Loading...
HomeMy WebLinkAboutEngineer Plans - 20214" CAST IRON or EQUIVALENT MIN. PITCH 1/4" PER FOOT pF i. (DATUM: ASSUMED) Yarmouth Health Department APPROVED STzrar-I-sem AkA..9s_ ;Ilr m+4 Name Date LEGEND -o--G G - GAS LINE W W W W. WATER LINE -E r r 9 9- EXIST. ELECTRIC 99 EXIST. CONTOURS - - - - - 99 PROP, CONTOURS .U,,� wg um UNDERGROUND UTIL. FLOW LINE 14" (PROPOSED) SEPTIC SYSTEM PROFILE (not to scale) INS! 2" Of b" to;" DOUBLE WASHED EL PEASTONE OR GEOTEXTILE FILTER FABRIC — (Amt2'to be level) \ �1 e Flaherty Environmental Services D P.O. Box 331 Harwich, MA 02645 774.994.9 966 (H-20 D -BOX) °o°o°o°o°o o°o°o° ' a ' .q ''°o°o°o°o� EL. ALL INLET TEE OVE OUTLET INVERT SOIL ABSORPTION SYSTEM (2) 500 GALLON H-20 CHAMBERS WITH 4' STONE AROUND IN A 5' to IZ' DOUBLE WASHED STONE 12,83'X 25'X 2' CONFIGURATION BOTTOM OF TEST HOLE EL. 43.0' 137,75' USGS ADJUSTMENT: 1.2' r 1IniruniArrn ci ev. Ac A' BO P"yi P I li2 I.0"� 2� 5' OVERDIG O 37.4' J / / \ PROP. S.T. BENCHMARK: TOP OF FNDN 30.9' CP / DRIVEWAY 159 C.O. GARAGE (SLAB) /. EXISTING 3 DWELLING PATIO EDWAM a L 7 2021 H DEPT. SCALE: 1" = 30' REF: PB 97 PG 15& PLAN ON FILEAT YHD REQUIRED; 5' REMOVAL OF UNSUITABLE MATERIAL LATERALLY AND BENEATH SAS TO EL. 48.0' WELL- SDW-252 ZONE- A READING- 47.1' DATE- 10/2021 ADT.- ,- 1.2' LOCATION MAP NTS DATE: 91/30!2021 I REVISED: I SITE AND SEWAGE PLAN FOR B & B EXCAVATION, INC./ STANLEY PUDLO 34 GINGERBREAD LANE VARMOUTNPORT, MA PAGE 1 OF2 GENERAL NOTES 1. ALL PRECAST COMPONENTS TO BE H-10 RATED UNLESS OTHERWISE SPECIFIED. DISTRIBUTION BOX AND ANY COMPONENTS WITH ANY ANTICIPATED VEHICULAR TRAFFIC TO BE H-20 RATED. 2. THE DESIGN OF THIS SYSTEM DOES NOT ALLOW FOR THE USE OFA GARBAGE GRINDER, 3. MUNICIPAL WATER IS AVAILABLE. 4. ALL CONSTRUCTION TO CONFORM WITH 310 CMR 15.000 AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS. 5. INSTALLER/CONTRACTOR TO REVIEW & VERIFY ALL ELEVATIONS AND DETAILS AND REPORT ANY DISCREPANCIES TO DESIGNER PRIOR TO CONSTRUCTION OR ASSUME ALL RESPONSIBILITY, 6. INSTALLER/ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE WORK AREA, VERIFYING ALL UTILITIES AND NOTIFYING "DIG SAFE" (1-888-344-7233) 72 HOURS PRIOR TO CONSTRUCTION. 7. ANY CHANGES TO OR DEVIATIONS FROM THIS PLAN MUST BE APPROVED IN WRITING BY FLAHERTY ENVIRONMENTAL SERVICES AND LOCAL BOARD OF HEALTH. 8. FINISH COVER OVER COMPONENTS IS NOT TO EXCEED 3' PER 310 CMR 15.000 UNLESS SHOWN PER PLAN. 9. ALL ABANDONED SEPTIC SYSTEM COMPONENTS TO BE PUMPED DRY AND FILLED WITH CLEAN SAND OR REMOVED AND REPLACED WITH CLEAN SAND. 10.ALL COMPONENTS TO BE PROVIDED WITH WATERTIGHT ACCESS PORTS WITHIN 6" OF FINISH GRADE. II.ALL SEPTIC TANKS, DISTRIBUTION BOXES AND PIPING TO BE INSTALLED WATERTIGHT. 12.NO KNOWN WETLANDS OR WELLS WITHIN 150 FEET OF PROPOSED LEACHING. 13. THIS IS NOT A CERTIFIED PLOT PLAN AND UNDER NO CIRCUMSTANCES IS THIS PLAN TO BE USED FOR ZONING OR BUILDING PURPOSES. 14. LOT IS SHOWN AS ASSESSOR'S MAP 122 LOT 27 . 151OCUS PROPERTY IS NOT LOCATED WITHIN AN AQUIFER PROTECTION DISTRICT (ZONE II). 16, NO OTHER FOUNDATIONS OR SEPTIC SYSTEMS WITHIN 20' OF PROPOSED SAS. DESIGN CALCULATIONS SYSTEM DETAIL Flaherty Environmental Services 10YR 312 B P. 0. Box 331 10YR 5/6 C1 Harwich, MA 02645 NUMBER OFACTUAL BEDROOMS 3 774.994.1166 GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW (I 10 GALIB RIDAYX 3 BR) 330 GAL./DAY REQUIRED SEPTIC TANK CAPACITY 660 GAL. SIZE OF SEPTIC TANK 1500 GAL. (PROPOSED) -25 S' REMOVAL OF UNSUITABLE MATERIAL TO EL. SOIL CLASSIFICATION 1 DESIGN PERCOLATION RATE < 5 MIN.ANCH- . EFFLUENT LOADING RATE 0.74 GAL./DAYIFT2 LEACHINGAREA O 12.83' (2) x (25.0'+ 12.83)(2) = 151 SF 25.0' x 12.83' = 320 SF 471 SF x 0.74 = 348 GPD + t USE (2) 500 GALLON H-20 CHAMBERS WITH 4' STONE IN A 12.83'X 25' CONFIGURATION AS DIAGRAMMED RESERVE LEACHING CAPACITY 348 GPD SOIL EVALUATION TEST HOLE #1 Evaluator. David D. Flaherty Jr, RS, REHS SE # 2755 BOH Witness: Bruce Murphy, RS, CHO Date: November 16, 2021 TH-1 ELEV. 58.0' 0"- 12" 12"-28" 28"- 120" ELEV. 48.0' 120"-180" G. W. ELEV. 46.0' BOTTOM TH-1 ELEV. 43.0' A SL 10YR 312 B SL 10YR 5/6 C1 Silt Loam 10YR 4/4 C2 FS 10YR 616 WELL: SDW-252 ZONE: A READING: 4709 (47.1) DATE: 1012021 ADJ: 1.2' (NTS) "I certify that on November 12, 2002, l have passed the examination approved by the Department of Environmental Protection and that the above analysis has been performed by me consistent with the SIEVE SAMPLE _ required training, expertise, and experience described CSEE ATTACHED) in 310 CMR 15.018(2)." SITE AND SEWAGE PLAN FOR B & B EXCAVATION, INC./ STANLEY PUDLO 34 GINGERBREAD LANE YARMOUTHPORT, MA PAGE 2 0F2 DATE: 1113012021