Loading...
HomeMy WebLinkAboutSite Plan Rev 1.11.2022LEGEND 99 - • EXISTING CONTOUR X 99. 1 EXIST. SPOT ELEV. -4991-- PROPOSED CONTOUR 198.41 PROPOSED SPOT EL. TH1 0 TEST HOLE 2,7,- SLOPE OF GROUND UTILITY POLE FIRE HYDRANT NOTE NOT ALL SYMBOLS MAY APPEAR IN DROMIG MEADOW MIX 1,000 SF AREA MIN. New England Wildflower Mix NEW ENGLAND WETLAND PLANTS, INC. OR EQUAL SPECIES: Little Bluestem, (Schizachyrium scoporium), Creeping Red Fescue, (Festuco rubra), Indian Grass, (Sorghostrum nutons), Partridge Pea, (Chomaecrista fasciculato), Canada Wild Rye, (Elymus canadensis), Virginia Wild Rye, (Elymus virginicus), Wild Blue Lupine, (Lupinus perennis), Golden Alexanders, (Zizia aurea), Ox Eye Sun"ower, (Heliopsis helionthoides), Black Eyed Susan, (Rudbeckia hirta), New England Aster, (Aster novae-angliae), Wild Bergamot, (Monorda stuloso), Smooth Blue Aster, (Aster loevis), Evening Primrose, (Oenothera biennis), New York Ironweed, (Vemonia noveboracensis), Grass Leaved Goldenrod, (Euthamia grominifolia), Early Goldenrod, (Solidago juncea). MOW ONCE ANNUALLY, LATE FALL MAINTENANCE SEEDING AS REQ. IRRIGATION SYSTEM TO BE MAINTAINED FOR ESTABLISHING MEADOW AND MAINTENANCE DURING DROUGHT PERIODS. DEG DCE #21-122 s�, 9 SYSTEM DESIGN: NOTES �00- .5 SYSTEM PROFILE ALL SYSTEM COMPONENTS SHALL BE e9 not MARKED WITH MAGNETIC TAPE OR 1. DATUM IS NAVD 88 (N(Yr To SM-0 COMPARABLE MEANS FOR FUTURE LOCATION. GARBAGE DISPOSER IS NOT ALLOWED ACCESS COVERS TO WITHIN 6" OF FIN. GRADE 2" PEASTONE OR GEOTEXTILE CONCRETE COVERS TO WITHIN 3" GRADE EXISTING 3 BEDROOM DWELLING 2. MUNICIPAL WATER IS EXIS11NG TOP FOUND. EL. 22.2' FILTER FABRIC OVER STONE DESIGN FLOW: 4 BEDROOMS 0 110 GPD = 440 GPD 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 0 d 21.0' MINIMUM .75' OF COVER OVER PRECAST 2x SLOPE REQUIRED OVER SYSTEM 20.0 USE A 440 GPD DESIGN FLOW g P 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS 11011 Locus PRECASr H-10 WATERTE�,T D'BOX FOR LEVELNESS BLOCKS OR TO BE AASHO H-1Q Pine t Rd RISERS (1YP.) MIN. 2 CKNESS SCH40 PVC MORTAR PRECAST RISERS 00 t 6 Gong PIPES LEVEL 1ST 2' 4• COMPONENTS INVERT IN 1s.5 SEPTIC TANK: 440 GPD (2) = 880 R 1 5. PIPE JOINTS TO BE MADE WATERTIGHT. U an �0 4 'IT •~ ENDS (') 4. USE A 1500 GAL. SEPTIC TANK SIDES 17.33 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH *17.56' 10" 1500 GAL H-10 14" ➢00000000 y00000aoo 17.28' TEE SEPTIC TANK TEE , ®®® ® ® ®® - ® °°°°°°° LEACHING: 310 CMR 15.000 (TITLE 5.) 17.03 6" MIN SUMP °°°°°°°° .®®® ® >°o°o°o°o �onoo >°°°°°°°° ®® BB °O°O°Ooo - 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO Rt. 28 '"""'"o,"o"0 12" MIN. INT. DIM. °°°°°°°° ®®®® ® ®�w >°°°°°°°° SIDES: 2 33.5 + 12.8 2 .74 - 137 GPD o a GAS BAFFLE °0�09+���- >°o 0 0 0 ®®®® ® °o°°°°°o ®®® ® ®® ® ° ° ° ° ( ) ( ) BE USED FOR LOT LINE STAKING OR ANY OTHER >°O°O°O°O O°O�°�°° , (ACME OR EQUAL) . 