HomeMy WebLinkAboutCOC requestCAPE COD ENGINEERING, INC.
Robert M. Perry, P.E.
P.O. Box 1517
Fast Dennis, NIA 02641
Tel 508-385-1445 1 Fax 508-385-1446
bobperryrayapecod.net
December 16, 2021
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
RE: 165 Mayflower Terrace. South Yarmouth; SE 83-1 169 - Certificate of Compliance —Kitchen
& Deck, Pilings, Float & Bulkhead— George Degiacomo
To the Conservation Commission,
Attached please find Form 8A and a check in the amount of $75 for a Certificate of Compliance review
for 165 Mayflower Terrace, South Yarmouth. 1 have reviewed the site and am providing a summary as
follows.
The kitchen and deck activities were carried out in compliance. A crushed stone surface outdoor use
area now exists between the deck and a fence near the top of the coastal bank. This area was likely an
open area at the time of the application, but no details are known about it. A row of native shrubs
proposed as mitigation, indicated on the plan, does not appear to be completed. The applicant has
expressed willingness to plant any required native shrubs. The site does not appear to be undergoing
any significant erosion although the fence at the top of the bank could have posts straightened in
connection with the remedial native shrub work. Guidance from the agent is requested.
Pier, ranw, float and bulkhead
The bulkhead was not built under this Order of Conditions, A second Order of Conditions for SE83-
1356 was issued and is addressed in a separate COC application.
Ramps — The existing ramp was 12 ft. long the 2021 ramp is 16 ft. long overlapping the float
approximately 2 ft.
Float dock - By inspection of the 2021 seasonal conditions, the float and ramp were established with
different dimensions than appearing on the plan of record. The plan of record proposed an 8 ft. x 8 ft.
float at the end of the 4 ft. width float facility that existed at the time of the filing. The total float area
provided by the approval would add 64 sq. ft. for a total float area of 192 sq. ft. The ramp and float
were intended to extend 53 ft. seaward from the pile supported boathouse pier.
Current Condition : The constructed 16 ft. long ramp connects to a 3 ft. wide float extending 48 ft.
from the boathouse pier. A 9.5 ft. 1. X 3 ft. w. "T" float at the ramp juncture appears to provide side to
side pitch stability for the longer 3 ft. wide float. The float area as measured during the compliance
inspection was 116 sq. ft. The licensed float area is 152 sq. ft,
Since the existing float area is 76 s. f less than the OOC - approved float area, total length extent into the
waterbody is 5 ft. shorter, and a longer ramp also relieves the waterbody of in -water structure, a
reasonable conclusion can be reached that this project portion is in compliance.
Please contact me to review any questions.
Sincerely,
Cape Cod Engine ing, Inc.
Robert M. rry
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
DI=P File Number. -
Lill
WPA Form 8A — Request for Certificate of Compliance
SE 83-1169
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
Important:
When filling out
1 . This request is being made by:
forms on the
Cape Cod Engineering, Inc.
computer, use
Name -
only the tab
key to move
PO Box 1517
your cursor-
Mailing Address
do not use the
East Dennis MA
02641
return key.
City/Town J State
Zip Code
508-385-1445
IC—V
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
"n
George DeGia_c_o_mo
Applicant
3/6/1992 SE 83-1169
Dated DEP File Number
Upon completion
of the work 3-
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance 4'
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
The project site is located at:
165 Mayflower Terrace
Street Address
120
Assessors Map/Plat Number
South Yarmouth
City/Town
9
Parcel/Lot Number
The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
Certificate (if registered land)
5. This request is for certification that (check one):
. ;x
30
Page
❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
® the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
Please see attached letter
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc -- rev- 5129114 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form HA — Request for Certificate of Compliance
DEP File Number:
SE 83-1169
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143 _
A. Project Information (cant.)
B. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. if the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http;llwww,mass.govleealagencies/massdep/about contacts/find-the-massdep-regional-office-
for- a r- it - r-t wn.html).
wpaform8a.doc -- rev. 5129114 Page 2 of 2