >40 Air Content (%): 5.5 4.5-7.5 Time Sampled: 8:10 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:25 AM Time in Truck: 45 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/08/2021 Technician that received: Max Nabulsi
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 10/13/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 35,402 2,820 psi Type 2
B 28 11/03/2021 Kevin Noel 4.00 8.00 12.57 Lab 48,462 3,860 psi Type 2
C 28 11/03/2021 Kevin Noel 4.00 8.00 12.57 Lab 48,426 3,850 psi Type 3
D 28 11/03/2021 Kevin Noel 4.00 8.00 12.57 Lab 49,976 3,980 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:3,900 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Peter Wilson Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/08/2021 Lab Log No.: 16520 (3411)
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Ready Mix Contractor: Maurgerite
Set: 1 of 1 Truck #: 72
Design Strength (psi): 3,500 @28
days Ticket#: 10715
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: 1 Wall at BLD A
Location when sampled: S.3/a1
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 75 50-90 Slump or Spread (in.): 5.0 4-6 Unit Wt (#cu ft): 145.6 143.1
Air Temperature (ºF): 65 >40 Air Content (%): 5.0 4.5-7.5 Time Sampled: 8:33 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:23 AM Time in Truck: 70 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/15/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 10/15/2021 Henry Soares 4.00 8.00 12.57 Lab 35,650 2,840 psi Type 5
B 28 11/05/2021 Kevin Noel 4.00 8.00 12.57 Lab 50,533 4,020 psi Type 2
C 28 11/05/2021 Kevin Noel 4.00 8.00 12.57 Lab 49,425 3,930 psi Type 2
D 28 11/05/2021 Kevin Noel 4.00 8.00 12.57 Lab 47,035 3,740 psi Type 3
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:3,900 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 30 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/28/2021 Lab Log No.: 16789
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 6
Information provided by Field Technician
Mix #: 4000 Supplier: Cape Cod Ready Mix, Inc. Contractor: Silverback
Set: 1 of 6 Truck #: 56
Design Strength (psi): 4,000 @28
days Ticket#: 32278
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: Level 2 Slab on Metal Deck at Building D
Location when sampled: A/d4
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 68 50-90 Slump or Spread (in.): 6.5 6-10 Unit Wt (#cu ft): 149.7 149.3
Air Temperature (ºF): 51 >40 Air Content (%): 1.5 0-3 Time Sampled: 7:25 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 6:41 AM Time in Truck: 44 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/02/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 45,807 3,640 psi Type 5
B 28 11/25/2021 4.00 8.00 12.57 Fld
C 28 11/25/2021 4.00 8.00 12.57 Fld
D 28 11/25/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,640 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory.
TESTING
INSPECTION
ENGINEERING
Field Number: 30 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/28/2021 Lab Log No.: 16789
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 6
Information provided by Field Technician
Mix #: 4000 Supplier: Cape Cod Ready Mix, Inc. Contractor: Silverback
Set: 2 of 6 Truck #: 59
Design Strength (psi): 4,000 @28
days Ticket#: 32282
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: Level 2 Slab on Metal Deck at Building D
Location when sampled: C/d4
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 67 50-90 Slump or Spread (in.): 7.0 6-10 Unit Wt (#cu ft): 150.2 149.3
Air Temperature (ºF): 51 >40 Air Content (%): 1.3 0-3 Time Sampled: 8:10 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:37 AM Time in Truck: 33 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/02/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 51,363 4,090 psi Type 2
B 28 11/25/2021 4.00 8.00 12.57 Fld
C 28 11/25/2021 4.00 8.00 12.57 Fld
D 28 11/25/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:4,090 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory.
TESTING
INSPECTION
ENGINEERING
Field Number: 30 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/28/2021 Lab Log No.: 16789
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 3 of 6
Information provided by Field Technician
Mix #: 4000 Supplier: Cape Cod Ready Mix, Inc. Contractor: Silverback
Set: 3 of 6 Truck #: 65
Design Strength (psi): 4,000 @28
days Ticket#: 32286
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: Level 2 Slab on Metal Deck at Building D
Location when sampled: B/d15
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 7.5 6-10 Unit Wt (#cu ft): 149.5 149.3
Air Temperature (ºF): 51 >40 Air Content (%): 1.7 0-3 Time Sampled: 8:42 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 8:15 AM Time in Truck: 27 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/02/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 47,591 3,790 psi Type 2
B 28 11/25/2021 4.00 8.00 12.57 Fld
C 28 11/25/2021 4.00 8.00 12.57 Fld
D 28 11/25/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,790 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory.
