HomeMy WebLinkAboutEngineer Plan - 2021TOP OF FOUNDATION ELEV. = 100-00 (ASSUMED) i� &OD I 4" CAST IRON PIPE PITCH EQUAL) TCH 1 /4""PER FT. ELEV. - Al-K- ELEV. = _ IL - Q) FT. MINIMUM COVECR RS BA AAFFLE (EXISTING) 1000 GALLON SEPTIC TANK 4" SCHEDULE 40 PVC PIPE MMI. PITCH 1/8' PER FT. ..-ELEV._ -9111-0 LEVE L ELEV. - _ LV _. 6' ELEV JUl_ DIS 1 T" E*,ay. - BOX-� TO BE WATER TESTED IF MORE THAN ONE OUTLET (TO BE PLACED ON FIRM SASE) 3/4 TO 1 1/2' GLEAM J DOUBLE WASHED STOP[ FREE OF FINES & 9LLT SEWAGE DISPOSAL SYSTEM PROFILE NO'' TO SCALE -D. �- -- BO', 9'.2 ;7-SQfL E N 0 0 1000,GALLC SOIL TEST DATE OF SOIL TEST JULY 7. 2021 SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY BG. MURPiY__ 08SERVATION HOLE 1 ELEV.= 99.2 PERCOLATION RATE __!L 2 MIN./INCH AT 68_ INCHES 76.01, LOT 11 10, 608 S.F '\LIMIT OF 5- 1 OVER040 9 9. 2 i 00.00' SOPS G DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-48" 4IfARMOUTK UASS, LO= FR fAM ISA C!S G �c� gG FILL NO 46-60' B LOAMY SAND 10YR6/4 32 MARGARET JOSEPH ROAD LDC. YARMOUTH, MASS. 60-132" C MEDIUM SAND 2.5Y7/4 NO WATER ENCOUNTERED AT - 88.2 ELEV. = 82.70 c 2„ir EXISTING SPOT ELEVATION 00.0 EXISTING CONTOUR ----007 --- FINAL SPOT ELEVATION FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE --P- TOWN WATER =WSW CATCH BASIN Coi GAS LINE CLEAN OUT CESSPOOL C.P. CLEAN SAND Lk.fAX PECTION PORT LOAM AND SEED 2' LAYER OF 1/8' TO 1/2" WASHED STONE OR FILTER FABRICPN. T 97.46 MN T REQUIRED RUTH- 'ml 4 HIGH CAPACITY INFILTRATORS WITH STONE IN AN z 11' X 30' X 10' TRENCH FORMATION '17 SOIL ABSORPTION ' WELL N A SYSTEM Jv� ZONE SYSTEM (SAS) INDEX ADJUST USGS PROBABLE WATER TABLE ELEV. _ ---- OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV. _-A,Z..- DESIGN CALCULATIONS 3 NUMBER OF BEDROOMS �_ GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW ( 110 GAL/ML/DAY X _.3 BR.) _ GAL /DAY REQUIRED SEPTIC TANK CAPACITY GAL. ACTUAL SIZE OF SEPTIC TANK (EXIS7M) GAL. SOIL CLASSIFICATION ..1__. DESIGN PERCOLATION RATE 5_4—_ MIN./IN. EFFLUENT LOADING RATE GAL/DAY/S.F. LEACHING AREA 474-33 SO. FT. (11X3e)+(47X2X OA2) LEACHING CAPACITY (AREA X RATE) 151M GAL./DAY 474,33 X 0.74 RESERVE LEACHING CAPACITY _HM_ GAL./DAY NOTES: 1, ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT, OF DRIVES OR PARKING AREAS, H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. S. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN: SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTPJTXS MOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. B. PARCEL IS IN FLOOD ZONE X FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL- AS SPECIFIED IN 310 CMR 15.255:(3). 11. EXISTING FLOW DIFFUSERS ARE TO BE PUMPED AND REMOVED ALONG WITH ANY POLLUTED SOILS ENCOUNTERED. 12. THE INSTALLER IS TO GIVE THE ENGINEER A MINIMUM OF 48 HOURS (2 WORKING DAYS) NOTICE FOR THE FINAL INSPECTION (NUMBER BELOW). AUG "i ? 221 HEALTH D PT APPROVED: BOARD OF HEALTH 3i 12ozl DATE 'S77-pf-,C,jJ AGENT C- IselPRa/18584-001d'91&"4-S�ASD#V 0 2021 SWEETSER PROPOSED SEPTIC DESIGN FOR PATRICK CORNWELL 4IfARMOUTK UASS, LO= FR fAM ISA C!S G �c� gG 32 MARGARET JOSEPH ROAD LDC. YARMOUTH, MASS. SWA37MIR203 SETILICKET ROA 508— P. 0, BOX 713 385-6900 SOUTH DENNIS, MASS. 02660 DATE JULY 12, 2021 JOB NO. J15JB4�00 REV. �I C LOCATION MAP REV - SHEET 1 OF 1 C- IselPRa/18584-001d'91&"4-S�ASD#V 0 2021 SWEETSER