Loading...
HomeMy WebLinkAboutCOC request Shorefront Consulting Professional Services on Land or At Sea 290 Center St., Dennis Port, MA 02639 www.shorefrontconsulting.com 508-280-8046 shorefrontconsulting@gmail.com Yarmouth Conservation Commission January 12, 2022 Attn: Kelly Grant 1146 Route 28 South Yarmouth, MA 02664-4492 By hand delivery and email Re: Request for Certificate of Compliance (2 of 2); Dock project; SE83-1289; Proposed Reconstruction of Existing Permitted and Licensed Bulkhead Patricia Drenzek 11 Swordfish Drive South Yarmouth, MA 02664 Map 25, Parcel 11 On behalf of my client, Patricia Dresnek, please accept this request for a Certificate of Compliance for the above referenced project. The dock work was completed, but Google Earth does not show it clearly until at least December of 2001 (landing only; winter), and not clearly until 2010. The order of conditions was reviewed, and a site inspection was performed by Shorefront Consulting on January 12, 2022. The order of conditions did not require an as-built plan. The pier, ramp, floats and bulkhead have been measured and found to be in compliance with one exception. The ramp is 2.5 feet wide, but 14 feet long instead of 12. The distance for the floats from the east property line shown on the 1994 permit plan appears to be 27 feet. The float was measured in Google Earth and conforms to this dimension. Therefore, the floats are where they are supposed to be; the ramp just overhangs them more than the permit plan shows. This does not affect the permitted footprint because the ramp lands on the float. The ramp was likely extended to reduce the angle at low tide. This is a common condition, and has no effect on the compliance of the project. There were no holes in the bulkhead, and the required 10’ of buffer strip is in place. Therefore, with one exception noted, the project has been completed in accordance with the Order of Conditions, and all Special Conditions contained in SE83-1289 issued on 7/14/1994. Attached please find Yarmouth form WPA-8A Request for Certificate of Compliance, photos of the completed project, and a check for $150 made payable to the Town of Yarmouth which covers the fee for both COC requests. Please include this request in your next public hearing. The original Certificate of Compliance should be mailed to Shorefront Consulting for recording. If there are any questions or concerns regarding this request, please contact me as soon as possible. Sincerely, Mark Burgess Shorefront Consulting Enclosures: As Stated cc: Patricia Drenzek (Applicant) wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE83-1289 Provided by DEP A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. This request is being made by: Patricia Drenzek Name 94 Greenwich Road Mailing Address Ware City/Town MA State 01082 Zip Code 413-967-5427 Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Charlotte Lizak Applicant 7/14/1994 Dated SE83-1289 DEP File Number Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 3. The project site is located at: 122 Mayflower Terrace Street Address South Yarmouth City/Town Map 25 Assessors Map/Plat Number Parcel 11 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Charlotte Lizak Property Owner (if different) Barnstable County 9298 Book 82 Page Certificate (if registered land) 5. This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE83-1289 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). Patricia Drenzek–11 Swordfish Drive, South Yarmouth –Pictures for Dock COC Se83-1289 Photos showing existing timber bulkhead, pier, ramp, and floats 5/12/21