Loading...
HomeMy WebLinkAboutEngineer Plan - 2021TOP OF FOUNDATION 20 FT. MINIMUM FROM CELLAR OR CRAWL. SPACE ELEV. = 100_00 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB (ASSUMED) (--CLEAN SAND CONCRETE INSPECTION PORT COVERS 4" SCHEDULE 40 PVC PIPE LOAMAND SEED " OF MIN. PITCH 1/8" PER FT. 1 LAYER STONE'. [ r: ll3 EXISTING SPOT EXISTING CONT( FINAL SPOT ELI FINAL CONTOUR SOIL TEST LOCI UTILITY POLE —0— TOWN WATER W—W CATCH BASIN®� GAS LINE CLEAN OUT 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT. TEE m VENT NOT REQUIRED ELEV. = 97.QQ_ / U 'u �i MIN COLOR MOTT. LEV. = 9003 oo 10YR5/2 ■ rn ( 110 GAL/911L/DAY X 2 BR.) 5 17" B LOAMY SAND t0YR6/6 o 0 J 2.5Y7/4 °ATE DEC. 13, 2021 LEVEL MIN./IN. Qc^": _Q,T.}_ GAL./DAY/S.F. LEACHING AREA 9447 ELEV. _ ._44�._ ADD GAS ELEV, — t?¢}� 6" S MP ELEV. _ _ 12= GAL./DAY . 010' RESERVE LEACHING CAPACITY ELEV. : ---- BAFFLE _ DISTRIBUTION OUTLET y ELEV. BOX 4 HIGH CAPACITY INFILTRATORS WITH. STONE IN TEE (EXISTING) MA �+ /�� 1000 GALLON —��— TO BE WATER TESTED IF MORE THAN ONE OUTLET AN 10' % 30' % 10' TRENCH FORMATION .17 14 INCHES 19 INCHES 24 INCHES 29 INCHES (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION z WELL 34 INCHES SEPTIC TANK ZONE 3/4" TO 1 1/2" CLEAN SYSTEM STEM (SAS) INDEX DOUBLE WASHED STONE ADJUST FREE OF FINES do SILT SEWAGE DISPOSAL SYSTEM PROFlLE NOT TO SCALE USGS PROBABLE WATER TABLE ELEV. _ OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV. _ CESSPOOL C.P. Q SOIL TEST _ DATE OF SOIL TESTQE,�MR SOIL TEST DONE BY YEG R _N_1 NG WITNESSED BY 2, RENAUD OBSERVATION HOLE 1 ELEV.=-_98.4_ PERCOLATION RATE <_;,__ MIN./INCH AT 47--- INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-5" A LOAMY SAND 10YR5/2 NO ( 110 GAL/911L/DAY X 2 BR.) 5 17" B LOAMY SAND t0YR6/6 CAL, ACTUAL SIZE OF SEPTIC TANK (EX67m) 17-121" C MEDIUM SAND 2.5Y7/4 °ATE DEC. 13, 2021 DESIGN PERCOLATION RATE NO WATER ENCOUNTERED AT ??L ELEV. _ _ 883_ DESIGN CALCULATIONS NUMBER OF BEDROOMS 2 GARBAGE DISPOSAL UNIT _ _ TOTAL ESTIMATED FLOW LOT 3, 88 STARBUCK LANE Loc. YOUTH, MASS.WC ( 110 GAL/911L/DAY X 2 BR.) 220 REQUIRED SEPTIC TANK CAPACITY CAL, ACTUAL SIZE OF SEPTIC TANK (EX67m) 19W GAL. SOIL CLASSIFICATION °ATE DEC. 13, 2021 DESIGN PERCOLATION RATE MIN./IN. EFFLUENT LOADING RATE _Q,T.}_ GAL./DAY/S.F. LEACHING AREA AM SQ. FT. .:� L.EACCHHINOG+CAPAACI`TYO (AREA X RATE) 12= GAL./DAY 430.00 X 0.74 RESERVE LEACHING CAPACITY GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2, ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG—SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7, CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE X —.,..._ 9. LOT IS SHOWN ON ASSESSORS MAP — 110 AS PARCEL 10. EXISTING PIT IS TO BE PUMPED AND REMOVED ALONG WITH ANY POLLUTED SOILS ENCOUNTERED. APPROVED: BOARD OF HEALTH 3 /, zeu H,.41� DATE AGENT C; 0 t EB 2 3 2022 HEALTH DEPT. yARM0U, MASS. M PROPOSED SEPTIC DESIGN FOR STEPHEN PETERSON LOT 3, 88 STARBUCK LANE Loc. YOUTH, MASS.WC swAz7ma 203 SETUCKET ROAD 508— P. 0, BOX 713 385-6900 SOUTH DENNIS, MASS. 02660 °ATE DEC. 13, 2021 scALE 1 " = 20` REV, FEB. 15. "1.. JOB NO. 8614-00 .:� LOCATION MAP-= REv' ---- SHEET 1 OF 1 C; 0 t EB 2 3 2022 HEALTH DEPT.