HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
i SEWAGE PLAN REVIEW CHECKLIST k
Location: A.M. Lot Zone of Contribution: In Out XAcreage
Li'l v VI(,(,( / Commercial: Residential: K
Street: (�
Pet
Village: Floor Plan: tie,
#Bedrooms: 3
Owner: Installer: Vi I S 13PD S
Address: Phone:
Phone: �1, ,
Builder: Engineer: �/V.E:t ` .
Address: Phone: (J
Phone:
N/A YES / _ NO
1. Required#of copies received �//
2. Date of soils exam and percolation test not older than 2 years ✓/
3. 4-5 ft of naturally occurring pervious material, above water table / ✓
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ /
5. Water line 10 ft from septic components Var.: ✓/
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: /
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,//
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: /
11. Tank/leaching minimum 10 ft from property line Var.: ✓
12. System meets all other setback requirements Var.: vf
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons) or 5' removal t/"."-..--;
16. Proposed contours are suitable V
17. System meets slope requirements-min. 1/8", '/"preferred
18. System meets breakout requirements PVC liner: Wall: iV
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal
22. System adequately sized for its intended use V
23. Minimum 6"stone or compacted below tank and dbox LV,.,,.
24. Manhole covers within 6"of grade,pump chamber cover to grade V
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes ///
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V
28. Septic tank/pump chamber to be factory waterproofed / k.''29. Vent provided if leaching below 3 feet,under driveway/parking t.t�
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater / /
in
34. Title V Application and permit fee,installer signature /
35. Foundation footing m . 2 feet above adjusted ground water for new house ✓
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's MapI/
:a:APlan reviewed by: 6 03,03