Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. S7 Lot Z -.) Zone of Contribution: In Out X Acreage /to.7O3± Sr Commercial: Residential: r/ Street: 9 A-e_‘- g w Village: cv EST Floor Plan: #Bedrooms: S Owner: 6_,-,6 c c-K -) Installer: .--)A --&6't - Address: Phone: Phone: Builder: Engineer: - e,..z>"_./eS Address: Phone: Phone: N/A YES, NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years V 3.4-5 ft of naturally occurring pervious material,above water table / 4.Foundation 2 ft above high point of road H.P.: Fnd: Van: ,/ 5.Water line 10 ft from septic components Var.: I / 6.Benchmark indicated and shown-NGVD if near wetlands V j 7. Septic tank minimum 10 ft from foundation,deck Var.: x ,S r V 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: / 9. Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11.Tank/leaching minimum 10 ft from property line Var.: / 12. System meets all other setback requirements Var.: / 13.Uses adjustment for maximum high groundwater Var.: Kem ams 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5'removal / 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred ./ 18. System meets breakout requirements PVC liner: Wall: / 19. Specified tee sizes are proper, gas baffle on outlet tee V 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes V 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size / 28. Septic tank/pump chamber to be factory waterproofed ,/ 29.Vent provided if leaching below 3 feet,under driveway/parking / 30.Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: / 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature / 33.H-20 loading is subject to vehicular traffic,groundwater / 34.Title V Application and permit fee,installer signature / 35. Foundation footing min.2 feet above adjusted ground water for new house / 36.Deed Restriction required max. #bedrooms: max.flow: gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map / Plan reviewed by:_ <Y7'h-4 3 (`t 'Lo LZ 60303