Loading...
HomeMy WebLinkAboutEng Statement 2.4.2022939 main street rt 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors February 4, 2022 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Request for Certificate of Compliance SE 83-1289 Dear Commission Members: On July 14, 1994, the Commission issued an Order construction of a wood bulkhead and to permit a and floats. tel. (508) 362-4541 fax(508)362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, RE., P.L.S. Daniel E. Gonsalves, RE., S.E Craig J. Ferrari, E.I.T., S.E. of Conditions platform with for ramp A site visit was made for the purpose of closing out the Order of Conditions. Although the plan stated a proposed 15'wide planting border abutting the bulkhead, the final Order stated that there be no lawn within 10' of the bulkhead - and that is the case here. There is a 10' wide strip of gravel directly abutting the bulkhead. In 1995 Down Cape Engineering certified the piling Locations (certified attached). The bulkhead and platform have been measured and located and found to be installed as proposed. This is to certify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, RE., P.L.S. Daniel E. Gonsalves, RE., S.E Craig J. Ferrari, E.I.T., S.E. of Conditions platform with for ramp A site visit was made for the purpose of closing out the Order of Conditions. Although the plan stated a proposed 15'wide planting border abutting the bulkhead, the final Order stated that there be no lawn within 10' of the bulkhead - and that is the case here. There is a 10' wide strip of gravel directly abutting the bulkhead. In 1995 Down Cape Engineering certified the piling Locations (certified attached). The bulkhead and platform have been measured and located and found to be installed as proposed. This is to certify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. 939 main street rl 6a yarmouth port mass 02675 structural design land court surveys site planning sewage system designs inspections permits down cape engineering civil engineers & land surveyors June 28, 1995 Brad Ha11 Yarmouth 1146 ConserJ.-at i o i i Commission Route 28 South Yarmouth, 11h 0266"1 tel. (508) 362-4541 fax (508) 362-9880 Arne H. Ojala P.E., P.L.S. Timothy H. Covell, P.L.S. David C. Thulin, P.E. ke; Certification of piling installation at 1] S��ordfis;; Drive South Yarmouth Dear Brad Halle This is to certify that. the pilings at. the above mentioned property have been installed in the proper location and are evenly spaced. OTriY H*241 u, G ; I COVE LL o h�° C o ell , P.L.S. 0 No, 38035� � +gin Cape Engineering, Inc, f� cc: Charlotte Lizak