Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 34 Lot 2-44 'INZone of Contribution: In Out X Acreage Commercial: Residential: 1( Street: Village: 71.4 Floor Plan: #Bedrooms: Owner: r L L o Installer: go,vra Address: Phone: Phone: Builder: Engineer: £ Address: Phone: Phone: N/A YES NO 1.Required#of copies received ✓ 2.Date of soils exam and percolation test not older than 2 years ✓ 3.4-5 ft of naturally occurring pervious material,above water table ✓ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands ✓ 7. Septic tank minimum 10 ft from foundation,deck Var.: t/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓ 9.Leaching minimum 100 ft from wetlands Var.: V 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: ✓ 13.Uses adjustment for maximum high groundwater Var.: V 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5'removal ✓ 16.Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", 1/"preferred ✓ 18. System meets breakout requirements PVC liner: Wall: / ✓ 19. Specified tee sizes are proper,gas baffle on outlet tee ✓ 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal ✓ 22. System adequately sized for its intended use ✓ 23.Minimum 6"stone or compacted below tank and dbox V 24.Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field ✓ 26.Electrical permit for pump chamber/Separate meter for duplexes ✓� 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓✓ 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking ✓ 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: ✓ wall: ✓ commercial: ✓ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee,installer signature ✓ 35.Foundation footing min.2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ / 37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓ Plan reviewed by: -5'14"1-1, 3 (c r 2o Z 6 03 os