All filings must be made on Town of Yarmouth forms.
CONSERVATION
DIVISION
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
1 complete original application, plan/sketch, and other supporting information
to the Conservation Division - mailed to/dropped off at Town Hall.
1 complete pdf of application, plan/sketch, and other supporting information
emailed to kgrant -varmouth.ma.us.
�/ Statement from Engineer and/or stamped As -Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d).
Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • k�rant(warmouth.ma.us
Rev 8/2021
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
January 6, 2022
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Ref: 11 North Cove Landing, South Yarmouth (SE83-878)
Dear Commission Members:
tel. (508) 3624541
fax (508) 362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On April 28, 1988, the Commission issued an Order of Conditions for the above -
referenced site, for the construction of a new retaining wall, building supports, grading,
and pavement/driveway improvements.
A site visit was made in January of 2022. To the best of my knowledge and belief, the
proposed work was constructed in substantial compliance with the approved plan and
Order of Conditions.
We respectfully request the issuance of a Certificate of Compliance.
Thank you for your consideration.
Very truly yours,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
Important: 1
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
rab
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
2
This request is being made by:
Kenneth W. Rodgers
Name
136 Mariner Lane
DEP File Number:
SE 83-878
Provided by DEP
Mailing Address
Bayshore NY 11706
Cityrrown State Zip Code
914409-2706
Phone Number
This request is in reference to work regulated by a final Order of Conditions issued to:
Carol H. Holden
Applicant
4-28-1988
Dated
3. The project site is located at:
11 North Cove Landing
Street Address
52
Assessors Map/Plat Number
SE 83-878
DEP File Number
Yarmouth
CityTown
2
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
Certificate if registered land)
5. This request is for certification that (check one):
6266
106
Page
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above- referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
DEP He Number:
SE 83-878
Provided by DEP
6. Did the Order of Conons for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
wpaform8a.doc ••rev. 5/29/14
Page 2 of 2
'�'
{� r.
t��
.,
r��� �� e7�,��� o�ti
,j-(i , ` �
117 � t � � ash- ��
.��'� i � yr, �7
. �` <� �r,
f `
� � I � ��
f� �, r,
� '� ,', d�
�', , 91 �i ,, � , ' .
�� , , �� � �ti t �,
�,
� ; �t,� � t
� � '� '�<
. , ,
i,; t
{t � � �
� ��
�(tit 1 �"' y
r'�,. � �,
l.. .1,i.i .. t ..::.1 ..... ��, �.. A>..