Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. I S' Lot 1 I q Zone of Contribution: In Out X Acreage 31,`1 i 9: 5f Commercial: Residential: 1,- Street: /Street: /e) Co u'..s pa.--/ ""b/--f cj€ Village: Pa-T Floor Plan: ✓ #Bedrooms: 7. Owner: Pre' C A-A --H-`72 Installer: &4---c-i' 5 Address: Phone: Phone: Builder: Engineer: Zrc.-'c- 5 G-et____ Address: Phone: Phone: N/A YES . NO 1.Required#of copies received i/ 2.Date of soils exam and percolation test not older than 2 years / 3.4-5 ft of naturally occurring pervious material,above water table 4 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands / 7. Septic tank minimum 10 ft from foundation,deck Var.: V _ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,/ 9.Leaching minimum 100 ft from wetlands Var.: V 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: / 11.Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: V 13.Uses adjustment for maximum high groundwater Var.: ✓ 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: / 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable /y 17. System meets slope requirements-min. 1/8", %"preferred i 18. System meets breakout requirements PVC liner: Wall: r/ 19. Specified tee sizes are proper, gas baffle on outlet tee ,I 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 17 ✓ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox ,� 24.Manhole covers within 6"of grade,pump chamber cover to grade / 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,/ 28. Septic tank/pump chamber to be factory waterproofed I 29.Vent provided if leaching below 3 feet,under driveway/parking ✓ • 30.Buoyancy calculations for tank/pump chamber V 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V 33.H-20 loading is subject to vehicular traffic,groundwater / 34.Title V Application and permit fee,installer signature ✓ 35. Foundation footing min. 2 feet above adjusted ground water for new house V 36.Deed Restriction required max. #bedrooms: max. flow: gpd ,/ 37. Check area lots for groundwater/Label,groundwater in Assessor's Map PIan reviewed by: ` 14 ..711l2ep Z"L- 66301