HomeMy WebLinkAbout03102022 33 Pleasant Street To: Yarmouth Historical Commission From: Karen M. Greene, Director Date: March 7, 2022 Re: 33 Pleasant Street As you are aware, the Historical Commission approved the partial demolition and renovations at 33 Pleasant Street in 2019. The approval letter and associated elevation plans are attached. In Fall 2021, the Town was notified that the project was moving forward. Based on information submitted and attached here, the Town confirmed that the associated demolition was under the 25% Cape Cod Commission threshold. As the plans remained consistent with the 2019 plans, the contractor was given permission to proceed. The Owner and Builder will be in attendance at the Commission’s Thursday, March 10 meeting to discuss the project and to answer any questions that the Commission may have regarding this project. We have received some guidance from Sarah Korjeff at the Cape Cod Commission. I believe that the Owner/Builder have provided the information outlined in Ms. Korjeff’s email. Understanding that demolition had gone beyond that which was originally proposed, the Building Department stopped work at the site. Actual demolition calculations and some photos of the work are attached here as well as an explanation for the extent of demolition from the Owner and Builder. Please note that the original plans for the building have not changed and remain consistent with the Commission’s original 2019 approval. The Owner is preparing plans reflecting the actual work done that will meet the requirements of the Building Department. For your review and consideration, I’ve attached the following relevant materials:  2019 Approval Letter and associated elevation plans  Fall 2021 Floor Area Calculations  Email exchange with Sarah Korjeff, Cape Cod Commission  Email exchange with Owner and Builder, Revised Calculations and Photos For the project to move forward, the Yarmouth Historical Commission needs to submit a letter to the Building Department reconfirming their approval of the plans. Cc: Tim Sears, Deputy Building Commissioner Jesse Connell, Owner Trevor Meyer, Builder T O W N O F Y A R M O U T H 1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664-4492 Telephone (508) 398-2231, Ext. 1277, Fax (508) 398-2365 Department of Community Development TOWN OF YARMOUTH 1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664 -4451 Telephone (508) 398-2231 Ext. 1292 Fax (508) 398-0836 HISTORICAL COMMITTEE MEMORANDUM TO: Mark Grylls, Building Commissioner FROM: Beth Vozella, Yarmouth Historical Commission Office Administrator DATE: October 4, 2019 SUBJECT: 33 Pleasant St., South Yarmouth On September 5, 2019, the Historical Commission met with Architect, Joseph Dick at 33 Pleasant Street in South Yarmouth to tour the property and to hear a brief proposal for partial demolition and rebuild/renovation of the house situated on this property. On Thursday, September 12, 2019, Mr. Dick attended the Commission’s regularly scheduled meeting, at which they discussed the proposed partial demolition, the rebuild and other exterior renovation plans. The Commission unanimously agreed (5-0) that the portion of the home being proposed for demolition is not significant per the provisions of the Town’s Demolition Delay Bylaw and its removal would not jeopardize the status of the remaining portion of the home which is listed as a contributing structure in the South Yarmouth / Bass River Historic District, a National Register District. The Historical Commission members are very appreciative of the time, care and effort that Mr. Dick has put into this project and are in full support the proposed rebuild plans. Therefore, the owners are free to pursue the partial demolition and rebuild as proposed. Cc: YHC File; Joseph Dick 1 Greene, Karen From:Greene, Karen Sent:Thursday, October 7, 2021 1:03 PM To:'Justin Vuono' Cc:Sears, Tim; Old Kings Highway; Trevor Meyer Subject:RE: 33 Pleasant Health sign off OK HI Justin  Thank you for providing the plans.  I met this morning with Tim Sears and we confirmed that they are consistent with the  plans reviewed by the Yarmouth Historic Commission back in 2019.  With the Historic Commission’s determination and  the plans confirming less than 25% of the floor area being impacted, you are good to go from my perspective.  Please let me know if you have any questions.  