Loading...
HomeMy WebLinkAboutSite Plan 11-30-21PROPOSED 4'x29't RAISED PIER; DECK HEIGHT = 7.7't NAVD88 LAWN EX. RET. SALT MARSH �{ WALL �►EXISTING PIER EXTEND LANDWARD TO MEET GRADE MUMMWP]ITRI 10 5 0 10 20 40 1 "=20' RELOCATED 3'x14' RAMP PROPOSED 4'x32.5t' PIER " EXTENSION; DECK HEIGHT PROPOSED 4'x10' FLOAT = 5.3't NAVD88 CTION A -A PLAN VIEW 215 Q 10 20 1"=10' PIER, RAMP, AND FLOATS EXTEND 80' BEYOND MHW PIER EXTENSION RELOCATED 3'x14' RAMP PROPOSED 4 x32.5t PIER EXTENSION; DECK HEIGHT PROPOSED 4'x10' FLOAT 1VD88 = 5.3't NAVD88 / PROPOSED 8" X 24' LONG ANCHOR PILES (2 TOTAL) PROPOSED 8'x20' FLOAT SECTION A -A ELEVATION DETAIL 5 2.5 Q 5 10 20 DCE ¢#20-147 1"=10' --MHVV= 1.�j 0 2 —4 —6 to N N Xr rj ,\\ E \ DOCK PLAN VIEW DETAIL 5 2.5 0 5 10 20 i ft 41 2"W' AZEK RAILING CAP 4%4" POST BOLTED THROUGH YOKES AND 2%4" RAILING (TYP) JOISTS (TYP) ROPE MID RAIL 2"x8" STRINGERS (3 TOTAL, TYP) 12"XIS" AZEK DECKING OR (2) Sx8" 3/4" THROUGH —BOLTS (TYP) --3%8" YOKE; (2) TYP. ___� 3"x8" CROSS BRACING, (TYP) — -Y4" THROUGH BOLT WITH DOCK WASHERS (TYP) 8" "PEARSON" FIBERGLASS PILES II INSTALL SCREW ANCHOR AT EACH BENT BEYOND MHW TO PREVENT ICE UPLIFT (Optional) DOCK SECTION B-B ELEVATION DETAIL 17.5 4 1 4 1"=2' 1 1 jC LEGEND rI / MHw MEAN HIGH WATER \\ BASS RIVER J iwLw MEAN LOW WATER 4� —2— ELEVATION CONTOUR O <� PROPERTY LINE�0� 9 MEMO LIMIT OF WORK/ACCESS L I SHELLFISH SURVEY GRID LOCUS �o DINARS U P IIE R SHELLFISH FOUND IN GRID POND AE SURVEY NOTES: 1 / / 1 RECORD OWNER, l i 1 THOMAS A. DWYER AND LISA G. DWYER 1 DWYER REALTY TRUST YARMOUTH, MA 1 INTERVALE ROAD, DEDHAM, MA 02026 KEY MAP 1 I ASSESSORS MAP 120, PARCEL 12 1" = 800't I 1 DEED BK. 28031 PG. 33 PLAN BK. 79, PG. 101; LOT 66 PROPERTY LIES WITHIN RESIDENTIAL ZONE R40. O PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD SURVEY BY DOWN CAPE ENGINEERING IN JULY, 2020 AND 1 COMPILED FROM PLANS ON RECORD RECORDED IN THE BARNSTABLE COUNTY REGISTRY OF DEEDS. PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 9' \ NAVD 88) PER FIRM PANEL #583 OF 875, COMMUNITY MAP \ NUMBER 25001CO583J EFFECTIVE DATE JULY 16, 2014 AS SHOWN ON THE FEMA ON-LINE DATA BASE. DATUM FOR ALL ELEVATIONS = NAVD 88 MEAN HIGH WATER = 1.9' NAVD 88 MEAN LOW WATER = -0.3 NAVD 88 i_ SOURCE; DIRECT MEASUREMENT WITH HOBO U20L WATER LEVEL LOGGER BY SHOREFRONT CONSULTING THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS THEREFORE NOT SUBJEf TO MESA REVIEW CONSTRUCTION NOTES: 1. ELEVATIONS REFER TO NAVD 88. CONTACT DOWN CAPE ENGINEERING FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED. 2. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE PLAN AND DIRECTLY OVER THE APPLICANT'S PROPERTY. 3. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE PROPOSED WORK. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES. 4. THE DOCK INSTALLATION SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND. AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE MARSH. 5. A WORK LIMIT SHALL BE MAINTAINED TO INSURE MINIMAL ACTIVITY IN THE THE EXISTING MARSH WITH MINIMAL ACTIVITY OCCURRING BEYOND THE WORK LIMIT. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY DURING TIMES OF HIGH TIDE AND WHEN NOT IN USE. WORKING BARGE TO BE ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE. 6. PILES SHALL BE DRIVEN TO THE DEPTHS SPECIFIED ON THE PLAN. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED BEFORE PROCEEDING. PILES CAN BE INITIALLY JETTED TO SET, BUT THEN SHALL BE MECHANICALLY DRIVEN FROM THE WORKING BARGE. EACH BENT BEYOND MHW SHALL BE ANCHORED TO THE BOTTOM WITH A HELICAL OR MANTA STYLE ANCHOR FOR PROTECTION OF ICE UPLIFT. 7. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE —CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE. 8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE —CONSTRUCTION CONTOURS AND CONDITIONS. 9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK. 10. ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING. 11. THE RECONSTRUCTED AND LENGTHENED DOCK SHALL BE RAISED UP IN ACCORDANCE WITH THE PLAN AND SUPPORTED ON PERMANENT PILES. THE EXISTING RAMP CAN BE REUSED. ALL DECKING AND HANDRAILS SHALL BE AZEK OR EQUAL. RAMP SHALL UTILIZE THRU—FLO GRATING OR BE ALUMINUM AT APPLICANT'S OPTION. 2"x6" AZE`{ RAILING B CAP (TYP; ROPE MID RAIL 2"x4" RAILING (TYP) 5/8" THROUGH 2"x6" AZEK DECKING W/ )14" BOLT�T P SPACING; OVERLAP 1" (TYP) 3"x8" YOKE;" 3/4" THROUGH (2) TYP. BOLT WITH DOCK WASHERS (TYP) . . �S'x8" CROSS BRACING, (TYP) i 8" FIBERGLASS PILES (TYP) B DOCK SECTION �-A ELEVATION DETAIL 1"=2' NO PART OF THIS DRAWING MAY BE USED BY ANY PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF SHOREFRONT CONSULTING AND DOWN CAPE ENGINEERING, INC. NO. OA E R"MN BY SHEET TITLE PLAN SHOWING PROPOSED PIER RECONSTRUCTION AND EXTENSION PRg1ECT NO. SC-154 E AS SHOWN m 8/9/21 mma THOMAS AND LISA DWYER 160 MAYFLOWER TERRAQ.F SOUTHY MO TH MA Om"w MCS CHMKEOW DO oaarn"c Na DWYER.OWG DOWN CAPE ENGINEERING 939 MAIN STREET YARMOUTHPORT, MA 02675 (508) 362-4541 SHOREFRONT CONSULTING 290 CENTER STREET DENNIS PORT, MA. 02639 (508) 280-8046 WWW.SHOREFRONTCONSULTING.COM C- 1 a SHEETS