HomeMy WebLinkAboutEngineer Plan - 2020--� v LVLV
HEALTH DEPT
--97--EXISTING CONTOUR
N y
£tib
A F«s
x 100.98 EXISTING SPOT GRADE
97 PROPOSED CONTOUR
_W -EXISTING WATER SERVICE
TEST PIT
& WINTER Sr
$ BENCHMARK
°6
LEGEND
LOCUS
cpc
3
y
RaU1E 6A
RaIRE eA F
$ a
1-6 06
42 �
LOCUS MAP
E
NOT TO SCALE
LOT AREA
23,990± S.F.
O
\
PROPOSED S.A.S.
TWO 3' WIDE x 2' EFF. DEPTH x
32' LONG
LEACHING TRENCHES SPACED 6'
APART. .t
109.97 m
109.02
c 111.41
x 111.91
O
W111.18�
c e i
VENT \
EXISTING CESSPOOL
CONTRACTOR SHALL PUMP,
110421Z-11 �, ;r
t
x 112.83
l
FILL W/SAND & ABANDON,
LOCUST o
OR REMOVE
/ r
`y "1 4
10 r
t�;+7' 113.86w
PROPOSED SEPTIC TANK
J (�-� x o' 1263
a
--
PROPOSED SEWER
TP
x
o
114.03 W
CONNECTION
/
`r W
EL.=115.2±(VERIFY)
116 7
x x 114.76_
LDcu
ex
1 _... x.._
11223
B�li�'I�IARK
F T E
)y
_.-__-
_ Permit vnhd for RPptlli OF $F1'TIC 3RS1'F,IVj.
2F OCUST ONLY,
x due
T 0
RIM OF PVC CLEANOUT O x 115,14
p { x I to State anti 1 0, ai septic var4aattry,
�-� y 115.4 Board of livallh review and
EL, 115.34
., lyrurval is required,
any future addifions/n
m,r atiuua lte
114.11 sewage litcdrties'III sit uuat es/Zelhng, tions to
116 0 PEOP.
h
41 Yarmoutcallh
-BECK
\d, r DePartnleot
H�)
115.43
z
'/ i EX/S%%NG
1
^. 117.64` tiM ,^�� A..��PRO j,� .
X
115.E HOUSE(334)
�g.o9 �� o
'f20 5 irOF-72493
5.,r -f2 WALKOUT EL. =116.9
CO
X
118.35 Name
13.12
6,
x118.00
/
�e
123,06
s91.32 1 321: 123.26`\MAs9c
n
4. Y
•
OF 4 o PETER T. lF
121.72
123. :_:.:
�t0
4t' "XC' MCENTEE
,z yG� "'
-p-,
TERRY v CIVIL
PAVEDo
ANN y No. 35109
APRON `°
Stone o 231.
WARNER Q
G/
MAO SET
122.42
Porking^
122.)"..'.
No. 38721
X 122.21
BASIN S
�/
42 1 .08
123.59
N
rise
° 0 123.74
/T/
..,'
POVeme�t
L T T
OV
OWNER RECORD
T
123.87
ST
CAPE VEST DEVELOPMENT CORP
�t4
2 791 PITCHERS WAY
MAP ID: � 23-22
FLOOD HAZARD DESIGNATION
HYANNIS, MA 02601
MAP NO. 25001CO578J
EFFECTIVE DATE: JULY 16, 2014
PROPOSED DECK & SEPTIC SYSTEM UPGRADE
ZONE X (NON HAZARD)
334 ROUTE 6A, YARMOUTH PORT, MA
WIND ZONE CATEGORY - Exposure
B
Prepared for: CAPE VEST DEVELOPMENT CORP. 791 Pitcher's Way, Hyannis, MA 02601
ZONINGCLASSIFICATION: R-40
BUILDING SETBACKS: FRONT = 30 FT.
Engineering by: Surveying by: SCALE DRAWN JOB. NO.
SIDE & REAR = 20'.
Engineering Works, Inc. WARNER SURVEYING 1"=30' P.T.M. 165-20
LOT COVERAGE =25% (MAX.)
G'"=L5L1
2 West Crossfield Road 22 Long Road DATE
.restdole, MA 02644 Harwich, MA 02645 CHECKED SHEET No.
