Loading...
HomeMy WebLinkAboutEngineer Plan - 2001SYSTEM PROFILE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO 'f MINIMUM .75' OF COVER OVER PRECAST WITHIN 6" OF FIN, GRADE EXISTING 1000_ GALLON SEPTIC TANK (H— 10 ) DEPTH OF FLOW m 4' TEE SIZES: LS 10 INLET DEPTH = 10YR 2/2 OUTLET DEPTH = 14" PARCEL 87 1.74 ACRES Ot RUN PIPE LEVEL FOR FIRST 2" R_u__ rl 52.51 GAS 50.98 ' BAFFL 50.98' 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 (2v MIN (__L_% SLOPE) FOUNDATION— EXIST. — SEPTIC TANK 61 k CONFIRM INVERT OUT OF TANK PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM. CONTACT ENGINEER IF FOUND TO BE LOWER IN ELEVATION THAN WHAT IS SHOWN. BENCHMARK: STAKE SETT / O `WH_PINE AT ELEVATION 53.0' f� 82-053 DWELL. (CRAWL) x EXIST. OFFICE tw. APPROX. LOCATD 0(mm MC SMEM "—EXIST. ST (RE -USE) LP h GRAVEL PARKING/DRNEWAY \ z 29 SLOPE REQUIRED OVER SYSTEM EXISTING BUILDING 2" DOUBLE WASHED PEASTONE 53.3' .S3 Cir �r.�.�.�.� � �� -• r 3' 0 3 LEACHING FACILITY BOTTOM C2 LAYER 44.8 TEST HOLE LOGS ENGINEER: A.H. OJALA, PE, PLS WITNESS: AMY VON HONE, RS DATE:-- MAY 16, 2001 PERC. RATE _ < 2 MIN/INCH IN C1 CLASS I & II SOILS P# ELEV. O" 53-3 NO WATER ENCOUNTERED NOTE: EXIST. DWELL. - 1 BEDROOM EXIST. OFFICE WILL BE 2 BEDROOM SEPTIC DESIGN _ (GA1 BaGE DISPOSER NOT AL .OWED DESIGN FLOW: 3_ BEDROOMS ( L 1U GPD) - j_'SzPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A !nCL GALLON SEPTIC TANK (EXIST) LEACHING: 2 30 + 9.83)2 (.74) = 117.9' SIDES: -- BOTTOM: 30 x 9.83 (74) = 218.2 TOTAL: 454 S.F. 336 GPD USE (4) H-20 HIGH CAPACITY INFILTRATORS WITH 3.5' STONE AT SIDES, 2.5' AT ENDS AND 14" UNDER ' LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR — 100 — EXISTING CONTOUR )ITABLE) 70 epi } F� ti I �O LOCUS Q-OJS�� �q yF c LOCATION MAP NOT TO SCALE ASSESSORS MAP 143 PARCEL 87 NOTES: APPROXIMATED FROM QUAD 1. DATUM IS ---- -- — — -----–----_.. 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H– 10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. PUMP & REMOVE (OR FILL W/CLEAN SAND) EXISTING FAILED LEACH PIT. TITLE 5 SITE PLAN of 926 MAIN STREET IN THE TOWN OF: rH7EALTH YARMOUTH PORT N 0 7 2001 PREPARED FOR: PETER BROWN DEPT. 30 0 30 60 90 BOARD OF HEALTH EALTTH MA SCALE: 1„ 30' DATE: MAY 17, 2001 AP ROVED DATE off 506-362-4541 fox 508 362-9880 down cope engineering, Inc.�� MNEH r��`t ARNE�J4-i. CIVIL ENGINEERS �V`L Ha LAND SURVEYORSb 939 main St. yarmouth, ma 026/5 A H. OJALA, ., P.L.S. DATE A LS 6„ 10YR 2/2 B LS 30" IOYR 4/6 50.80 C1 LS erc 60„ 2.5Y 6/4 C2 MS 102" 44.8' C3 (UNSI FSL 156" 40.3 NO WATER ENCOUNTERED NOTE: EXIST. DWELL. - 1 BEDROOM EXIST. OFFICE WILL BE 2 BEDROOM SEPTIC DESIGN _ (GA1 BaGE DISPOSER NOT AL .OWED DESIGN FLOW: 3_ BEDROOMS ( L 1U GPD) - j_'SzPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A !nCL GALLON SEPTIC TANK (EXIST) LEACHING: 2 30 + 9.83)2 (.74) = 117.9' SIDES: -- BOTTOM: 30 x 9.83 (74) = 218.2 TOTAL: 454 S.F. 336 GPD USE (4) H-20 HIGH CAPACITY INFILTRATORS WITH 3.5' STONE AT SIDES, 2.5' AT ENDS AND 14" UNDER ' LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR — 100 — EXISTING CONTOUR )ITABLE) 70 epi } F� ti I �O LOCUS Q-OJS�� �q yF c LOCATION MAP NOT TO SCALE ASSESSORS MAP 143 PARCEL 87 NOTES: APPROXIMATED FROM QUAD 1. DATUM IS ---- -- — — -----–----_.. 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H– 10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. PUMP & REMOVE (OR FILL W/CLEAN SAND) EXISTING FAILED LEACH PIT. TITLE 5 SITE PLAN of 926 MAIN STREET IN THE TOWN OF: rH7EALTH YARMOUTH PORT N 0 7 2001 PREPARED FOR: PETER BROWN DEPT. 30 0 30 60 90 BOARD OF HEALTH EALTTH MA SCALE: 1„ 30' DATE: MAY 17, 2001 AP ROVED DATE off 506-362-4541 fox 508 362-9880 down cope engineering, Inc.�� MNEH r��`t ARNE�J4-i. CIVIL ENGINEERS �V`L Ha LAND SURVEYORSb 939 main St. yarmouth, ma 026/5 A H. OJALA, ., P.L.S. DATE