16.77 16.6 °°°°°°°° °°°°°°°° 14.5 BOTTOM 33.5 x 12.8 (.74) = 317 GPD PURPOSE.JE 0 60000-0- o"o"000"gog"o"g000g"gogaga....S; I L 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. oo�o^oo�o�o�o,,ono"0000000�o�o�o�o„o�o�00000. H-20 500 GAL. LEACHING CHAMBERS BY ACME PRECAST OR EQUAL TOTAL: 614 S.F. 454 GPD Q �• � 3/4"-1-1/2" DOUBLE WASHED STONE 4' MIN. (3) UNITS REQUIRED ALL AROUND PRECAST STRUCTURES 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED e Q 6" CRUSHED STONE OR MECHANICAL OVERALL DIMENSIONS TO OUTSIDE OF STONE: 33.5' X 12.83' USE (3) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITHOUT INSPECTION BY BOARD OF HEALTH AND Q� ` COMPACTION. (15.221 [21) NTH 4' STONE ALL AROUND PERMISSION OBTAINED FROM BOARD OF HEALTH. (2.5 x SLOPE) (--!-X SLOPE) (_X SLOPE) 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING LOCUS MAP DIGSAFE (1-888-344-7233) AND VERIFYING THE FOUNDATION- SEPTIC TANK 26' D BOX 12 9.5' BorroM TH-1 LEACHING LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES SCALE 1 "=2000'f 11 FACILITY NO GROUNDWATER FOUND PRIOR TO COMMENCEMENT OF WORK. *NOTE: INTERIOR PLUMBING TO BE RE-ROUTED 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE ASSESSORS MAP 70 PARCEL 82 TO EXIT THE DWELLING IN LOCATION SHOWN ON REMOVED BENEATH AND 5' AROUND THE PROPOSED PLAN VIEW. PLUMBER TO CONFIRM FEASIBILITY LEACHING FACILITY. LOCUS IS WITHIN FEMA FLOOD ZONE X & AE (EL 12) PRIOR TO INSTALLING ANY PORTION OF THE AS SHOWN ON COMMUNITY PANEL #25001 CO591 J SEPTIC SYSTEM 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND DATED 7/16/2014 REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. 13. COASTAL BEACH FLAGGED BY BLH ENVIRONMENTAL CONSULTING. ZONING SUMMARY ZONING DISTRICT: R-40 DISTRICT REQUIRED: EXISTING: PROPOSED MIN. LOT SIZE 40,000 S.F. 21,465 S.F. 21,465 S.F. MIN. LOT FRONTAGE 150' 169.54' 169.54' MIN. FRONT SETBACK 30' 35.9' 35.9' MIN. SIDE SETBACK 20' 25.6' 25.6' MIN. REAR SETBACK 20' >75' >75' MAX. BUILDING COVERAGE 25% 11 % 12.4% MAX. BUILDING HEIGHT 35' - 26.43' TEST HOLE LOGS ENGINEER: DANIEL E. GONSALVES, SE #13587 WITNESS: PHIL RENAUD DATE: 10/7/21 PERC. RATE _ < 2 MIN/INCH CLASS 1 SOILS ELEV. ' ELEV. 0» 19.5' 0" `�% 21.0' HARDSCAPE CALCULATIONS: A A LS LS HARDSCAPE WITHIN BANK 0-50' 50-100' 8" 10YR 3/2 10YR 3/2 6" EXISTING: 110 SF 495 SF 2297 SF B B PROPOSED: 110 SF 284 SF 3040 SF LS LS INCREASE: 0 SF -211 SF 743 SF 26" 10YR 5/6 17 3, 24» 1 OYR 5/6 19.0' 532 SF INCREASE WITHIN 100' COASTAL BANK BUFFER. C C 532 SF INCREASE WITHIN INNER AND OUTER RIPARIAN PERC ZONES. PROPOSED MITIGATION (2:1) : 532x2 = 1064 S.F. MS MS (1070 SF PROVIDED) 2.5Y 7/4 2.5Y 7/4 120" 9.5' 120" 11.0' NO GROUNDWATER ENCOUNTERED TITLE 5 SITE PLAN, OF 4 RIVER DRIVE SOUTH YARMOUTH, MA PREPARED FOR KELLY McGUILL ty OFN OF pigs DANIEL yU^` P SO a �, L_CfD� DATE DANIEL A. OJALA, P.E., P.L.S. DATE: NOVEMBER 10, 2021 REV: FEBRUARY 11, 2022 (BULKHEAD) Scale:1 "= 20' 0 10 20 30 40 50 FEET off 508-362-4541 I fax 508-362-9880 downcape.com down cope eogioeeriog, ioc. civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOUTHPORT MA 02675 21-122 MCGUILL.DWG