Loading...
HomeMy WebLinkAboutCOC requestCAPE COD ENGINEERING, INC. Robert M.. Perry, P.E. P.U. Bog 1517 East Dennis, MA 02641 Tel 508-385-1445 / Fax 508-385-1446 bobperryAcapecod.net December 20, 2021 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: 165 Mayflower Terrace, South Yarmouth; SE 83-1356 - Certificate of Compliance — Bulkhead Repair — Geme Degiacom❑ To the Conservation Commission, Attached please find Form 8A and a check in the amount of $75 for a Certificate of Compliance for bulkhead repair at 165 Mayflower Terrace, South Yarmouth. The project represents replacement of a formerly existing low profile wood bulkhead. The replacement bulkhead was installed in compliance with the approved plan with the 2 following exceptions. The wall extends north of the existing stairway approximately 12 ft. This choice for a north extension was likely driven by observed erosion that would have been included in the original design. The bulkhead construction occurred quite a few years after the original approval. The low height wall is a cantilevered wall as constructed, unanchored and appears stable. Given the stable site conditions and minor, necessary added length, I certify that the project meets the requirements for a Certificate of Compliance. Sincerely, Cape Cod En 'neering, I Robert M. Perry/ Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. IL�I Massachusetts Department of Environmental Protection C1EP File Number: Bureau of Resource Protection - Wetlands WVPA Form 8A — Request for Certificate of Compliance SE 83-1356 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DER Town of Yarmouth Wetland By-law,_Chapter 143 A. Project Information 1. This request is being made by: Cape Cod Enqineerinq, Inc Name PO Box Mailing Address East Dennis MA 02541 CitylTown 608-385-1445 Phone Number State 2. This request is in reference to work regulated by a final Order of Conditions issued to: Upon completion of the work 3• authorized in an order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. George DeGiacomo Applicant 4/24/1996 Dated The project site is located at: 165 Mayflower Terrace Street Address 120 SE 83-1356 DEP File Number South Yarmouth _u CitylTown 9 Assessors Map/Plat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner {if different} Barnstable County (if registered land) 5. This request is for certification that (check one): 10190 Book /—iP uuuts 305 Page ❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ® the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). Please see attached letter_-- ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a. dm •- Fe . 512gi 14 Page 1 & 2 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form SA — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chanter 143 A. Project Information (cant.) DEP Fife Number: 5E 83-1356 Provided by DEP 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DER Regional Office (see http:liwww.mass.gov/eea/agencieslmass_dep/abouticontacts!find_the-massdeo-regional-office- for-you r-city-or-town. html ). wpaformSa.doc -- rev. W2W14 Page 2 of 2