Loading...
HomeMy WebLinkAboutReview Checklist lirP' -i/t/Ge_.-C_____ . 0(10 OtcC TOWN OF YARMOUTH vE PLAN REVIEW CHECKLIST Location: A.M. I Lot Zone of Contribution: In Out 5(`--- Acreage 'n Commercial: Residential: K Street: I lA V �['/'G{`' Village: Floor Plan: #Bedrooms: Owner: Installer: ;i Ok-M- 'J D(A ' Address: Phone: Phone: Builder: Engineer: 5S P'.-W&V - al"), Address: Phone: Phone: N/A YES / NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years i.-------- 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 1...---- 6. 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: I./ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V 9. Leaching minimum 100 ft from wetlands Var.: V 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: ,/ 12. System meets all other setback requirements Var.: Uses adjustment for maximum high groundwater Var.: v y 14. eaching set 4-5 ft above adj. water or bottom of test hole Var.: II K et System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable ,/--- 17. System meets slope requirements-min. 1/8", %"preferred i 18. System meets breakout requirements PVC liner: Wall: 1.------- 19. ✓19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ,/ arbage disposal t.------ . System adequately sized for its intended use _ . IK 23. Minimum 6" stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking ,/ _ 30.Buoyancy calculations for tank/pump chamber i..----- 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee,installer signature ✓ 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd v 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 0.471/L 6/03103