PROPOSED LOT COVERAGE = 1658 SF(6.4%) ='�=�ryJ
508) 477-5313 (508) 432-8309 5/21/20 P.T.M. 2 of 2
--� v LVLV
HEALTH DEPT
NOTE: TO PREVENT BREAKOUT, THE PROPOSED
FINISH GRADE SHALL NOT BE < EL:109.6
FOR A DISTANCE OF 15' AROUND THE
5LETI--C TANK
---
PERIMETER OF THE S.A.S.
INSTALL RISERS & COVERS OVER INLET
PROPOSED S.A.S.
AND SET TO 6" OF FINISH GRADE. PROPOSED D -BOX
INSTALL INSPECTION PORT SET TO 3" OF FINISH
CELLAR FLOOR=116.9± INSTALL
WATERTIGHT RISER & GRADE & PLACE REBAR AGAINST CAP FOR LOCATING
COVER SET
TO 6" OF GRADE
F.G. EL.=115.51 F.G. EL.=115.0±
EXISTING
F.G. EL.=114.0± MANIFOLD
F.G. EL.=114.1± to 111.8± TCEVENTS
CLEANOUT
MAINTAIN 2% GRADE MIN. OVER S.A.S.
-
SET REBAR FOR LOCATING- '
L= 6'f .• L=23'
0 S-1% (MIN.) *S_1% (MIN.)
L= 10' TWO 2'x3'z32' LEACHING TRENCHES WITH INSPECTION
4"SCH40 PVC _ 4"SCH40 PVC
O S=1% (MIN.) SCH 40 PERF PVC DISTRIBUTION LINES PORT
4'SCH40 PVC
6"
14"
6' 2' EFF.
INV.=113.00 48' LIQUID
DEPTH
LEVEL
EL.=107.00
ADDBOTT.
Das BAFFLE INV.=109.67
PROPOSED INV.=109.50 SLOPE OF PERF. PIPE = 0.5%
. ......: .. .. . ... INV.=112.75
D -BOX 32' EFFECTIVE LENGTH
INV.=109.16
H-20 INV, EL=109.00(END)
PROPOSED SEPTIC TANK INSTALL INLET TEE SOIL ABSORPTION SYSTEM (PROFILE)
ST.S
CONTRACTOR SHALL LOCATE AND VERIFY
MAINTAIN 2% GRADE (MIN.) OVER S.A.S.
ALL SEWER OUTLETS PRIOR TO INSTALLATION.
ESTIMATED SEWER INV.=115.2±
2" LAYER OF 1/8"-1/2" DOUBLE WASHED
STONE (OR APPROVED FILTER FABRIC)
BREAKOUT EL.=109.66 -
NOTES:
INV.(IN) EL.=109.16
TWICE THE
1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE
2EFFECTIVE
INVERTS, PRIOR TO INSTALLATION.
BOTTOM EL.=107.00 WIDTH
2) SEPTIC TANK & D -BOX SHALL BE SET LEVEL AND
4' MIN. OF NATURALLY 3' 6'7WASHEDSTONE
TRUE TO GRADE ON A MECHANICALLY COMPACTED
PERVIOUS MATERIAL TWO 2'x3'x32'
STABLE BASE OR SIX INCH AGGREGATE BASE, AS
SPECIFIED IN 310 CMR 15.221(2).
4' MIN. ABOVE GROUNDWATER LEACHING TRENCH
3) INSTALL INLET & OUTLET TEES AS REQUIRED.
BOTTOM OF TP, EL.=103.0 =
SYSTEM
4) A GAS BAFFLE SHALL BE INSTALLED ON OUTLET TEE
SOIL ABSORPTION
AS MANUFACTURED BY TUF-TITE, ZABEL OR EQUAL.
NLS'
SEPTIC SYSTEM PROFILE
i-32 "�
GENERAL NOTES:
1
-TRENCH-1---_a7W�
1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL
_=-__-
1 T_
BOARD OF HEALTH AND THE DESIGN ENGINEER.
