Loading...
HomeMy WebLinkAboutSand Dollar COMlong roof ltbs 8 and 3.5-wall 6COMcheck Software Version 4.1.4.3 Envelope Compliance Certificate Project Title: 90.1 (2016) Standard Project Type:New Construction Vertical Glazing / Wall Area:0% Location:West Yarmouth, Massachusetts Climate Zone:5a Construction Site: Owner/Agent: Sand Dollar West Yarmouth, MA Designer/Contractor: Project Information Energy Code: Performance Sim. Specs:EnergyPlus 8.1.0.009 (EPW: USA_RI_Providence- T.F.Green.State.AP.725070_TMY3.epw) Building Area Floor Area 1-Workshop : Nonresidential 7047 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Floor 1: Slab-On-Grade:Unheated, Vertical 4 ft., [Bldg. Use 1 - Workshop] (d) 380 ---10.0 0.480 0.520 Roof 1: Other Metal Building Roof, [Bldg. Use 1 - Workshop] (b)7445 ------0.030 0.037 EAST Exterior Wall 1: Other Metal Building Wall, [Bldg. Use 1 - Workshop] (b)6935 ------0.147 0.050 Window 2: Metal Frame:Fixed, Perf. Specs.: Product ID www.expi, SHGC 0.32, VT 0.05, [Bldg. Use 1 - Workshop] (c) 32 ------0.520 0.380 Door 4: Insulated Metal, Swinging, [Bldg. Use 1 - Workshop]84 ------0.498 0.370 Door 5: Insulated Metal, Non-Swinging, [Bldg. Use 1 - Workshop]2276 ------0.038 0.310 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)'Other' components require supporting documentation for proposed U-factors. (c)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (d)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.4.3 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Envelope PASSES: Design 1% better than code Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 111 ofPage Name - Title Signature Date Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 112 ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.4.3 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2016) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2, 5.4.3.1.1, 5.7 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable 4.2.2, 8.4.1.1, 8.4.1.2, 8.7 [PR6]2 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Complies Does Not Not Observable Not Applicable 5.5.4.2.3 [PR7]2 In buildings > 2,500 ft2, any enclosed spaces directly under a roof with ceiling heights > 15 ft. and used as an office, lobby, atrium, concourse, corridor, storage (including nonrefrigerated warehouse), gymnasium, fitness/exercise area, playing area, gymnasium seating area, convention exhibit/event space, courtroom, automotive service, fire station engine room, manufacturing corridor/transition and bay areas, retail, library reading and stack areas, distribution/sorting area, transportation baggage and seating areas, or workshop, the following requirements apply: The daylight zone under skylights is >= half the floor area and (a) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40 or (b) the minimum skylight effective aperture >= 1 percent. The skylights have a measured haze value > 90 percent. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 113 ofPage Section # & Req.ID Footing / Foundation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 4.2.4 [FO1]2 Installed below-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. R-_____R-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 4.2.4 [FO3]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. R-_____ Unheated Heated R-_____ Unheated Heated Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable 5.5.3.5 [FO5]2 Slab edge insulation depth/length. _____ ft _____ ft Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.7 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable 5.8.1.7.3 [FO7]1 Insulation in contact with the ground has <=0.3% water absorption rate per ASTM C272. Complies Does Not Not Observable Not Applicable 6.4.4.1.5 [FO11]3 Bottom surface of floor structures incorporating radiant heating insulated to >=R-3.5. R-_____R-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 114 ofPage Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.4.3.2 [FR1]3 Factory-built and site-assembled fenestration and doors are labeled or certified as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable 5.4.3.4 [FR4]3 Vestibules are installed where building entrances separate conditioned space from the exterior, and meet exterior envelope requirements. Doors have self-closing devices, and are >=7 ft apart (>= 16 ft apart for adjoinging floor area >= 40000 sq.ft.). Vestibule floor area <=7 50 sq.ft. or 2 percent of the adjoining conditioned floor area. Complies Does Not Not Observable Not Applicable 5.5.4.3a [FR8]1 Vertical fenestration U-Factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.3b [FR9]1 Skylight fenestration U-Factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.4.1 [FR10]1 Vertical fenestration SHGC value.SHGC:_____SHGC:_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.5.4.4.2 [FR11]1 Skylight SHGC value.SHGC:_____SHGC:_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.2.1, 5.8.2.3, 5.8.2.4, 5.8.2.5 [FR12]2 Fenestration products rated (U- factor, SHGC, and VT) in accordance with NFRC or energy code defaults are used. Complies Does Not Not Observable Not Applicable 5.8.2.2 [FR13]1 Fenestration and door products are labeled, or a signed and dated certificate listing the U- factor, SHGC, VT, and air leakage rate has been provided by the manufacturer. Complies Does Not Not Observable Not Applicable 5.5.3.6 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. U-_____ Swinging Nonswinging U-_____ Swinging Nonswinging Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.4.3.1 [FR15]1 Continuous air barrier is wrapped, sealed, caulked, gasketed, and/or taped in an approved manner, except in semiheated spaces in climate zones 1-6. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 115 ofPage 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 116 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions 8.4.2 [EL10]2 At least 50% of all 125 volt 15- and 20-Amp receptacles are controlled by an automatic control device. Complies Does Not Not Observable Not Applicable 8.4.3 [EL11]2 New buildings have electrical energy use measurement devices installed. Where tenant spaces exist, each tenant is monitored separately. In buildings with a digital control system the energy use is transmitted to to control system and displayed graphically. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 117 ofPage Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 4.2.4 [IN2]1 Installed roof insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection. R-_____ Above deck Metal Attic R-_____ Above deck Metal Attic Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2, 5.8.1.3 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the ceiling slope is <= 3:12. Complies Does Not Not Observable Not Applicable 4.2.4 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. R-_____ Mass Metal Steel Wood R-_____ Mass Metal Steel Wood Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable 4.2.4 [IN8]2 Installed floor insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. R-_____ Mass Steel Wood R-_____ Mass Steel Wood Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 5.8.1.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate has been provided listing R-value and other relevant data. Complies Does Not Not Observable Not Applicable 5.8.1.9 [IN18]2 Building envelope insulation extends over the full area of the component at the proposed rated R or U value. Complies Does Not Not Observable Not Applicable 5.8.1.4 [IN11]2 Eaves are baffled to deflect air to above the insulation. Complies Does Not Not Observable Not Applicable 5.8.1.5 [IN12]2 Insulation is installed in substantial contact with the inside surface separating conditioned space from unconditional space. Complies Does Not Not Observable Not Applicable 5.8.1.6 [IN13]2 Recessed equipment installed in building envelope assemblies does not compress the adjacent insulation. Complies Does Not Not Observable Not Applicable 5.8.1.7.1 [IN15]2 Attics and mechanical rooms have insulation protected where adjacent to attic or equipment access. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 118 ofPage Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 5.8.1.7.2 [IN16]2 Foundation vents do not interfere with insulation. Complies Does Not Not Observable Not Applicable 5.8.1.8 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 119 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 5.4.3.3 [FI1]1 Weatherseals installed on all loading dock cargo doors in Climate Zones 4- 8. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 1110 ofPage Project Title: Data filename:C:\Users\gmpa\Desktop\COMcheck\COM 4.0.8.2-CC BODE- Sand dollar.cck 01/15/22Report date: 1111 ofPage