TESTING
INSPECTION
ENGINEERING
Field Number: 30 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/28/2021 Lab Log No.: 16789
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 4 of 6
Information provided by Field Technician
Mix #: 4000 Supplier: Cape Cod Ready Mix, Inc. Contractor: Silverback
Set: 4 of 6 Truck #: 83
Design Strength (psi): 4,000 @28
days Ticket#: 32290
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: Level 2 Slab on Metal Deck at Building D
Location when sampled: D/d15
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 69 50-90 Slump or Spread (in.): 8.5 6-10 Unit Wt (#cu ft): 149.9 149.3
Air Temperature (ºF): 55 >40 Air Content (%): 1.8 0-3 Time Sampled: 9:30 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 9:04 AM Time in Truck: 26 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/02/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 43,950 3,500 psi Type 2
B 28 11/25/2021 4.00 8.00 12.57 Fld
C 28 11/25/2021 4.00 8.00 12.57 Fld
D 28 11/25/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,500 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory.
TESTING
INSPECTION
ENGINEERING
Field Number: 30 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/28/2021 Lab Log No.: 16789
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 5 of 6
Information provided by Field Technician
Mix #: 4000 Supplier: Cape Cod Ready Mix, Inc. Contractor: Silverback
Set: 5 of 6 Truck #: 68
Design Strength (psi): 4,000 @28
days Ticket#: 902718
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: Level 2 Slab on Metal Deck at Building D
Location when sampled: B/d21
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 71 50-90 Slump or Spread (in.): 8.0 6-10 Unit Wt (#cu ft): 150.6 149.3
Air Temperature (ºF): 56 >40 Air Content (%): 1.4 0-3 Time Sampled: 10:30 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 9:42 AM Time in Truck: 48 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/02/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 50,257 4,000 psi Type 2
B 28 11/25/2021 4.00 8.00 12.57 Fld
C 28 11/25/2021 4.00 8.00 12.57 Fld
D 28 11/25/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:4,000 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory.
TESTING
INSPECTION
ENGINEERING
Field Number: 30 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/09/2021
Client: PMA
Date of Sampling: 10/28/2021 Lab Log No.: 16789
Reviewed by: Daniel Minawi
11/09/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 6 of 6
Information provided by Field Technician
Mix #: 4000 Supplier: Cape Cod Ready Mix, Inc. Contractor: Silverback
Set: 6 of 6 Truck #: 62
Design Strength (psi): 4,000 @28
days Ticket#: 32296
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: Level 2 Slab on Metal Deck at Building D
Location when sampled: C/d23
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 71 50-90 Slump or Spread (in.): 8.0 6-10 Unit Wt (#cu ft): 150.0 149.3
Air Temperature (ºF): 55 >40 Air Content (%): 2.0 0-3 Time Sampled: 11:27 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 10:27 AM Time in Truck: 60 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/02/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 51,227 4,080 psi Type 2
B 28 11/25/2021 4.00 8.00 12.57 Fld
C 28 11/25/2021 4.00 8.00 12.57 Fld
D 28 11/25/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:4,080 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory.
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 09/03/2021 Lab Log No.: 16067 (3123)
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 62
Design Strength (psi): 3,500 @28
days Ticket#: 21747
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at Wall: T-W/a1, a1-8/W Spread footings: V/a4, U/a5, a6/V, a5/V.5, V and V.5/a8
Location when sampled: U/a5
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.7 143.1
Air Temperature (ºF): 82 >40 Air Content (%): 6.1 4.5-7.5 Time Sampled: 7:47 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:07 AM Time in Truck: 40 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/08/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/10/2021 Henry Soares 4.00 8.00 12.57 Lab 25,815 2,050 psi Type 5
B 28 10/01/2021 Henry Soares 4.00 8.00 12.57 Lab 39,020 3,100 psi Type 2
C 56 10/29/2021 Kevin Noel 4.00 8.00 12.57 Lab 45,645 3,630 psi Type 2
D 56 10/29/2021 Kevin Noel 4.00 8.00 12.57 Lab 46,022 3,660 psi Type 2
E 56 10/29/2021 Kevin Noel 4.00 8.00 12.57 Lab 44,144 3,510 psi Type 2
FAILS TO MEET DESIGN STRENGTH
56 Day Avg.:3,600 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory; Low 7 & 28-Day Indication test results. Specimens C-E will
be held for 56-Days.
