HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. I S' Lot 1 I q Zone of Contribution: In Out X Acreage 31,`1 i 9: 5f
Commercial: Residential: 1,-
Street:
/Street: /e) Co u'..s pa.--/ ""b/--f cj€
Village: Pa-T Floor Plan: ✓ #Bedrooms: 7.
Owner: Pre' C A-A --H-`72 Installer: &4---c-i' 5
Address: Phone:
Phone:
Builder: Engineer: Zrc.-'c- 5 G-et____
Address: Phone:
Phone:
N/A YES . NO
1.Required#of copies received i/
2.Date of soils exam and percolation test not older than 2 years /
3.4-5 ft of naturally occurring pervious material,above water table 4
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands /
7. Septic tank minimum 10 ft from foundation,deck Var.: V _
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,/
9.Leaching minimum 100 ft from wetlands Var.: V
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: /
11.Tank/leaching minimum 10 ft from property line Var.: ✓
12. System meets all other setback requirements Var.: V
13.Uses adjustment for maximum high groundwater Var.: ✓
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: /
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable /y
17. System meets slope requirements-min. 1/8", %"preferred i
18. System meets breakout requirements PVC liner: Wall: r/
19. Specified tee sizes are proper, gas baffle on outlet tee ,I
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal 17
✓
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox ,�
24.Manhole covers within 6"of grade,pump chamber cover to grade /
25. Inspection port on plastic chambers/leach field V
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,/
28. Septic tank/pump chamber to be factory waterproofed I
29.Vent provided if leaching below 3 feet,under driveway/parking ✓
•
30.Buoyancy calculations for tank/pump chamber V
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V
33.H-20 loading is subject to vehicular traffic,groundwater /
34.Title V Application and permit fee,installer signature ✓
35. Foundation footing min. 2 feet above adjusted ground water for new house V
36.Deed Restriction required max. #bedrooms: max. flow: gpd ,/
37. Check area lots for groundwater/Label,groundwater in Assessor's Map
PIan reviewed by: ` 14 ..711l2ep Z"L-
66301