SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out creage
r I �� Commercial: Residential: x
" ► t
Street: J
Village: Floor Plan: 4€' # Bedrooms:
Owner: Installer: cat
t
Address: Phone:
Phone: ��n.(!N /L,,e I`/
Builder' Engineer: 17044 Mt a-frk-
Address: Phone:
Phone:
N/A YES/ NO
1.Required#of copies received ✓
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table vV
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: v'
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: i .
9.Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V
11. Tank/leaching minimum 10 ft from property line Var.: 1/
12. System meets all other setback requirements Var.:
- 13. Uses adjustment for maximum high groundwater Var.: - V
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons) or 5' removal t...107Ll 1yi `/f
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", ''A"preferred v
18. System meets breakout requirements eyfrmW jar PVC liner: V Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee ✓
20. Sewage is under 10,000 gpd for parcel t -
21.No garbage disposal ✓
22. System adequately sized for its intended use
23. Minimum 6" stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade • ✓�
25. Inspection port on plastic chambers/leach field /
26. Electrical permit for pump chamber/Separate meter for duplexes v�/
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
_ 28. Septic tank/pump chamber to be factory waterproofed �'
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify 1>'t 1- f 1 soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓
_ 33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map /
Plan reviewed by: 6/03/03 ✓