Best regards,  Karenh    Karen M. Greene, Director of Community Development  Town of Yarmouth  kgreene@yarmouth.ma.us  508‐398‐2231 x1278    From: Justin Vuono [mailto:jvuono@meyerandsons.com]   Sent: Friday, October 1, 2021 1:23 PM  To: Greene, Karen <KGreene@yarmouth.ma.us>  Cc: Sears, Tim <tsears@yarmouth.ma.us>; Old Kings Highway <okh@yarmouth.ma.us>; Trevor Meyer  <tmeyer@meyerandsons.com>  Subject: Re: 33 Pleasant Health sign off OK  Hi Karen, We've reviewed the demo in more detail to be certain the calculations are accurate. Attached you will find the proposed plans with demo areas highlighted in red as well as a breakout of the calculations supporting the 23% (actually 22.85% including porch). Please Note that all areas being demo'd are being replaced in-kind. Let me know if you have any questions or need anything else. Thanks, Justin -------- Justin Vuono Operations Manager Meyer and Sons, Inc "your project is our reputation" P: 917.538.4469 Email: jvuono@meyerandsons.com   10/01/ 2021 Floor Area Calculation        1 Greene, Karen From:Greene, Karen Sent:Wednesday, March 2, 2022 11:53 AM To:'Julie Mockabee' Cc:Sherman, Lisa Subject:FW: 33 Pleasant Street Response from Sarah.  Please note I included in my previous email to you the information Sarah notes as missing (2019  summary).  Note also, I’ve forwarded the same to her.    Thanks,    Karen M. Greene, Director of Community Development  Town of Yarmouth  kgreene@yarmouth.ma.us  508‐398‐2231 x1278    From: Sarah Korjeff [mailto:skorjeff@capecodcommission.org]   Sent: Tuesday, February 22, 2022 5:42 PM  To: Greene, Karen <KGreene@yarmouth.ma.us>  Cc: Sherman, Lisa <LSherman@yarmouth.ma.us>; Sears, Tim <tsears@yarmouth.ma.us>; Chloe Schaefer  <chloe.schaefer@capecodcommission.org>; Jordan Velozo <jordan.velozo@capecodcommission.org>  Subject: Re: 33 Pleasant Street  Hi Karen,  I think you may have omitted the 2019 materials in what you sent, but I think I have a pretty good  understanding of the project.  Based on the photographs submitted, it looks like there was historic material  lost when they demolished the middle section.  I am always skeptical of determinations that an area is "unsafe  and needs to be demolished."  I have seen many cases where additional bracing or supports are added to the  existing frame while still keeping the original materials that hold the building's history.  I suspect that the  middle section of this building could have been addressed that way.    At this point, I think it makes sense for the Historical Commission to review the revised plans (showing all new  construction rather than just second floor alterations) and determine whether the applicant will adequately  replicate the materials and details that were lost and whether the remaining historic structure will be  adequately protected during the work.  The applicant should submit a letter and plans to show how they will  address these concerns.  I would not recommend allowing work on the right hand part of the building while  the middle is being reviewed because it could limit the board's decision options.  In addition, it seems  appropriate to create a disincentive to demolish areas that were intended to be preserved.      The Historical Commission has the right to refer this project to the Cape Cod Commission for DRI review, but  our review in this case would likely not require anything beyond what I described above.  Since our review  Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. 2 thresholds are cumulative, any additional work proposed on the historic building could trigger Cape Cod  Commission review.    Let me know if you'd like to discuss this further.  Sincerely,  Sarah          Sarah Korjeff Planner II (Historic Preservation Specialist) Cape Cod Commission 508-744-1215 skorjeff@capecodcommission.org   From: Greene, Karen <KGreene@yarmouth.ma.us>  Sent: Wednesday, February 16, 2022 4:36 PM  To: Sarah Korjeff <skorjeff@capecodcommission.org>  Cc: Sherman, Lisa <LSherman@yarmouth.ma.us>; Sears, Tim <tsears@yarmouth.ma.us>  Subject: 33 Pleasant Street CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.  Hi Sarah  Regarding the above, I’m attaching some history (apologies for the large file) that shows the evolution of the project  from the historical commission’s pov – the original 2019 review, the fall 2021 inquiry/floor area calculations, and the  most current information following the stop work order.  The following is a link to the building department’s laserfiche  records:      https://lf.yarmouth.ma.us/WebLink/DocView.aspx?id=1627286&dbid=0&repo=LASERFICHE        Also, I just spoke with the owner (Jesse Connell) who would ideally like to be able to continue working on the “right”  side while the “middle” is discussed.  Thoughts?     