Loading...
HomeMy WebLinkAboutPlan 2.15.202249 y WETLAND AREA .r•" 7.8 Sp• •I1 Tf�r3 .. •4 / 7 � •S / /r 2.3 7.6 •B rOI 83 �2.5 \ +7 l J EXIST ,, I2.5 . ll + IU.S GARAGE + 13 `I cessFoof$ / 9 t N GRASS AREA f I 0 D + I GII3 W TI 14.7 C y ►r� �t m VZOA •/6 tl +IBA •/S 7.4 / \ i. 4 •l3A 14.1 l PROP. LP GAS TANK \ SILT WATTLE L%Er \I/. •7 �; \ � LGE. DIAM. TREES -SA 4\7 \ PROP. SB.GE'N. \ WETLAND AREA \ \ �k 04A E . I OJA w \ !4.3 •2A LIMIT OF AE FLOOD ZONE /A EL= 12 NAVD88 (13 N GV D29) PLAN SCALE - 1 IN. = 30 FT. GENERAL NOTES 1. ELEVATIONS REFER TO NGVD 29. NAVD88 CONVERSION: EL NGVD29 -1.1= EL NAVD88 2. PORTIONS OF THE SITE ARE WITHIN THE FEMA -MAPPED COASTAL "AE" FLOOD ZONE EL. = 12 NAVD88 (13 NGVD 29 AS INDICATED) SHOWN ON YARMOUTH COMMUNITY PANEL NO. 25001CO5591, JULY 16, 2014 3. PLAN REFERENCE: DEED BOOK 5937, PG. 253; LOT LINE SURVEY BY FRANK WHITING, PLS. 4. WETLAND BOUNDARY AND SITE CONDITIONS VISUALLY CONFIRMED BY CAPE COD ENGINEERING, INC. TO ACCEPTABLE TOLERANCE FOR PURPOSES OF RDA REVIEW S. ALL EXISTING UTILITY LINES AND SEPTIC SYSTEM COMPONENTS ON THE BUILDING FRONT AND SOUTH SIDE SHALL BE MARKED OUT AND PROTECTED PRIOR TO ANY WORK ACTIVITY 6. THE PROPOSED WORK ACTIVITY TO INSTALL THE LP TANK AND GENERATOR WITH TRENCHING TO THE HOUSE IS WITHIN 100 FT. OF WETLAND AREAS. A WORK LIMIT AS DESIGNATED BY YARMOUTH CONSERVATION COMMISSION SHALL BE ESTABLISHED WHERE NECESSARY. A 9 IN. MIN. DIAMTER STRAW WATTLE ON THE DOWN SLOPE SIDE OF THE WORK AREA IS RECOMMENDED. 7. EXCAVATION FOR LP TANK SHALL MAINTAIN A MIN. DISTANCE OF 10 FT. FROM THE NEAREST TREE TRUNK. B. SITE RESTORATION, SMOOTH GRADING, RAKING AND SEEDING SHALL R�TURN THE SITE TO PRE -CONSTRUCTION CONDITION. M. Few aft MD.m60 PLAN SHOWING PROPOSED GENERATOR W/ LP GAS TANK INSTALLATION 57 WHARF LANE, YARMOUTHPORT ASSESSORS MAP 121, PARCEL 37 FEBRUARY 15, 2022 SCALE - AS NOTED PREPARED BY CAPE COD ENGINEERING, INC. ROBERT M. PERRY, PE P.O. BOX 1517 EAST DENNIS, MA 02641 TEL - 508-385-1445