HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 34 Lot 2-44 'INZone of Contribution: In Out X Acreage
Commercial: Residential: 1(
Street:
Village: 71.4 Floor Plan: #Bedrooms:
Owner: r L L o Installer: go,vra
Address: Phone:
Phone:
Builder: Engineer: £
Address: Phone:
Phone:
N/A YES NO
1.Required#of copies received ✓
2.Date of soils exam and percolation test not older than 2 years ✓
3.4-5 ft of naturally occurring pervious material,above water table ✓
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V
5.Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands ✓
7. Septic tank minimum 10 ft from foundation,deck Var.: t/
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓
9.Leaching minimum 100 ft from wetlands Var.: V
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ✓
13.Uses adjustment for maximum high groundwater Var.: V
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5'removal ✓
16.Proposed contours are suitable ✓
17. System meets slope requirements-min. 1/8", 1/"preferred ✓
18. System meets breakout requirements PVC liner: Wall: / ✓
19. Specified tee sizes are proper,gas baffle on outlet tee ✓
20. Sewage is under 10,000 gpd for parcel ✓
21.No garbage disposal ✓
22. System adequately sized for its intended use ✓
23.Minimum 6"stone or compacted below tank and dbox V
24.Manhole covers within 6"of grade,pump chamber cover to grade ✓
25. Inspection port on plastic chambers/leach field ✓
26.Electrical permit for pump chamber/Separate meter for duplexes ✓�
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓✓
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking ✓
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: ✓ wall: ✓ commercial: ✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee,installer signature ✓
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ /
37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓
Plan reviewed by: -5'14"1-1, 3 (c r 2o Z 6 03 os