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 09/09/2021 Lab Log No.: 16132 (3175)
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 58
Design Strength (psi): 3,500 @28
days Ticket#: 21775
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Footings
Location: Onsite
Location for overall pour: Level 1 Footings at L/b15-20, M.5/b17-21, N.5/a23-30
Location when sampled: M.5/b17
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 68 50-90 Slump or Spread (in.): 5.75 4-6 Unit Wt (#cu ft): 144.9 143.1
Air Temperature (ºF): 74 >40 Air Content (%): 5.7 4.5-7.5 Time Sampled: 7:43 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:04 AM Time in Truck: 39 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/15/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/16/2021 Henry Soares 4.00 8.00 12.57 Lab 30,168 2,400 psi Type 5
B 28 10/07/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 43,884 3,490 psi Type 2
C 28 10/07/2021 Matasem Nabulsi 4.00 8.00 12.57 Lab 43,804 3,480 psi Type 3
D 56 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Lab 53,340 4,240 psi Type 3
E 56 11/04/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Lab 50,970 4,050 psi Type 5
FAILS TO MEET DESIGN STRENGTH
56 Day Avg.:4,150 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory. Low 28-Day indication compression test results. The
design strength was met at 56-Days.
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 09/10/2021 Lab Log No.: 16133 (3176)
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 72
Design Strength (psi): 3,500 @28
days Ticket#: 31692
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Wall
Location: Onsite
Location for overall pour: Level 1 Wall at a2/T-K, b2/M.9,L.9,K.8
Location when sampled: L.9/b2
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 71 50-90 Slump or Spread (in.): 6.0 4-6 Unit Wt (#cu ft): 144.5 143.1
Air Temperature (ºF): 74 >40 Air Content (%): 6.1 4.5-7.5 Time Sampled: 7:21 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 6:57 AM Time in Truck: 24 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 09/15/2021 Technician that received: Henry Soares
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 09/17/2021 Henry Soares 4.00 8.00 12.57 Lab 29,264 2,330 psi Type 5
B 28 10/08/2021 Max Nabulsi 4.00 8.00 12.57 Lab 43,830 3,490 psi Type 2
C 28 10/08/2021 Max Nabulsi 4.00 8.00 12.57 Lab 43,391 3,450 psi Type 2
D 28 10/08/2021 Max Nabulsi 4.00 8.00 12.57 Lab 43,382 3,450 psi Type 2
E 56 11/05/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Lab 51,007 4,060 psi Type 5
FAILS TO MEET DESIGN STRENGTH
56 Day Avg.:4,060 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory. The 28-Day average strength measured below the concrete
mix design. The design strength was met at 56-Days.
TESTING
INSPECTION
ENGINEERING
Field Number: 4 Masonry Grout Compression Test
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 10/13/2021 Lab Log No.: 16522 (3413)
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3000 Supplier: Spec Mix Contractor:
Set: 1 of 1 Truck #: N/A
Design Strength (psi): 3,000 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C1019 Compressive Testing of Masonry Grout
(Grout Box)Type of Structure: Base plates
Location: Onsite
Location for overall pour:
Location when sampled: Building D
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 50-90 Slump (in.): NA N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 67 >40 Air Content (%): N/A N/A Time Sampled:
Aggregate Size (in): N/A N/A Batch Time: Time in Truck: <90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/18/2021 Technician that received: Luis Soto
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 10/20/2021 Luis Soto Soldevilla 3.47 3.52 6.72 12.21 84,896 6,950 psi
B 28 11/10/2021 Kevin Noel 3.48 3.54 6.76 12.32 105,426 8,560 psi
C 28 11/10/2021 Kevin Noel 3.46 3.48 6.71 12.04 93,272 7,750 psi
D 28 11/10/2021 Kevin Noel 3.41 3.48 6.76 11.87 90,039 7,590 psi
MEETS DESIGN STRENGTH
28 Day Avg.:7970
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 11/02/2021 Lab Log No.: 16876
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape Cod Ready Mix Contractor: Silverback
Set: 1 of 4 Truck #: 65
Design Strength (psi): 3,000 @28
days Ticket#: 22202
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building D
Location when sampled: A/d2
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 67 50-90 Slump or Spread (in.): 6.0 5-9 Unit Wt (#cu ft): 149.7 148.2
Air Temperature (ºF): 52 >40 Air Content (%): 1.2 0-3 Time Sampled: 7:25 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 6:52 AM Time in Truck: 33 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/09/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/09/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 37,724 3,000 psi Type 2