Karen M. Greene, Director of Community Development  Town of Yarmouth  kgreene@yarmouth.ma.us  508‐398‐2231 x1278     1 Greene, Karen From:Greene, Karen Sent:Tuesday, March 1, 2022 7:34 PM To:'Trevor Meyer' Cc:Sherman, Lisa; jesse@pitchpinebuilding.com; Sears, Tim Subject:RE: 33 Pleasant Street Hi Trevor/Jesse  I am trying to get the item on the YHC’s agenda for 3/10.  I think that what Jesse has put together in his email below  should be helpful to the Commission.  I understand that what is being proposed for an end product has not changed, but  also understand that some updated plans are required by the Building Department.  Ideally, these would be in hand  before the Commission meets.  I will follow up with you both as soon as the meeting date is confirmed. Hopefully  tomorrow.  Best regards,  Karen    Karen M. Greene, Director of Community Development  Town of Yarmouth  kgreene@yarmouth.ma.us  508‐398‐2231 x1278    From: Trevor Meyer [mailto:tmeyer@meyerandsons.com]   Sent: Tuesday, March 1, 2022 1:14 PM  To: Greene, Karen <KGreene@yarmouth.ma.us>  Cc: Sherman, Lisa <LSherman@yarmouth.ma.us>; jesse@pitchpinebuilding.com  Subject: Re: 33 Pleasant Street  Karen, Just touching base to see if you had returned to the office and if you were able to touch base with the chairman of historic, has a date been set to have a discussion about our project? Thank you, Trevor Meyer, Principal Meyer and Sons Builders, Inc. 852 Main St, West Dennis, MA 02670 cell: (508) 776.6027 RE Sales # 9575525 CSL #101957 HIC #187252 www.meyerandsons.com Leave us a 5 star review here! Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. 2 "your project is our reputation" Email transmissions are not encrypted and therefore are not secure. The information in this document may contain confidential and/or privileged information and is intended solely for the use of the individual/entity named above. Any disclosure, copying, distribution or use of this information is strictly prohibited. If you have received this communication in error, please notify us at the above telephone number and delete this electronic message. On Thu, Feb 24, 2022 at 11:08 AM Jesse Connell <jesse@pitchpinebuilding.co> wrote: Hi Karen, Thanks for the follow up email this morning. I appreciate your attention to this matter. I am hopeful that we can all come to a quick resolution. I just wanted to reiterate what Trevor wrote in his email since it was I who worked with Joseph Dick on these plans for nearly three years. The plans that are on file and were previously approved show all the planned/proposed final details in regards to siding, trim, windows, and doors. We are NOT changing any of those details. It has always been my goal to bring this historic home back to life and complete a renovation that flows seamlessly into the historic structure on the left that is not being disturbed in this project. To give a little context, we bought this house in 2016 and have completed significant improvements to the existing left structure while maintaining historical significance. We replaced the roof shingles, repointed the three chimney’s, replaced all the siding with new Boral true bevel siding to match the previous look and reveal, replaced 28 windows with new Marvin replacement windows that matched the look and style of the previous windows, while re-wiring the whole house to get rid of the knob and tube wiring. While designing this current renovation, we planned on using the same siding as we previously used, the same windows as we previously installed, and matching the details of the existing casing and cornice work. The current plans accurately show what we are planning to do. In fact, we have saved and plan to reuse the old porch columns and railings/balusters that were previously buried behind Anderson casement windows and T-111 plywood siding from the 1990’s. What we are building is more accurately in line with what was originally built than what we had a just few months ago. The only thing that has changed is how the middle section of the house will be framed and supported. This change means that we added a total of 5% more in structural demo than we originally planned (25% to 30%). The approved plans called for working with the existing front/rear wall framing and first floor joists but that was deemed unworkable given the lack of any foundation whatsoever and framing spacing that could not support a second floor as planned. We now have a crawl space foundation where there was none and we are adding new floor framing to the first floor of the middle section as well as a new front and rear wall in that middle