2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS
--- - 11
OF THE STATE ENVIRONMENTAL CODE, TALE V, AND ANY APPLICABLE
--- =TRENCH 2_ --
LOCAL RULES AND REGULATIONS, EXCEPT AS REQUESTED BELOW:
----- --- - T
-310 CMR (1
1) A 2' variance too the 3' maximum cover requirement, for up to
TRENCH SPACING
5' of max. cover. S.A.S. shall be H-20 and vented.
_-3=4".. POUrs-EAL-OUTLETS"-_._-._.--.__.___27,
-3: THE--SEW9.GE-DISPOSAL-SYSTEM-- SHALL =NOT- BE BAC*FfttED-PRIOR-_
TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE
4" 4"
DESIGN ENGINEER.
4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING
1-4" POLYSEAL 4
FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN
INLET -
^,L,
ENGINEER BEFORE CONSTRUCTION CONTINUES.
5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM.
i7f=
6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF
N+
THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF
HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION.
'' 4"
7. WATER SUPPLIED BY TOWN WATER SERVICE.
CROSS SECTION. I PLAN 4VIEW
8. THERE ARE NO WELLS WITHIN 100' OF THE PROPOSED S.A.S.
H-20 LOADING
9 ALL SHALL BE RESTOREDE
D FOR SCO
EUPON EOWNER
TRACTOR OR AS OTHERWISTRUCTION
BYAS
AGREED AND
V -BOX
DIRECTED BY THE APPROVING AUTHORITIES.
SOIL LOG
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING
CONSTRUCTION.
DATE: APRIL 15, 2020
11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS
SOIL EVALUATOR: PETER McENTEE PE(SE#1542)
IN THE AREA BENEATH AND FOR 5' ON ALL SIDES OF THE S.A.S. AND
WITNESS: MALLORY LANGLER R.S. HEALTH AGENT
REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3).
TP -1
- 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE
ELEV. DEPTH
-
INSPECTED BY A LICENSED SOIL EVALUATOR PRIOR TO BACKFILL
114.0 A
LOAMY SAND
10YR 4/2
113.0 12"
LOAMY SAND
DESIGN CRITERIA
111.0 1OYR 5/6 36"
C
NUMBER OF BEDROOMS: 3 BEDROOMS
SOIL TEXTURAL CLASS: CLASS J
DESIGN PERCOLATION RATE: 5 MIN./INCH
FINE SAND
DAILY FLOW: 330 GPD
2.5Y 6/6
DESIGN FLOW: 330 GPD
GARBAGE GRINDER: NO
PROPOSED SEPTIC TANK: 1500 GALLON CAPACITY
103.0 138"
PROPOSED DISTRIBUTION BOX; 1 INLET, 3 OUTLETS, RATED H-20
NO GROUNDWATER ENCOUNTERED
LEACHING AREA REQUIRED: (330 GPD) = 445.9 SF
_
PERC RATE: <2 MIN./INCH ("C' HORIZON)
.74 GPD/SF
PROPOSED
DECK & SEPTIC SYSTEM UPGRADE
INSTALL TWO 2'DEEP x 3'WIDE x 32'LONG LEACHING TRENCHES WITH
334 ROUTE 6A, YARMOUTH PORT, MA
STONE AND SCHEDULE 40 PERFORATED PVC DISTRIBUTION LINE
Prepared
for: CAPE VEST DEVELOPMENT CORP. 791 Pitcher's Way, Hygnnis, MA 02601
SIDEWALL: 2 TRENCHES x 2 SIDES/TRENCH x 2' x (32'+3')= 280 SF
BOTTOM AREA: 2(3' x 32)' .................................................= 192 SF
Engineering
by:
Surveying by:
SCALE
DRAWN
JOB. N0.
TOTAL AREA: .............................. ........................ .............. = 472 SF
Engineering
Works, Inc.
WARNER SURVEYING
N.T.S.
P.T.M.
165-20 _
12
West Crossfield Road
22 Long Road
DATE
DESIGN FLOW PROVIDED: 0.74 GPD/SF(472 SF) = 349.3 GPD
Forestdale,
MA 02644
Harwich, MA 02645
5/21/20
CHECKED
P.T.M.
SHEET NO.
(508)
477-5313
(508) 432-8309
2 Of 2