B 28 11/30/2021 4.00 8.00 12.57 Fld
C 28 11/30/2021 4.00 8.00 12.57 Fld
D 28 11/30/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,000 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 11/02/2021 Lab Log No.: 16876
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape Cod Ready Mix Contractor: Silverback
Set: 2 of 4 Truck #: 59
Design Strength (psi): 3,000
@28 days Ticket#: 170654
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building D
Location when sampled: B/d5
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 67 50-90 Slump or Spread (in.): 8.25 5-9 Unit Wt (#cu ft): 150.2 148.2
Air Temperature (ºF): 52 >40 Air Content (%): 1.4 0-3 Time Sampled: 7:50 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 7:07 AM Time in Truck: 43 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/09/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/09/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 33,019 2,630 psi Type 2
B 28 11/30/2021 4.00 8.00 12.57 Fld
C 28 11/30/2021 4.00 8.00 12.57 Fld
D 28 11/30/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:2,630 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 11/02/2021 Lab Log No.: 16876
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 3 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape Cod Ready Mix Contractor: Silverback
Set: 3 of 4 Truck #: 56
Design Strength (psi): 3,000 @28
days Ticket#: 32355
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building D
Location when sampled: A/d11
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 68 50-90 Slump or Spread (in.): 7.5 5-9 Unit Wt (#cu ft): 149.5 148.2
Air Temperature (ºF): 53 >40 Air Content (%): 1.8 0-3 Time Sampled: 9:00 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 8:22 AM Time in Truck: 38 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/09/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/09/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 39,880 3,170 psi Type 2
B 28 11/30/2021 4.00 8.00 12.57 Fld
C 28 11/30/2021 4.00 8.00 12.57 Fld
D 28 11/30/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,170 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 11/02/2021 Lab Log No.: 16876
Reviewed by: CJ Martens
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 4 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape Cod Ready Mix Contractor: Silverback
Set: 4 of 4 Truck #: 67
Design Strength (psi): 3,000 @28
days Ticket#: 32361
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building D
Location when sampled: C/d14
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 68 50-90 Slump or Spread (in.): 7.75 5-9 Unit Wt (#cu ft): 149.9 148.2
Air Temperature (ºF): 55 >40 Air Content (%): 1.7 0-3 Time Sampled: 10:15 AM
Aggregate Size (in): 3/4 3/4 Batch Time: 9:30 AM Time in Truck: 45 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 11/09/2021 Technician that received: WC
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 11/09/2021 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 38,186 3,040 psi Type 2
B 28 11/30/2021 4.00 8.00 12.57 Fld
C 28 11/30/2021 4.00 8.00 12.57 Fld
D 28 11/30/2021 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,040 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 4 Masonry Grout Compression Test
Project Name: Dennis Yarmouth Middle School Permit No.:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 11/11/2021
Client: PMA
Date of Sampling: 10/19/2021 Lab Log No.: 16691 (3463)
Reviewed by:
11/11/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3000 Supplier: Contractor:
Set: 1 of 1 Truck #: N/A
Design Strength (psi): 3,000 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C1019 Compressive Testing of Masonry
Grout (Grout Box)Type of Structure: Base plates
Location: Onsite
Location for overall pour:
Location when sampled: Building C
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 50-90 Slump (in.): NA N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 67 >40 Air Content (%): N/A N/A Time Sampled:
Aggregate Size (in): N/A N/A Batch Time: Time in Truck: <90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 10/26/2021 Technician that received: Henry Soares
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 10/26/2021 Henry Soares 3.37 3.41 6.87 11.49 23,642 2,060 psi
B 28 11/16/2021 Luis Soto Soldevilla 3.49 3.49 6.75 12.18 43,870 3,600 psi
C 28 11/16/2021 Luis Soto Soldevilla 3.40 3.40 6.88 11.56 45,137 3,900 psi
D 28 11/16/2021 Luis Soto Soldevilla 3.35 3.40 6.70 11.39 41,427 3,640 psi
MEETS DESIGN STRENGTH
28 Day Avg.:3710
Remarks: Received Sample Condition: Acceptable and/or Satisfactory