Loading...
HomeMy WebLinkAboutCorrespondence Grant, Kelly From:Grant, Kelly Sent:Monday, December 6, 2021 12:32 PM To:'John Arena' Subject:RE: Building Permit Application Hi John You will need to file a Request for Determination of Applicability. Information of the regulations and filing requirements can be found here https://www.yarmouth.ma.us/696/Filing-Forms DownCape Engineering who did you site plan are familiar with the process and can assist with an application. Regards Kelly Grant Conservation Administrator Town of Yarmouth 508-398-2231 Ext 1288 kgrant@yarmouth.ma.us From: John Arena \[mailto:jaarena@amherst.edu\] Sent: Monday, December 6, 2021 12:24 PM To: Grant, Kelly <KGrant@yarmouth.ma.us> Subject: Building Permit Application Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Kelly, Tim Sears gave me your email in regards to a permit application. We're looking to rennovate our top floor and are on a non-conforming lot with wetlands in the back of our property. I've attached a copy of the proposed septic design which shows the wetlands. What steps do I need to do to get the Conservation Commission sign off on the application? Thank you, Jack Arena Jack Arena Head Hockey Coach Amherst College (413) 542-7950 Fax- (413) 542-2026 1