section. If we kept what was there, we would have had to sister so many new framing members to the existing that they existing would be unrecognizable. During the construction process so far, we have followed all the building codes and PASSED all our on-site inspections for the footing, foundation, water proofing and backfill by the yarmouth building inspector. Again, the yarmouth historic department nor the cape cod historic commission need to worry that any historic elements will be lost in this build. We are planning to build what was approved. The relief we are seeking has nothing to do with the final look of the home. We are seeking to move forward with our original plan with an update to the STRUCTURAL details involved in the build. Also, the footprint has not changed. The new crawlspace foundation is exactly where we have it drawn on the current plans and survey. It is reasonable for us to revise the structural framing plan to show this change in work and that is what we plan on doing and resubmitting. This revision will be added to the current plans on file. This revision is structural only. It will show the new crawl space foundation where there previously was none and show two new framed walls and a new floor system on the first floor. This framing will match what was already approved for the right side of the project. 3 In regards to protecting the existing structure….what was demo’d doesn’t affect the previously approved plan. That portion of the house gets tied in the same way as it did before. We have been painstakingly repainting and updating that portion of the house over the last five years and it will be tied in same as before. However, the longer this drags out, the longer my home is exposed to the elements and potential for animals crawling under the existing home or worse inviting someone to break in to an unoccupied home. In closing, we regret taking down the two first floor walls in the middle section of the home, however it was deemed a safety concern as it was not supported at all like we thought. We cannot go back and put it back but what is there now gives this home an opportunity to last significantly longer than it would have. I grew up on the bass river and I have seen home after home get torn down and completely rebuilt (especially on the water). I am trying to maintain the historical significance of this home and stay true to its roots. I do not feel what was removed affects the overall goal of the project. I have support from all my neighbors and they are eager and excited for this to be done. Five years ago, they had vacant and overgrown home in disrepair. I bought it with intention of giving it new life and to provide a haven for my for kids to enjoy their childhood on the Cape. I would appreciate a speedy resolution to this matter so that we can continue with the project. If anyone wants to talk about this over the phone, please call me at 240-417-4943. Thanks Jesse, Kristen, Owen, Zoë, Violet, and Benji Connell On Thu, Feb 24, 2022 at 10:00 AM Trevor Meyer <tmeyer@meyerandsons.com> wrote: Karen, I think there is misunderstanding when it comes what the look of what this center section is to become when it is re-constructed. It is to look exactly as its represented in the plans dated that are previously approved. The details on the plans are representative of the finished product. The existing porch columns are going to be maintained, and the railing are to be maintained. The plans that you have on file, are the only plan set that needs to be reviewed, they show the details of the porch, they show the columns, they show the railings, they show the trim details, they show the window details. I don't believe any new plans will show a better representation of our goal to mimic all the existing details of the previous structure, than what you have already. New trim on the porch, new windows, decking, and sidewall for the middle section were always part of the original plan to complete. To reiterate, the only changes being made from was originally approved is: new foundation to support this section, new framing of a floor system, and 2 new walls on the first floor middle section. We are only talking about framing and a foundation for the middle section that is in question. We can draft a letter per your request, but would like to know when this matter can be scheduled for a hearing seeing that the plan set is already on file. You can call me if we need to clear up any of this confusion, we are ready at a moments notice, and the board convenience to appear and move this project forward. Thank you,