Loading...
HomeMy WebLinkAboutEngineer Certification Letter II ‘ss RI\ l R 1 \(,I\EIIRI` ( I'.(). B()\ 1163 l ‘s1 1)t\\Is. \I \ 02641 August 20, 2020 Mallory Langler, R.S. Yarmouth Assistant Health Director 1146 Route 28 South Yarmouth, MA 02664 RE: John Mitchell 16 Flume Court(map 47, parcel 112) West Yarmouth, MA RECEIVED MAR 0 3 2022 HEALTH DEPT. Dear Mallory: On August 18, 2020, I inspected the construction of the septic system at the above referenced site. The system has been installed in accordance with the plan prepared by this office,dated: 5-22-20. The existing septic tank was found to be in good working condition at time of construction. I certify that the system as constructed, generally conforms within acceptable tolerance to the regulations. as varied, set forth in 310 CMR 15.000 and the Town of Yarmouth Board of Health Regulations. If you have any questions or require any additional information, please call me at 508-385-3426. Sincerely, 176YVVVA Thomas McLellan, P.E.