Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH i SEWAGE PLAN REVIEW CHECKLIST k Location: A.M. Lot Zone of Contribution: In Out XAcreage Li'l v VI(,(,( / Commercial: Residential: K Street: (� Pet Village: Floor Plan: tie, #Bedrooms: 3 Owner: Installer: Vi I S 13PD S Address: Phone: Phone: �1, , Builder: Engineer: �/V.E:t ` . Address: Phone: (J Phone: N/A YES / _ NO 1. Required#of copies received �// 2. Date of soils exam and percolation test not older than 2 years ✓/ 3. 4-5 ft of naturally occurring pervious material, above water table / ✓ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ / 5. Water line 10 ft from septic components Var.: ✓/ 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: / 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,// 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: / 11. Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: vf 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal t/"."-..--; 16. Proposed contours are suitable V 17. System meets slope requirements-min. 1/8", '/"preferred 18. System meets breakout requirements PVC liner: Wall: iV 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System adequately sized for its intended use V 23. Minimum 6"stone or compacted below tank and dbox LV,.,,. 24. Manhole covers within 6"of grade,pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes /// 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V 28. Septic tank/pump chamber to be factory waterproofed / k.''29. Vent provided if leaching below 3 feet,under driveway/parking t.t� 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater / / in 34. Title V Application and permit fee,installer signature / 35. Foundation footing m . 2 feet above adjusted ground water for new house ✓ 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's MapI/ :a:APlan reviewed by: 6 03,03